nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

TEPCO says 5.3 tons of tainted water leaked at nuclear plant

hjklm.jpg

 

 

An estimated 5.3 tons of water contaminated with radiation leaked from a pipe in a building housing cesium removal equipment at the stricken Fukushima No. 1 nuclear power plant, the facility’s operator said.

The leaked water contained 383,000 becquerels of radioactive cesium per liter and 480,000 becquerels of beta ray-emitting radioactive substances per liter.

Tokyo Electric Power Co. said March 23 the water has not flowed outside the high temperature incinerator building. TEPCO said it was in the process of pumping up the water for storage.

The utility said workers doing remodeling work earlier in the day cut off a pipe inside the incinerator building. When workers subsequently operated radioactive material removal equipment in another building, contaminated water leaked from the cut section of the pipe to the floor of the incinerator building.

TEPCO said it is trying to determine the cause of the incident, adding that workers had confirmed that they closed a valve before cutting off the pipe to prevent water leakage

http://ajw.asahi.com/article/0311disaster/fukushima/AJ201603240048

March 25, 2016 - Posted by | Fukushima 2016 | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: