nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Japanese govt caving in to “nuclear village”, but nuclear future uncertain

Many experts, though, say the nuclear interests are unlikely to win the longer-term battle given the hidden costs of atomic power exposed by Fukushima and a new set of forces pushing for a bigger role for renewable sources of energy such as solar power.

“They (the nuclear interests) are fighting with their backs to the wall”

Reactor restarts, but Japan’s energy policy in flux The Asahi Shimbun, July 04, 2012 Buffeted by industry worries about high electricity costs on one side and public safety fears about nuclear power on the other, Japan’s leaders are still struggling to craft a coherent energy policy more than a year after the Fukushima disaster.

Critics say Prime Minister Yoshihiko Noda, whose top priority is raising the sales tax to curb bulging public debt, is caving in to Japan’s “nuclear village” — a powerful nexus of utilities,
bureaucrats and businesses — by restarting the first of Japan’s 50 reactors to come back on line since the crisis. Continue reading →

July 5, 2012 Posted by | Japan, politics | Leave a comment

How nuclear radioactivity has killed Japan’s surfing industry

AUDIO Japan’s surfers lament radioactive coast, Radio Australia 2 July 2012, Japan overnight restarted a nuclear reactor – the first time it’s done so since the Fukushima disaster. The move has polarised the country, with many fearing the reactor on the country’s west coast is just as vulnerable to earthquakes and tsunamis as the Fukushima plant.

And some of those fighting hardest against the restart of more nuclear
plants are Japan’s professional surfers, who say Fukushima’s coastline
was once regarded as one of the best surfing spots in the country. Continue reading →

July 5, 2012 Posted by | environment, Japan, Resources -audiovicual | Leave a comment

Japan’s Fukushima Daini nuclear plant might never restart

Doubts linger over Japan’s nuclear future, FT.com, By Mure Dickie, Tokyo, 4 July 12,  When the world’s appalled gaze turned to Japan’s tsunami-crippled Fukushima Daiichi nuclear power station in March last year, few paid much attention to its sister atomic plant,  , Fukushima Daini,  , just 10 km south……

for all the seeming normality of the scene, Daini’s future is shrouded in doubt.

Work to fully restore safety systems damaged by the tsunami is expected to be completed by March. But even the new bosses of operator Tokyo Electric Power shy away from the question of whether Daini’s reactors will ever be turned back on. Continue reading →

July 5, 2012 Posted by | business and costs, Japan, safety | Leave a comment

Radiation at Fukushima Daini nuclear plant, from Fukushima Daiichi nuclear plant

Fukushima Watch: At Fukushima Daini, It’s Safer Inside Than Outside WSJ, July 4, 2012,  That’s because Daini is just 10 kilometers south of Fukushima Daiichi, the site of Japan’s biggest nuclear accident. And since the area still receives lots of radioactive fallout from Fukushima Daiichi, radiation exposure is less inside the thick-walled reactor buildings than it is out in the compound.

JRT, which went on a media tour of Daini on Wednesday, found that background radiation levels in the plant compound were around 0.5 to 1.0 microsieverts per hour — some 16 to 33 times higher than prior to the March 2011 accident.

In Tokyo, radiation levels are about 0.05 microsieverts per hour, in most places….
http://blogs.wsj.com/japanrealtime/2012/07/04/fukushima-watch-at-fukushima-daini-its-safer-inside-than-outside/

July 5, 2012 Posted by | environment, Japan | Leave a comment

Earthquake risks under nuclear reactors at Tsuruga , Japan

Reactor restarts, but Japan’s energy policy in flux, NISA calls for reviews of fault lines near Fukui nuclear reactors July 04, 2012, THE ASAHI SHIMBUN The Nuclear and Industrial Safety Agency said it will order reassessments of the seismic risk of geological fault lines that run near two nuclear facilities in Fukui Prefecture.

During a hearing session with expert seismologists on July 3, NISA said the potential damage from the fault lines should be studied further at the Mihama nuclear power plant, operated by Kansai Electric Power Co. (KEPCO), and the Monju prototype fast breeder reactor in Tsuruga, run by the Japan Atomic Energy Agency (JAEA).

The Shiraki-Nyu fault, which is recognized as active, runs north-south about 1 kilometer east of the Mihama nuclear plant and 500 meters west of the Monju reactor. In addition, the premises of the Mihama nuclear plant contain nine fault lines, while nine others run under the Monju reactor…. Japan Atomic Power Co., operator of the Tsuruga nuclear power plant in Tsuruga, Fukui Prefecture, is conducting re-investigations after NISA pointed out that sliding along the Urazoko active fault, which cuts through the plant’s premises, could lead to movements of a fault line directly beneath the No. 2 reactor….

