nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Costs of electricity from Flamanville nuclear power station will be three times higher than from the most competitive renewable sources

 The production costs of nuclear electricity from the Flamanville EPR will be three times higher than those of the most competitive renewable sources, says Greenpeace in a report published Wednesday.

The environmental organization, which calls for a 100% renewable electricity mix by 2050-2060, highlights “a difference of the order of EUR 100 to 110 / MWh” between nuclear power from the pressurized European reactor (EPR ), the cost of which is estimated at EUR 164 / MWh, and ground-based photovoltaicand onshore wind power. It assesses the production of the historical park at EUR 72 / MWh, against EUR 52 / MWh according to EDF and EUR 48 / MWh according to the Energy Regulatory Commission (CRE).

 Montel News 24th Nov 2021

https://www.montelnews.com/fr/news/1276311/production-de-lepr-%C2%AB-3-fois-plus-chre-%C2%BB-que-celle-des-enr

November 27, 2021 - Posted by | business and costs, France

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: