nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Scaffolding at No.3 Fukushima reactor missing

The operator of the Fukushima Daiichi Nuclear Power Plant says the metal scaffolding right below the damaged No.3 reactor appears to have gone missing after the 2011 disaster.
 
Tokyo Electric Power Company, or TEPCO, started a full-scale robotic probe into the containment vessel on Wednesday.
 
In the 2011 accident, most of the nuclear fuel in the No.3 reactor is believed to have melted and fallen to the bottom of the containment vessel that covers the reactor. The nuclear fuel is thought to lie within 6-meter-deep water that was injected for cooling.
 
TEPCO and the Japanese government plan to remove the nuclear fuel debris as part of decommissioning of the reactor. They are trying to locate the debris.
 
They used a new underwater robot equipped with cameras for Wednesday’s probe. It is 30 centimeters long and 13 centimeters wide.
 
Advertisement

July 21, 2017 - Posted by | Fukushima 2017 | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: