nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

As presidential candidate, Emmanuel Macron opposed nuclear power, now he’s all for it

Nuclear: Emmanuel Macron’s energy “at the same time”. Inheriting President Hollande’s nuclear commitments, candidate Macron had made campaign promises that were not very favorable to the atom.

But, in the middle of his five-year term, the President of the Republic has put nuclear power back at the center of France’s energy policy. To end up announcing, at the beginning of November, that it would be necessary to build new power stations.

 Les Echos 22nd Nov 2021

https://www.lesechos.fr/industrie-services/energie-environnement/nucleaire-le-en-meme-temps-energetique-demmanuel-macron-1365687

November 23, 2021 Posted by | France, politics | Leave a comment

No greenwashing in Europe to save the nuclear industry!

No “greenwashing” to save nuclear power! While several states of the
European Union support atomic energy, a collective of associations
dismantles clichés on nuclear power and reminds us that in 2020, renewable
energies (excluding hydraulic) have exceeded the nuclear energy production.

 Liberation 19th Nov 2021

https://www.liberation.fr/idees-et-debats/tribunes/pas-de-greenwashing-pour-sauver-le-nucleaire-20211119_NMDHQGAT75HLRHA5ZTQIDUH6W4/

November 22, 2021 Posted by | climate change, France, opposition to nuclear | Leave a comment

The fairy tale of cheap French nuclear power.

 The fairy tale of cheap French nuclear power. “Bread and Games” (Panem et circenses) were the strategies used in the Roman Empire to maintain power. “Cheap gasoline, inexpensive electricity and football” are election campaign strategies that are often propagated in a democracy.

In France, the nuclear industry is in decline and the nuclear company EDF is heavily indebted. At the same time, President Macron is once again promising cheap nuclear power and wants to have new small nuclear power plants built.

A small part of the financial problems of the French nuclear industry is to be solved with EU money. In this context, the fairy tale of cheap French nuclear power is popular in France and Germany, and the use of nuclear energy is praised as a miracle weapon in the lost war against nature and the environment.

 Sonnenseite 18th Nov 2021

November 22, 2021 Posted by | France, spinbuster | Leave a comment

While the French government promises a nuclear revival, its supreme auditing body warns of serious obstacles to this.

The Court of Auditors (Cour des comptes) is the supreme body for auditing the use of public funds in France. It is independent from the Government and Parliament. It has financial jurisdiction and is in charge of auditing, issuing rulings and certifying the State and Social Security accounts, as well as contributing to the evaluation of public policies.

Nuclear revival: the Court of Auditors highlights many obstacles  https://reporterre.net/Relance-du-nucleaire-la-Cour-des-comptes-pointe-de-nombreux-obstacles 19 Nov 21,

In a report published this Thursday, November 18, the Court of Auditors questions our “ability to build a new fleet of [nuclear] reactors on time and at reasonable costs”. This, while “maintaining a 50% nuclear share in electricity production (…) beyond 2050 would require ultimately not having seven EPR or EPR2, but 25 to 30 in the assumption that the current reactors would almost all be shut down by this time, ”the text specifies. And that the composition of the new mix must be decided between 2022 and 2027, believes the institution, given the delays in the construction of new plants.

The report from the Court of Auditors

In this document entitled “The choices of electricity production: anticipating and controlling technological, technical and financial risks”, the wise men of the rue Cambon recall the slippages of cost – 19 billion euros instead of the 3 billion planned – and of deadlines – at least eleven years late – of the Flamanville EPR site. “The gaps are similar for the Olkiluoto RPE in Finland,” they said. In July 2020, the Court of Auditors detailed these troubles at length in a report dedicated to the EPR sector.

Several points of real concern are mentioned.

One is the locations of these new reactors, “as climate change can make the installation of sites along rivers more complicated”.

Management of spent fuel and waste: the construction of new reactors planned to operate until 2100 would in fact involve “either renewing the fuel reprocessing plant at La Hague (…) and creating new sites for ‘warehousing and then disposal of nuclear waste, or to propose another mode of management of spent nuclear fuel and waste which would be, in such a hypothesis, much more voluminous ”, we read in the note.

Another imperative element for the implementation of this half-nuclear mix emphasized by the Court is “the start of the Cigeo radioactive waste disposal project” – a project that is also marred by many uncertainties.

The cost, finally. “EDF will not be able to finance the construction of new nuclear reactors on its own when it has to bear the cost of extending the current fleet and of the“ post Fukushima ”safety investments, face the future costs of dismantling and the uncertain evolution regulated access to historic nuclear power since its inception in 2011, and that it is already indebted to the tune of 42 billion euros, ”warns the Court of Auditors. The project to build six new EPRs had been estimated at 46 billion euros by EDF and could be half-financed by the state, as reported by Reporterre. The cost of the investment has since been reassessed from 52-56 billion euros to 64 billion euros, according to a working document released at the end of October by the media Context.

The implementation of a 100% renewable energy mix also represents many challenges, nevertheless warns the Court of Auditors. It would thus be necessary to define modalities for storing energy (batteries, etc.) at an affordable cost and to overcome implementation difficulties linked to geography, regulations and even social acceptability.

In any case, “the holding of an informed democratic debate would encourage choices made with full knowledge of the facts and then followed up with lasting effects”, recommends the institution. This debate could take place in 2023 during the preparation of the next multiannual energy program, the roadmap for France’s energy policy.

The publication of this report comes at a time when debates rage on the definition of the electricity mix of the future. On October 25, the electricity transmission manager unveiled its six electricity scenarios for 2050: three give pride of place to the atom. Less than three weeks later, Emmanuel Macron promised the construction of new nuclear reactors in France during a televised address.

November 20, 2021 Posted by | business and costs, France, politics, Reference | Leave a comment

France has multiple nuclear problems – costs, wastes, safety and more …..

MAXPPP OUT Mandatory Credit: Photo by LUDOVIC MARIN/POOL/EPA-EFE/Shutterstock (10695784ad) French President Emmanuel Macron takes part in a working session during the G5 Sahel Summit in Nouakchott, Mauritania, 30 June 2020. The leaders of the G5 Sahel West African countries and their ally France are meeting to confer over their troubled efforts to stem a jihadist offensive unfolding in the region, six months after rebooting their campaign in Pau, southwestern France. G5 Sahel Summit in Nouakchott, Mauritania – 30 Jun 2020

Cost, waste management and safety: eight questions raised by the announced
return of nuclear power in France. Emmanuel Macron said he wanted new
reactors, in the name of France’s energy independence and climate
preservation. But where is the sector and what does this choice imply?

 Le Monde 18th Nov 2021

https://www.lemonde.fr/economie/article/2021/11/18/cout-gestion-des-dechets-recherche-huit-questions-autour-de-la-relance-du-nucleaire_6102504_3234.html

Electricity production choices: anticipate and control technological,
technical and financial risks.

 Cour des Comptes 18th Nov 2021

https://www.ccomptes.fr/fr/publications/les-choix-de-production-electrique-anticiper-et-maitriser-les-risques-technologiques

 Nuclear revival: the Court of Auditors highlights many obstacles.

 Reporterre 18th Nov 2021
 https://reporterre.net/Relance-du-nucleaire-la-Cour-des-comptes-pointe-de-nombreux-obstacles

November 20, 2021 Posted by | business and costs, France, politics, safety | Leave a comment

France’s Court of Audit wants a debate on nuclear power decisions – in view of delays and costs in this sector.

Electricity production choices: anticipate and control technological,
technical and financial risks. COURT OF AUDIT,19 Nov 21,

The Court publishes notes that are part of a body of work carried out on several major public policies, which identify both the main challenges that public decision-makers will face in the coming years, and the levers likely to overcome them. As an extension of the report "A public finance strategy for exiting the crisis", submitted last June to the President of the Republic and the Prime Minister, this series of publications allows the Court to express itself on structural issues. With these educational notes, the Court is placing itself at the heart of its mission to inform citizens, at a key democratic moment.

Nearly 70% of French electricity production is provided by nuclear reactors, two-thirds of which will have ceased to produce before 2050. To renew this large part of our electricity production capacity, new means of production - “Carbon-free”, in accordance with France's climate commitments - will require not only a considerable financial investment, but also significant construction delays. This situation calls for urgent decisions now, aimed at securing the needs of an increasing energy supply.

 In this perspective, the Court of Auditors considers it necessary to hold a debate on the choice of electricity production, which constitutes a technological, technical and industrial challenge, and the consequences of which in terms of employment and development of the territory will reverberate over several decades. Cour des Comptes 18th Nov 2021

 https://www.ccomptes.fr/fr/publications/les-choix-de-production-electrique-anticiper-et-maitriser-les-risques-technologiques

November 20, 2021 Posted by | business and costs, France | Leave a comment

Non government organisations anxious about Tricastin nuclear station, and about historic law to protect whitleblowers

After Tricastin, we must “protect the whistleblowers and focus on the
alert and not on the messenger”. Three representatives of non-governmental
organizations recall, in a forum at “The World”, the importance of “the
historic law” that the National Assembly is about to vote on the protection
of whistleblowers. They are also calling for the opening of a parliamentary
inquiry into the facts relating to the Tricastin nuclear power plant.

 Le Monde 15th Nov 2021

https://www.lemonde.fr/idees/article/2021/11/15/apres-tricastin-il-faut-proteger-les-lanceurs-d-alerte-et-se-focaliser-sur-l-alerte-et-non-sur-le-messager_6102133_3232.html

November 18, 2021 Posted by | France, Legal, secrets,lies and civil liberties | Leave a comment

The degraded state of France’s nuclear fleet, and concealment of series of accidents.

French nuclear fleet: degraded condition, concealment of serial accidents
in nuclear power plants. The techno-industrial system includes major
accidents in its planning calculations – adapting to its disasters or
fighting to its end?

 Ricochets 15th Nov 2021

https://ricochets.cc/Parc-nucleaire-francais-etat-degrade-dissimulations-d-accidents-en-serie-dans-des-centrales-nucleaires_s-adapter-aux-desastres-ou-lutter.html

November 18, 2021 Posted by | France, safety | Leave a comment

French unions complicit with EDF in harrassments and other scandals

 EDF, the grinding machine: “EDF holds the unions in its hands”. Number 2
in Force Ouvrière at EDF, Rémy Casabielhe has been one of the main
negotiators of the agreements in recent years within the company.

In his
interview with Blast, after the first stages of our investigation, the
union representative bluntly denounces the inaction of management, but also
of the unions, in the face of the problems of harassment, discrimination
and suicide.

And calls into question the agreements concluded for twenty
years, responsible for this phenomenon. Words that detonate and lift the
veil on a complicity that does not speak its name.

 Blast 13th Nov 2021

https://www.blast-info.fr/articles/2021/edf-la-machine-a-broyer-edf-tient-les-syndicats-entre-ses-mains-VGWOUc41RgOoiPVRXI8uzg

November 16, 2021 Posted by | France, secrets,lies and civil liberties | Leave a comment

EX manager sues EDF over safety concerns

A former manager at EDF’s Tricastin nuclear plant in southern France has
filed a complaint in a Paris court alleging the state-owned utility failed
to report or minimised safety concerns at the plant, Le Monde newspaper
reported on Friday.

The newspaper said the plaintiff, whom it did not name,
filed the lawsuit in early October at the Paris judicial court. It said the
plaintiff was also suing EDF for harassment, without detailing those
allegations. EDF declined to comment on the allegations, but said safety at
its nuclear sites was its priority. “Transparency and compliance with
regulations are strictly applied and respected at all sites”, it said.

 Yahoo 12th Nov 2021

https://uk.finance.yahoo.com/news/ex-manager-sues-edf-over-123859453.html

November 15, 2021 Posted by | France, Legal, safety | Leave a comment

France: public inquiry for the authorization to reprocess new fuels

**France – Reprocessing**

 A public inquiry for the authorization to reprocess new fuels, particularly from foreign heavy water or MOX reactors, is open until
November 17, 2021. It is closely following another survey for the densification of the C D E swimming pools at La Hague in order to increase spent fuel storage capacity by 30%. Based on files with blackened lines, it only confirmed decisions already taken.

 Crilan 12th Nov 2021

http://crilan.fr/densification-des-piscines-de-la-hague-mayak-en-cotentin-non-merci/

November 15, 2021 Posted by | France, reprocessing | Leave a comment

President Macron does not have the legal power to decide on new nuclear reactors – requires Parliamentary agreement

MAXPPP OUT Mandatory Credit: Photo by LUDOVIC MARIN/POOL/EPA-EFE/Shutterstock (10695784ad) French President Emmanuel Macron takes part in a working session during the G5 Sahel Summit in Nouakchott, Mauritania, 30 June 2020. The leaders of the G5 Sahel West African countries and their ally France are meeting to confer over their troubled efforts to stem a jihadist offensive unfolding in the region, six months after rebooting their campaign in Pau, southwestern France. G5 Sahel Summit in Nouakchott, Mauritania – 30 Jun 2020

 Emmanuel Macron does not have the legal power to decide on his own the order for new nuclear reactors, as he announced he wanted to do, Tuesday, November 9, denounces the former Minister of the Environment, former MEP and famous lawyer specializing in the ecology, Corinne Lepage.

The President of the Republic must first seize the Parliament in order to comply with the multiannual energy programming.

 Ouest France 10th Nov 2021

https://www.ouest-france.fr/economie/entreprises/emmanuel-macron-ne-peut-pas-legalement-commander-des-reacteurs-seul-denonce-corinne-lepage-fa77fe4e-4224-11ec-bf34-dccbc8c1efb2

November 13, 2021 Posted by | France, politics | Leave a comment

President Macron boosts nuclear industry, but in reality, France’s prospects for new reactors are grim


too expensive, too slow and too dangerous”.

Announcing a nuclear revival and the construction of new reactors is totally disconnected from reality

Macron boosts nuclear power plans to meet France’s net-zero ambitions, The Age, By Bevan Shields, November 10

”…………………in a shift, the French President on Tuesday night, Paris time (Wednesday morning AEDT) said the country would rededicate itself to atomic power.

“…………….we will for the first time in decades revive the construction of nuclear reactors in our country………….” Macron said.

He did not give details but the comments were seen as a reference to the expected green-lighting of as many as 14 next-generation nuclear plants proposed by grid operator RTE.

Macron made the announcement against the background of the COP26 climate summit in Glasgow, where new forms of electricity generation have been identified as a key issue in the fight against climate change, and an energy crisis in Europe triggered by falling gas supplies and an unusually calm summer and autumn which has affected the output of wind turbines.

While confidence in nuclear took a hit in France following the 2011 Fukushima disaster in Japan, it is still a relatively uncontroversial technology compared to other countries such as Australia, where some Coalition MPs are pushing Prime Minister Scott Morrison to explore its feasibility.

Macron sought to tie the new nuclear push to French innovation and national pride – key themes for the President as he enters a tough presidential election campaign in 2022.

His position is in stark contrast to Germany, where nuclear power is on course to be phased out by next year.

The vast majority of France’s nuclear facilities were built in the 1970s and 1980s. A third reactor is being added to a plant in Flamanville, in the Normandy region, but the project which started in 2007 has been plagued by cost overruns and huge delays.

Greenpeace France energy transition campaigner Nicolas Nace condemned Macron’s latest announcement and pointed to the Flamanville project to claim nuclear power was “too expensive, too slow and too dangerous”.

“Announcing a nuclear revival and the construction of new reactors as the nuclear industry is totally disconnected from reality,” Nace said.

A new nuclear facility being constructed in Somerset, England, has also been hit by delays and cost blowouts.

An International Energy Agency analysis released earlier this month found global nuclear capacity would reach 582 gigawatts by 2040 – well below the 730 gigawatts needed to achieve net zero emissions.

“This gap widens even further after 2040, so long-term operation of the existing nuclear fleet and a near-doubling of the annual rate of capacity additions are required,” the report said.

“While some of this additional nuclear capacity will not come online until the late 2030s, policy decisions are required now to put nuclear back on track.”

About 20 gigawatts of new nuclear capacity need to be added each year between now and 2050 to achieve carbon neutrality – a rate of construction is comparable with the pre-Fukushima period.   https://www.smh.com.au/world/europe/macron-backs-nuclear-power-to-meet-france-s-net-zero-ambitions-20211110-p597kk.html

November 11, 2021 Posted by | France, politics | Leave a comment

Anxieties in Pays de la Loire over plan for small nuclear reactor.

With her proposal to host a mini-power plant, the president of Pays de la Loire is reviving local tensions around nuclear power. The idea of setting up an SMR on the site of the Cordemais coal-fired power station launched by
Christelle Mor Anglais, President of Les Républicains in the Pays de la Loire region, is causing concern.

 Le Monde 6th Nov 2021

https://www.lemonde.fr/planete/article/2021/11/06/avec-sa-proposition-d-accueillir-une-mini-centrale-la-presidente-des-pays-de-la-loire-ravive-les-tensions-locales-autour-du-nucleaire_6101207_3244.htmlf

November 8, 2021 Posted by | France, Small Modular Nuclear Reactors | Leave a comment

Is it green, or forever toxic? France’s radioactive waste crisis. Nuclear rift at climate talks

Is it green, or forever toxic? Nuclear rift at climate talks

By ANGELA CHARLTON, 4 Nov 21,   SOULAINES-DHUYS, France (AP)
— Deep in a French forest of oaks, birches and pines, a steady stream of trucks carries a silent reminder of nuclear energy’s often invisible cost: canisters of radioactive waste, heading into storage for the next 300 years.

As negotiators plot out how to fuel the world while also reducing carbon emissions at climate talks in Scotland, nuclear power is a central sticking point. Critics decry its mammoth price tag, the disproportionate damage caused by nuclear accidents, and radioactive leftovers that remain deadly for thousands of years.

……… Many governments are pushing to enshrine nuclear energy in climate plans being hashed out at the conference in Glasgow, known as COP26. The European Union, meanwhile, is debating whether to label nuclear energy as officially “green” — a decision that will steer billions of euros of investment for years to come. That has implications worldwide, as the EU policy could set a standard that other economies follow.

But what about all that waste? Reactors worldwide produce thousands of tons of highly radioactive detritus per year, on top of what has already been left by decades of harnessing the atom to electrify homes and factories around the world.

Germany is leading the pack of countries, mainly within the EU, standing firmly against labeling nuclear as “green.” …..

nowhere in the world is as reliant on nuclear reactors as France, which is at the forefront of the pro-nuclear push at the European and global level. And it’s among leading players in the nuclear waste industry, recycling or reprocessing material from around the world.

South of the World War I battlefields of Verdun, trucks bearing radioactivity warning stickers pull into a waste storage site near the village of Soulaines-Dhuys. They’re repeatedly checked, wiped and scanned for leaks. Their cargo — compacted waste stuffed into concrete or steel cylinders — is stacked by robotic cranes in warehouses that are then filled with gravel and sealed with more concrete.

……….. The storage units hold 90% of France’s low- to medium-activity radioactive waste, including tools, clothing and other material linked to reactor operation and maintenance. The site is designed to last at least 300 years after the last shipment arrives, when the radioactivity of its contents is forecast to be no higher than levels found in nature.

For longer-life waste — mainly used nuclear fuel, which remains potentially deadly for tens of thousands of years — France is laying the groundwork for a permanent, deep-earth repository beneath corn and wheat fields outside the nearby stone-house hamlet of Bure.

Some 500 meters (yards) below the surface, workers carry out tests on the clay and granite, carve tunnels and seek to prove that the long-term storage plan is the safest solution for future generations. Similar sites are under development or study in other countries, too.

If the repository wins French regulatory approval, it would hold some 85,000 metric tons (94,000 tons) of the most radioactive waste produced “from the beginning of the nuclear era until the end of existing nuclear facilities,” said Audrey Guillemenet, geologist and spokesperson for the underground lab.

“We can’t leave this waste in storage sites on the surface,” where it is now, she said. “That is secure, but not sustainable.”

The 25 billion euro ($29 billion) cost of the proposed repository is already built into budgeting by French utilities, Guillemenet said. But that’s just one piece of the staggering cost of building and operating nuclear plants, and one of the reasons that opposition abounds.

All around Bure, street signs are replaced with graffiti reading “Nuclear is Over,” and activists camp out at the town’s main intersection.

Greenpeace accuses the French nuclear industry of fobbing off waste on other countries and covering up problems at nuclear facilities, which industry officials deny. Activists staged a protest last week in the port of Dunkirk, as reprocessed uranium was being loaded onto a ship for St. Petersburg, demanding an end to nuclear energy and more research into solutions for existing waste.

…….. The current energy crunch is giving nuclear advocates another argument. With oil and gas costs driving an energy price crisis across Europe and beyond, French President Emmanuel Macron has trumpeted “European renewables and, of course, European nuclear.”

The waste, meanwhile, isn’t going away.

To make radioactive garbage dumps less worrying to local residents, Andra organizes school visits; one site even hosts an escape game. Waste storage researchers are readying for all kinds of potential future threats — revolution, extreme weather, even the next Ice Age, Guillemenet said.

Whatever happens in Glasgow, “whether we decide to go on with the nuclear energy or not,” she said, “we will need to find a solution for the management of that nuclear waste” that humankind has already produced. https://apnews.com/article/climate-science-business-environment-accidents-b334c5cddc50c620d53674a5b32518dd

November 6, 2021 Posted by | 2 WORLD, climate change, France, wastes | Leave a comment