nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

China’s huge bunker for leaders to survive nuclear war

Where China’s top leaders will hide to survive nuclear fallout, Scientists shed light on Beijing’s nuclear bunker located in ‘world’s most deeply buried karst caves’ SCMP, Stephen Chen 07 January, 2018, A nuclear bunker for China’s top leadership, their subordinates, troops and staff is built within the world’s most deeply buried limestone karst caves that extend more than 2km underground, beneath an unusually thick, hard layer of rock, a geological survey has found.

Located under a national park about 20km northwest of the central government’s headquarters in downtown Beijing, the fallout shelter is situated amid a network of caves that has space for a small city and a stable supply of drinking water for a million people, according to the government-funded study.

The bunker is part of the Central Military Commission’s Joint Battle Command Centre, which was revealed to the world in 2016 when state media reported that President Xi Jinping, dressed in fatigues, had visited the facility.

It is not known when either the command centre or the bunker was built but according to state media reports, work began on them decades ago and they have had major upgrades in recent years.

The command centre is referred to as the “brain” of the People’s Liberation Army because it is where all military decisions are made. Its daily operations include analysing military intelligence, monitoring activities across China’s five “battle zones” and issuing orders to military operations at home and abroad, according to state media reports.

The main entrance to the facility is located in the Western Hills National Forest Park – so in the event of a serious threat such as a nuclear strike, China’s top leaders would not have far to go from their Zhongnanhai headquarters near the Forbidden City, and the government could continue functioning from the bunker……..http://www.scmp.com/news/china/society/article/2127059/beijings-nuclear-bunker-located-worlds-most-deeply-buried-karst

January 8, 2018 Posted by | China, weapons and war | Leave a comment

Japanese taxpayers now join in Britain’s scandalous subsidising of the nuclear industry

The profitability of nuclear plant construction has been worsening all over the world

Nevertheless, the government intends to extend all-out support for the project.

Japanese gov’t to guarantee bank loans for Hitachi’s nuclear plant project in Britain https://mainichi.jp/english/articles/20180103/p2a/00m/0na/004000c  (Mainichi Japan) The Japanese government is poised to guarantee the full amount of loans that three megabanks will extend for a nuclear plant construction project in Britain by Hitachi Ltd., sources familiar with the project said.

January 7, 2018 Posted by | business and costs, Japan, politics, UK | Leave a comment

Another blow further delays China’s nuclear energy programme

CGN Power’s latest project delay deals another blow to China’s nuclear energy ambition http://www.scmp.com/business/companies/article/2126529/cgn-powers-latest-project-delay-deals-another-blow-chinas-nuclear, China’s largest nuclear reactor and builder delays commissioning of the first unit to later this yearEric Ng, eric.mpng@scmp.com    Tuesday, 02 January, 2018,  The latest commissioning delay at CGN Power’s nuclear project in Taishan, in Guangdong province – the third in two years – will lead to a further deferral of 5 billion yuan (US$770 million) in annual revenues and potentially more cost overruns, according to ratings agency Moody’s.

The delay is another setback for China’s ambitious development programme, which aims to raise its installed nuclear power capacity to 58 gigawatts by the end of 2020 from 34.73GW last year, and the world’s hopes for a successful launch of third-generation nuclear reactors.

They are touted by their designers to be safer and more efficient than second-generation ones, a key selling point after the global nuclear industry was dealt a blow by Japan’s Fukushima disaster in 2011.

“The delays reflect our concerns over the high execution risk for CGN in rolling out its aggressive expansion target and its adoption of a new generation of nuclear technology,” Ada Li, senior analyst at Moody’s, wrote in a note on Tuesday.

“The delays also imply the deferral of cash flows from the two nuclear units and potential additional capital expenditure, which would further pressure CGN’s financial metrics.”

She estimated the two reactors to initially make 5 billion yuan in annual revenues, amounting to 7 per cent of the firm’s 2016 revenues, adding its repeated delays are “credit negative”.

CGN said on Friday the first two generating reactors of the plant in Taishan – 136 kilometres west of Hong Kong – has been delayed to 2018 and 2019, from the second half of 2017 and the first half of 2018 respectively.

“As no nuclear power generating unit with the EPR [Evolutionary Power Reactor] technology has been put into commercial operation across the world … Taishan Nuclear has to conduct more experimental verifications in respect of design and equipment,” it added.

The firm in early 2015 cited a “comprehensive evaluation” of the construction plan and risks for its first delay. In the second delay early last year, it said it the needed to conduct “more experimental verifications in respect of its design and equipment”.

The project was originally expected to come on line in 2015.

Moody’s said the latest postponement will not affect its A3 issuer credit rating on CGN, which has already incorporated a six to 12-month delay.

Dennis Ip, head of Hong Kong and China utilities equities research at Daiwa Capital Markets, believes CGN will have difficulty meeting the revised target, saying in a note that he expects the first unit to start up in the first half of 2019.

Ip a year ago projected the Taishan plant’s investment cost to rise to between 22 and 23 yuan per watt from his previous forecast of 21 yuan. The company, meanwhile, had budgeted it at 14 yuan. Each unit has 1.75 billion watt of capacity.

January 3, 2018 Posted by | business and costs, China, politics | Leave a comment

Improvement of inter-Korean relations

North and South Korean ties linked to resolving nuclear issue: Moon Jae-in, SBS News 2 Jan 18South Korean President Moon Jae-in says the improvement of inter-Korean relations is linked to resolving North Korea’s nuclear programme, a day after the North offered talks with Seoul but was steadfast on its nuclear ambitions.

“The improvement of relations between North and South Korea cannot go separately with resolving North Korea’s nuclear programme, so the foreign ministry should coordinate closely with allies and the international community regarding this,” Moon said in opening remarks at a cabinet meeting on Tuesday.

Moon’s comments contrasted with those of North Korean leader Kim Jong Un, who said on Monday that Seoul should stop asking foreign countries for help in improving ties between the two Koreas.

“This shows the Moon administration is looking at the situation from a very realistic, rational point of view,” said Jeong Yeung-tae, head of the Institute of North Korea Studies in Seoul.

“It also shows resolving North Korea’s nuclear issue has a bigger priority (than improving inter-Korean relations).”RELATED

‘The nuclear button is always on my table’: North Korea leader Kim Jong-un’s warning

Moon’s comments came after a New Year’s Day speech by Kim who said he was “open to dialogue” with Seoul, and for North Korean athletes to possibly take part in the Winter Games, but steadfastly declared North Korea a nuclear power.

he South Korean president requested the ministries of unification and sports to swiftly create measures to help North Korea participate in the upcoming Pyeongchang Winter Olympics.

As for talks between the two Koreas, Defence Ministry spokeswoman Choi Hyun-soo says Seoul is awaiting a more detailed reply from Pyongyang to already-existing offers for dialogue made back in July last year by Seoul…..https://www.sbs.com.au/news/north-and-south-korean-ties-linked-to-resolving-nuclear-issue-moon-jae-in

January 3, 2018 Posted by | North Korea, politics international, South Korea | Leave a comment

Stop nuclear power expansion – says Former Chairman of India’s Atomic Energy Regulatory Board

World is Abandoning Nuclear Power

with the whole world receding from setting up nuclear plants, by the time this “major powerhouse” is established in 4-6 years, where are the foreign orders for nuclear plant components going to come from? Or, are we planning to use tax-payers’ money to continually prop up the ailing big manufacturing industries in India by giving them nuclear power orders, whether we want nuclear power or not?

India Should Halt Further Expansion of its Nuclear Power Program The Citizen, –-A. GOPALAKRISHNAN [Dr A.Gopalakrishnan is former Chairman, Atomic Energy Regulatory Board,Governmentof India. He welcomes discussions and comments from readers. They can contact him at his e-mail: agk37@hotmail.com]13 NOVEMBER, 2017

Nuclear safety is in jeopardy An overall evaluation of the status of the Indian civilian nuclear power sector, and the government’s uncertain future plans, do cause a great deal of concern for the welfare of the country and the safety of our people. Therefore, it is best to freeze all plans for the further expansion of this sector until Parliament and the public are provided full details of the government’s intentions and rationale and a national consensus is reached.

Background: The Indian civilian nuclear power program is ultimately administered by the Department of Atomic Energy (DAE) which reports to the Prime Minister.

The detailed policies, programs, and projects of both the civilian and military aspects of atomic energy are overseen and approved by a supra-powerful body called the Atomic Energy Commission (AEC).

 …… Once this group approves a program or gives a decision, no other entity like the Comptroller & Auditor General (CAG), who should be overseeing financial propriety in the Central Government expenditure or the Atomic Energy Regulatory Board (AERB) which is responsible for project & public safety, will usually dare to question the AEC decision. This top-heavy administration of the nuclear program and the fear that it exudes is at the heart of most of the ailments of the nuclear sector.
Civilian Nuclear Program: In the almost 70 years since the constitution of our AEC in 1948, the total installed capacity of nuclear power in India has reached only 6,780 MWe, comprising 22 nuclear reactors. With a total installed electricity capacity of 315,426 MWe in the country, the nuclear share is thus a minuscule 2.15 % of it.
…….Of the operating reactors, some are very old and partially disabled and others are of dangerously outdated design which DAE is continuing to operate, though recommended by the original supplier to be permanently closed down.
We are still waiting for the very first1000 MWe AP-1000 reactor of Westinghouse and the very first 1650 MWe European Pressurized Reactor (EPR) of Areva to be commissioned anywhere in the world.In the meantime, the Westinghouse Co. has filed for bankruptcy in the US and Areva is in the middle of serious technical &financial difficulties, because of which the company has been sold to the French national electricity utility EDF.However, even before the Indo-US nuclear deal was signed, we had started building two VVER-1000 reactors with Russian collaboration, which have since been commissioned at Kudankulam in South India. The initial performance of the first of these two reactors is still not satisfactory, and the BJP had then agreed that apprehensions of the local population about the plant were genuine and the Centre should address the public’s issues. Notwithstandingthis, thegovernment had entered into an agreement to purchase four (4) more VVER reactors to be set up in the same site at Kudankulam…..

…….As part of the Indo-US nuclear Deal, India agreed in writing to purchase about 10,000 MWe of US power reactors and a similar package of French reactors, in return for the support of US & France at the Nuclear Suppliers’ Group (NSG). The NSG ultimately permitted India to retain part of its military nuclear facilities outside of IAEA safeguards, while being allowed to place the rest under safeguards and regular international inspection
……..Preliminary agreements were discussed with Westinghouse Corporation and the General Electric Co. of the US, as well as with Areva of France as early as in 2009-2010, for purchasing their large light-water reactors (LWRs) which were then under development.

We are still waiting for the very first1000 MWe AP-1000 reactor of Westinghouse and the very first 1650 MWe European Pressurized Reactor (EPR) of Areva to be commissioned anywhere in the world.In the meantime, the Westinghouse Co. has filed for bankruptcy in the US and Areva is in the middle of serious technical &financial difficulties, because of which the company has been sold to the French national electricity utility EDF.

However, even before the Indo-US nuclear deal was signed, we had started building two VVER-1000 reactors with Russian collaboration, which have since been commissioned at Kudankulam in South India. The initial performance of the first of these two reactors is still not satisfactory, and the BJP had then agreed that apprehensions of the local population about the plant were genuine and the Centre should address the public’s issues. Notwithstandingthis, thegovernment had entered into an agreement to purchase four (4) more VVER reactors to be set up in the same site at Kudankulam…..

…..Post-Fukushima accident, such realities gave a spurt to shunning nuclear power generation and motivated several countries to seriously consider setting up renewable electricity systems in their countries. At last year’s UN Climate Change Conference in Paris, Indian PM Modi also pledged that by 2022, India would set up 175 GW of renewable electric systems – 100 GW Solar, 60 MW Wind, 10 GW from Biomass and 5 GW from Small Hydro.

It should be noted that the delivered unit costs of electricity from solar, wind and other modes of renewable power generation have been falling rapidly in recent years and the PM’s decision could be timely for India. In India, as on March 31, 2017, the total installed solar electric power is 12,288 MW and the total installed wind power capacity is 32,280 MW. As of today, we seem to be on track to achieve PM Modi’s challenging target of 175 GW renewable powers by 2022. [Note that these MW numbers have to be associated with respective system load factors of — roughly 16-19% for solar, 20-23 % for on-shore wind and 30-41 % for off-shore wind, to obtain real-term busbar electricity one gets].

World is Abandoning Nuclear Power: Some of the countries, presently relying partly on nuclear power, are in the process of lowering or shedding the nuclear power component from their current portfolios.In France, for example, a law enacted in 2015 requires that the country should reduce nuclear power generation from the current figure of 75 % to 50% of the aggregate by 2025. This will mean shutting down 17 of the 58 nuclear reactors which their major utility EDF is presently operating.

It is, however, not finally confirmed that France will adhere to the 2025 deadline.Taiwan, on the other hand, is definite that all nuclear power in that country will be phased out by 2025. Japan has 54 nuclear reactors of which only 4 are operational now after the Fukushima accident. In view of the serious opposition by local governments and the nearby population, and in view of the tightened safety regulations, not more than 8 more reactors are likely to be re-started. In Russia, Rosatom’s Deputy General Director said in June 2017, that the world market for new nuclear plants is shrinking and possibilities for building new large reactors abroad are almost exhausted.

As against the above world trend, India appears to be blindly proceeding in the opposite direction.  On May 17 2017, India’s Union Cabinet approved the construction of 10 more 700 MWe PHWRs, in addition to four of the same kind which are presently approved for construction. The government press release says, “…With likely manufacturing orders of close to Rs. 70,000 crores to the domestic industry…it will be a major step toward strengthening India’s credentials as a major nuclear manufacturing powerhouse”.

But, with the whole world receding from setting up nuclear plants, by the time this “major powerhouse” is established in 4-6 years, where are the foreign orders for nuclear plant components going to come from? Or, are we planning to use tax-payers’ money to continually prop up the ailing big manufacturing industries in India by giving them nuclear power orders, whether we want nuclear power or not?

 Won’t Dump Westinghouse and Areva Reactors? The Nuclear Power Corporation of India Ltd (NPCIL), DAE and the government appear to be still entertaining periodic proposals and discussions regarding the purchase of the AP-1000 and the EPR reactors. No reactor of either kind has been started anywhere in the world. Today, China is regretting their foray into setting up two French EPRs and four AP-1000 reactors.
………Similarly, a senior representative told NPCIL and DAE that Westinghouse’s plans to set up six AP-1000 reactors in India are contingent on a change in the Nuclear Liability Law. He also said that Westinghouse will no longer take up the risk of building new nuclear plants and instead specialise in supplying parts and reactor engineering. Dr. Sekhar Basu, Secretary DAE, said last month that the Kovaada project in Andhra can still go ahead with Westinghouse supplying the reactor design and a different company taking up the construction. Everyone in the Indian nuclear establishment brims with confidence that India is capable of executing the detailed engineering, construction and commissioning of the complicated AP-1000 reactors in India without any assistance from abroad!……..
The state of nuclear reactor safety in India today is suboptimal to say the least. The agency which should be overseeing nuclear safety in India, the Atomic Energy Regulatory Board (AERB), has no standing as an independent entity, no direct access to the AEC or to any of the Parliamentary committees. The Chairman of the AERB reports to the AEC Chairman, whose instructions finally dictate the AERB’s actions. In contrast, the French nuclear regulatory body (the ASN) is created under a separate Act of the French Parliament and is answerable only to their Parliament.   http://www.thecitizen.in/index.php/en/NewsDetail/index/2/12239/India-Should-Halt-Further-Expansion-of-its-Nuclear-Power-Program

January 3, 2018 Posted by | India, opposition to nuclear | Leave a comment

Pakistan and India exchange information on their nuclear installations and facilities.

Uneasy neighbors share information on nuclear facilities, http://www.mywabashvalley.com/news/uneasy-neighbors-share-information-on-nuclear-facilities/896851253, 2 Jan 18, ISLAMABAD (AP) — Uneasy neighbors Pakistan and India, who regularly trade gunfire in the disputed Kashmir region, are sticking to a 20-year-old agreement to exchange information on their nuclear installations and facilities.

In a statement Tuesday, Pakistan’s foreign ministry said the 1988 agreement requires each country to hand over the list on Jan. 1 each year, which the representatives of the two countries did on Monday. It has been adhered to every year since 1992, the statement said.

Although neither country is signatory to the Nuclear Non-Proliferation Treaty (NPT), they both became declared nuclear powers after India conducted an underground nuclear weapons test in 1998 and Pakistan followed suit a few weeks later.

Pakistan and India have fought three wars since the 1947 creation of Pakistan from a larger India.

January 3, 2018 Posted by | India, Pakistan, politics international | Leave a comment

Radioactive debris at Fukushima – a huge challenge to Japanese govt and TEPCO

Challenges ahead for debris removal at Fukushima https://www3.nhk.or.jp/nhkworld/en/news/20180102_05/ This year will mark the 7th anniversary of the nuclear accident at the Fukushima Daiichi plant that occurred in March, 2011. The plant’s operator is hoping to eventually remove fuel debris from the damaged reactors.

Fuel debris is a mixture of melted nuclear fuel and broken reactor parts. Removing the debris is considered to be the biggest hurdle to the decommissioning of the reactors.

Last year, Tokyo Electric Power Company, or TEPCO, investigated the inside of the containment vessels of 3 reactors and confirmed, for the first time, the existence of lumps that are believed to be fuel debris in the No.3 reactor.

TEPCO plans to conduct a fresh probe of the No.2 reactor this month to confirm whether a mass on the floor under the reactor, observed last year, is actually fuel debris.

The government and TEPCO aim to begin removing debris in 2021. They are planning to determine which reactor to start with, and how to conduct the procedure, during fiscal 2019.

Workers will try this year to figure out which details need to be considered in order to make the decision.

Removing the debris requires thorough safety measures. For example, radioactive materials must be prevented from spreading and workers must be protected from exposure to radiation.

This autumn, the operator also plans to start removing spent nuclear fuel rods from the storage pool of the No.3 reactor building.

January 3, 2018 Posted by | Fukushima continuing | Leave a comment

ISIS supporters in Malaysia, and plans to make a “dirty bomb”

The militants had hoped to transform low-grade radioactive Thorium 232 (Th-232) into deadly Uranium 233 (U-233). When combined with powerful home-made explosive triacetone triperoxide (TATP), the concoction can create a “nuclear bomb”, according to an instruction manual used by the militants and reviewed by Reuters.

IS supporters in Malaysia may build bombs with radioactive materials,  Today online 02 JANUARY, 2018, KUALA LUMPUR — Fears are growing that fighters from the Islamic State (IS) group, including their sympathisers in Malaysia, may attempt to build bombs using radioactive materials.

This concern is especially real as the Malaysian police have recorded no less than 20 cases involving radioactive and nuclear materials which have “gone missing” over recent years.While some may have been retrieved, the whereabouts of many others remain unknown.

Perturbed by the combination of “missing radioactive goods and IS”, sources in security agencies said it was crucial for the counter-terrorism division to aggressively trace the missing radioactive materials.Normally, these cases will be investigated by the police’s Criminal Investigation Department. However, it should not be treated as a usual case of theft,” the sources said.

“There is a need to trace who the perpetrators are, their background, contacts and find out their motives. These are all vital information that must be cross-checked to ensure that these dangerous materials do not fall into the wrong hands.”

The sources also warned that terrorists might make use of radioactive and nuclear materials which had not been categorised as “controlled items”.

“There are two groups of radioactive and nuclear materials: those which are controlled and monitored by the authorities, and the others that we cannot control as they are stolen or improperly disposed off.”

Concerns about security threats in South-east Asia intensified when Indonesian security forces recently foiled an attempt by militants to detonate a dirty bomb.A dirty bomb is a conventional bomb that contains radioactive material.

The plot was foiled when police raided homes and arrested five suspects in Bandung, West Java in August last year. After the raids, police spoke of a plan to explode a “chemical” bomb but provided no other details.

The militants had hoped to transform low-grade radioactive Thorium 232 (Th-232) into deadly Uranium 233 (U-233). When combined with powerful home-made explosive triacetone triperoxide (TATP), the concoction can create a “nuclear bomb”, according to an instruction manual used by the militants and reviewed by Reuters.

Malaysia has been on high alert since gunmen linked to the IS launched multiple attacks in Jakarta in January 2016 and has arrested hundreds of people over the past few years for suspected links to militant groups, and has arrested hundreds of people over the past few years for suspected links to militant groups.

Malaysia’s Atomic Energy Licensing Board (AELB) director-general Hamrah Mohd Ali cautioned the authorities against underestimating terrorists’ knowledge and capabilities in utilising radioactive and nuclear materials to produce dirty bombs.

He said his agency had, several times, found abandoned radioactive materials with unclear origins and purpose……. http://www.todayonline.com/world/supporters-malaysia-may-build-bombs-radioactive-materials

January 3, 2018 Posted by | Malaysia, thorium, weapons and war | 1 Comment

Concern in Malaysia over radioactive thorium and uranium in building materials

No Inspections At Construction Sites Without Strong Proof Of Radioactive Readings: Mosti, Malaysian Digest, 02 January 2018 , KUALA LUMPUR: Inspections at construction sites will not be carried out until there is strong proof of elevated readings on radioactivity content in building materials……..

Nuclear and radiation experts yesterday had cautioned the public over potential hazards posed by naturally-occurring radioactive elements in construction materials.

Commonly found in materials naturally sourced from earth, uranium and thorium are Naturally Occurring Radioactive Materials (NORM) often found in bricks, cement blocks, granite, marble or glazed tiles used in the construction of homes.

The two elements (uranium and thorium) undergo a natural decaying process to form other harmful elements and emit several types of radiation, particularly alpha, beta or gamma rays.

Atomic Energy Licensing Board (AELB) director-general Hamrah Mohd Ali previously said a statement that excessive exposure to these rays could damage human tissue and cells, and cause health issues or death.

He said apart from the dangers of being exposed to lethal radiation, uranium and thorium also produced radon and thoron, which are also lethal gases……

If concern arises with regards to radioactivity in any areas across the nation, Mosti advised the public to contact AELB so that further measures can be taken immediately. http://malaysiandigest.com/news/715810-no-inspections-at-construction-sites-without-strong-proof-of-radioactive-readings-mosti.html

January 3, 2018 Posted by | Malaysia, thorium | Leave a comment

Former US UN Ambassador John Bolton says that only US military action can stop North Korea’s nuclear arsenal

North Korea SHOCK warning: US military action only option to DESTROY Kim’s nuclear arsenal, Sunday Express, AURORA BOSOTTI, 31 Dec 17,  NORTH KOREA will not give up its nuclear arsenal unless the United States military intervenes to “pre-emptively destroy” it, former US UN Ambassador John Bolton said.

North Korea has refused to heed calls to stop its nuclear development programme and continues to fuel fears of World War 3 within the international community.

Mr Bolton warned that military action from the US would be the only possibility to ultimately end Kim Jong-un’s threat campaign.

He said: “I think we are going to come down to a binary choice. That is the use of military force is one possibility to pre-emptively destroy North Korea’s nuclear and ballistic missile capabilities. Or we allow North Korea to have nuclear weapons.”

Mr Bolton warned Pyongyang would not give up its weapons as it nears full nuclear capability.

The former US ambassador told Fox News: “There’s zero chance that after 25 years of pressure, this close to the finish line, they are going to give it up.

“It’s not going to happen.”

North Korea was hit with a swathe of new sanctions after defying orders to terminate its nuclear development programme and conducting several missile tests – threatening both Japan and the US overseas territory of Guam…..

January 1, 2018 Posted by | North Korea, USA, weapons and war | Leave a comment

Is Fukushima a healthy place to play Olympic ball games?

The Japanese government wants to show the fake side of Fukushima,”

Large swaths of Fukushima remain uninhabitable, with cleanup at the plant estimated to take up to 40 years and cost almost $200 billion

Would You Play Ball at Fukushima?, NYT,  FUKUSHIMA, Japan — A sea of brightly colored banners and advertisements decorated Fukushima train station in early November to celebrate coming road races and Fukushima United, the local soccer club.

January 1, 2018 Posted by | Japan, politics international, spinbuster | Leave a comment

About 50% of local bodies near nuke plants want say over reactor restarts

31 oct 2016.jpg
In the background, from left, the No. 1, 2, 3, and 4 reactor buildings of the Fukushima No. 1 Nuclear Power Plant are seen, in Okuma, Fukushima Prefecture, on Oct. 31, 2016. In front are tanks used to store contaminated water.
Roughly 50 percent of local governments within a 30-kilometer radius of a nuclear power plant — excluding municipalities where the plant is located — want to have a say in the restarting of nuclear reactors, a Mainichi Shimbun survey has found.
Among 121 neighboring local bodies, 60 of the 119 that provided answers in the survey said that they wanted to have a say in whether nuclear reactors can be reactivated.
Since the meltdowns at Tokyo Electric Power Co. (TEPCO)’s Fukushima No. 1 Nuclear Power Plant in 2011, the reactivation of nuclear reactors has been subject to consent from prefectures and municipalities hosting the facilities. However, taking into consideration the widespread damage and risks associated with the disaster in 2011, neighboring authorities have also been keen to get involved in the approval process.
A total of 155 local governments were targeted in the survey, which was conducted between September and November 2017 and addressed to local government heads and also to assemblies. The local authority where the Fukushima No. 1 power plant is located also took part.
Thirty-four of the 155 authorities (13 prefectural and 21 municipal) have a commercial nuclear power plant directly within their jurisdictions. The remaining 121 neighboring local bodies (eight prefectural and 113 municipal) are situated within 30 kilometers of a power plant.
Of the 155 local bodies approached, 153 local government heads — excluding those of Iitate, Fukushima Prefecture and Ikeda, Fukui Prefecture — gave answers while 154 local assemblies, excluding that of Iitate, cooperated.
Local government heads were asked whether they are for or against reactor restarts at the local nuclear power plant, the extent of their local government’s involvement, and the status of any safety agreements with electric power companies. Assemblies were asked whether or not they have adopted any written statements concerning the restarting of nuclear reactors, among other questions.
Regarding the right to approve reactivation of reactors at nuclear power plants and the right to conduct on-site investigations — which have effectively already been given to mainly local governments where plants are located — the local government heads were asked if these rights should be extended to neighboring bodies as well. In response, 56 heads stated that it was necessary to grant such rights, seven said that it is partly necessary, 24 said it was unnecessary, one head did not know, 60 gave other answers, and five did not reply.
Altogether, 60 of the 63 heads who said the granting of such rights was “necessary” or “partly necessary” belong to neighboring local governments. Of these 60 local bodies, 16 said that they are against restarting nuclear reactors.
Meanwhile, of the 24 heads who said the granting of these rights was “unnecessary,” 10 belong to local governments where a nuclear power plant is located, including Fukui Prefecture — revealing a difference in attitudes between the immediate and nearby local governments.
However, of the immediate local governments, the town of Okuma in Fukushima Prefecture — which was seriously affected by the 2011 disaster — said that the rights need to be extended on the grounds that, “Once an accident happens, the impact spreads across a wide area.”
The village of Tokai in Ibaraki Prefecture — where the Japan Atomic Power Co.’s Tokai No. 2 Nuclear Power Plant is based — was among those that replied that it is “partly necessary” to extend the rights.

31 oct 2016.jpg

December 31, 2017 Posted by | Japan | , | Leave a comment

Russia’s warning to USA and North Korea: risk of the worst war in human history

‘War worse than ANY in human history’ Russia’s stark warning to US and North Korea https://www.dailystar.co.uk/news/world-news/669884/North-Korea-War-Russia-US-Vladimir-Putin-Donald-Trump-Kim-Jong-un-Missile-Nuclear-Test, 30 Dec 17

RUSSIA has warned North Korea and the US are on course for an explosive war of a level “never before seen in human history”. US President Donald Trump and Kim Jong-un could stumble into a nuclear war of “unprecedented scale”, warned Vladimir Putin’s top diplomat Oleg Burmistrov.

Russia’s so-called ambassador-at-large predicted the start a war could be “unprovoked” and said the US it is “playing with fire” in goading North Korea.

Moscow has repeatedly called for calm in the region as Trump and Kim’s fiery war of words stoked the conflict to horrifying new heights in recent months.

Burmistrov called on the world to do “everything possible” to prevent the war that would spiral into the first use of nuclear weapons since World War 2.

North Korea is feared to be plotting another missile test before the end of the year – with US “missile sniffer” plane Cobra Ball taking flight yesterday amid Kim’s threats.Burmistrov told Sputnik: “[It could be] the catastrophe of the scale, never before seen in human history.

“We are talking not only about a major military conflict but also about a conflict that potentially has a nuclear component.

“Now we are in the face of a major military conflict, which can become a reality if the military solution plan is implemented.

“And we need to do everything possible to prevent this from happening.” Putin’s top man suggested US war drills in the region may be “testing” North Korea and looking for grounds to impose a total economic blockade on Pyongyang.

He described the region as a “powder keg” as military forces continue to march into the Korean Peninsula.

The ambassador added: “The situation on the Korean Peninsula is characterised by an unprecedented level of tension, there is a growing danger of slipping into an armed conflict, unprovoked, but which may begin due to accidental circumstances.”

Burmistrov has previously visited Pyongyang to discuss the nuclear crisis and has also hosted meetings with North Korean officials in Moscow. This week, Russian foreign minister Sergey Lavrov met with US secretary of state Rex Tillerson to discuss North Korea.

Despite separate tensions between Moscow and Washington, the two came to an agreement that they would “never accept” a nuclear-armed Kim.

North Korea is believed to be gearing up to launch a space rocket, which experts have warned could be a cover for another weapons test. Kim should be expected to carry out at least one more launch before the end of the year, North Korea expert Michael Madden told Daily Star Online.

Pyongyang is believed to have long-term ambitions to launch a nuclear missile into the heart of the Pacific.

This test is known as the dreaded Juche Bird – and has been described as Trump’s “red line” that could spark World War 3.

December 30, 2017 Posted by | North Korea, politics international, Russia, USA, weapons and war | 1 Comment

Defectors from North Korea show signs of radiation exposure

Radiation fears for North Korean defectors http://www.theaustralian.com.au/news/latest-news/radiation-fears-for-north-korean-defectors/news-story/3917a3a1dc9cd27d55d196772dd42a09,  YUNA PARK, Reuters,  December 28, 2017 At least four defectors from North Korea have shown signs of radiation exposure, the South Korean government says, although researchers could not confirm if they were was related to Pyongyang’s nuclear weapons programme.

The four are among 30 former residents of Kilju county, an area in North Korea that includes the nuclear test site Punggye-ri, who have been examined by the South Korean government since October, a month after the North conducted its sixth and most powerful nuclear test, Unification Ministry spokesman Baik Tae-hyun told a news briefing.

At least four defectors from North Korea have shown signs of radiation exposure, the South Korean government says, although researchers could not confirm if they were was related to Pyongyang’s nuclear weapons programme.

The four are among 30 former residents of Kilju county, an area in North Korea that includes the nuclear test site Punggye-ri, who have been examined by the South Korean government since October, a month after the North conducted its sixth and most powerful nuclear test, Unification Ministry spokesman Baik Tae-hyun told a news briefing.

They were exposed to radiation between May 2009 and January 2013, and all defected to the South before the most recent test, a researcher at the Korea Atomic Energy Research Institute, which carried out the examinations, told reporters.

They were exposed to radiation between May 2009 and January 2013, and all defected to the South before the most recent test, a researcher at the Korea Atomic Energy Research Institute, which carried out the examinations, told reporters.

North Korea has conducted six nuclear bomb tests since 2006, all in tunnels deep beneath the mountains of Punggye-ri, in defiance of UN Security Council resolutions and international condemnation.

The researcher cautioned that there were a number of ways people may be exposed to radiation, and that none of the defectors who lived had lived in Punggye-ri itself showed specific symptoms.

A series of small earthquakes in the wake of the last test – which the North claimed to be of a hydrogen bomb – prompted suspicions that it may have damaged the mountainous location in the northwest tip of the country.

Experts warned that further tests in the area could risk radioactive pollution.

After the September 3 nuclear test, China’s Nuclear Safety Administration said it had begun emergency monitoring for radiation along its border with North Korea.

December 30, 2017 Posted by | health, North Korea | Leave a comment

USA former Vice President Dick Cheney sabotaged diplomacy efforts with North Korea

How Cheney and His Allies Created the North Korea Nuclear Missile Crisis,    December 28, 2017, By Gareth Porter, Truthout | News Analysis, The Trump administration has been telling people for months that the crisis with North Korea is the result of North Korea’s relentless pursuit of a nuclear threat to the US homeland and past North Korean cheating on diplomatic agreements. However, North Korea reached agreements with both the Clinton and George W. Bush administrations that could have averted that threat, had they been completed.

Instead, a group of Bush administration officials led by then-Vice President Dick Cheney sabotaged both agreements, and Pyongyang went on to make rapid strides on both nuclear and missile development, leading ultimately to the successful late November 2017 North Korean intercontinental ballistic missile (ICBM) test.

The record shows, moreover, that Cheney and his allies derailed diplomatic efforts to curb North Korean nuclear and missile development, not because they opposed “arms control” (after all, the agreements that were negotiated would have limited only North Korean arms), but because those agreements would have been a political obstacle to fielding the group’s main interest: funding and fielding a national missile defense system as quickly as possible. The story of Cheney’s maneuvering to kill two agreements shows how a real US national security interest was sacrificed to a massive military boondoggle that served only the interests of the powerful contractors behind it………http://www.truth-out.org/news/item/43048-how-cheney-and-his-allies-created-the-north-korea-nuclear-missile-crisis

December 30, 2017 Posted by | North Korea, politics international, USA | Leave a comment