July 5, 2012 Posted by | Japan, safety | Leave a comment

Anti nuclear protests grow as Japan restarts 2 nuclear reactors

“We are against the restart,” protestors chanted to the beat of drums as they faced a line of riot police.

On Friday, tens of thousands of people gathered on streets outside the premier’s residence in central Tokyo with organisers estimating the turnout at up to 180,000.

Protesters try to block Japan nuclear switch-on, Radio Australia 1 July 2012, Engineers in Japan have begun refiring an atomic reactor, despite growing public protests in the aftermath of meltdowns at Fukushima.

Local media reported that the process to restart Unit No. 3 at Oi in western Japan began around 9:00 pm (1200 GMT).
It had earlier been reported that control rods that have prevented an atomic reaction would be removed and fission would begin. The reactor was expected to reach criticality early Monday morning.

A noisy demonstration near the power station that had begun earlier in the day was continuing, live streamed footage showed. Continue reading →

July 2, 2012 Posted by | Japan, opposition to nuclear | Leave a comment

Pro nuclear advocates stack Japan’s committee to plan retreat from nukes!

The subcommittee consists of 25 members, of whom only about eight favor abandoning nuclear energy.

Is this not odd for a group that is supposed to be discussing ways to steer Japan from nuclear power generation?

The Prometheus Trap/ Tug of war over future of nuclear energy, The Asahi Shimbun.  KIYOSHI OKONOGI 29 June 12, “…..The Fundamental Issues Subcommittee of the Advisory Committee for Natural Resources and Energy, which advises the minister of economy, trade and industry, was in session on April 11 at the ministry building in Tokyo’s Kasumigaseki district. The task of this subcommittee was to discuss the policy of the administration of Prime Minister Yoshihiko Noda to wean the nation off nuclear power generation. Continue reading →

July 2, 2012 Posted by | Japan, secrets,lies and civil liberties | Leave a comment

Solar Centre opens in western Japan, many more to come

JAPAN OPENS SOLAR ENERGY PARKS 7 News, July 2, 2012 TOKYO (AFP) – Japan opened several solar energy
parks on Sunday as a new law came into force requiring companies to purchase renewable energy at a fixed price in a push for alternatives to nuclear power…. A new solar centre opened in Kyoto in western Japan, while various municipalities also started up installations able to provide energy for hundreds of thousands of households.

Japanese telecommunications Softbank chief Masayoshi Son, opposed to nuclear energy since a powerful earthquake and tsunami last year that crippled reactor cooling systems, said it had plans for 11 solar or windpower centres in Japan.

The push to invest in renewable energy resources is a mark of Japan’s search for alternatives to nuclear power, as 49 reactors out of 50 in the country have been shut down for safety checks and amid growing public protests. The new law that took effect on Sunday requiring power companies to purchase all renewable energy at a fixed tariff is aimed at encouraging firms to pursue sustainable initiatives. The government estimates the power provided by renewable energy this
year in Japan will attain 2,500 megawatts, the equivalent of two medium-sized nuclear reactors.
http://au.news.yahoo.com/world/a/-/world/14100878/japan-opens-solar-energy-parks/

July 2, 2012 Posted by | Japan, renewable | Leave a comment

Japan’s nuclear reprocessing reactor’s astronomic costs

Fast breeder reactor far costlier than regular nuclear power generation http://english.kyodonews.jp/news/2012/06/166571.html TOKYO, June 29, Kyodo If the development of the controversial Monju prototype fast breeder reactor is continued, its costs will swell to over 1.4 trillion yen and its power generation costs will be 10,000 yen per kilowatt hour, roughly 1,000 times greater than a regular reactor, according to data compiled by Kyodo News.

 Construction of the Monju reactor started in Tsuruga, Fukui Prefecture, in 1985 as part of the government’s policy of establishing a nuclear fuel cycle to make use of spent nuclear fuel at conventional atomic plants that run on uranium. Monju uses a uranium and plutonium mix as fuel.

 The facility of the government-affiliated Power Reactor and Nuclear Fuel Development Corp. first reached criticality, a situation where a chain reaction of nuclear fission is sustained, in 1994. http://english.kyodonews.jp/news/2012/06/166571.html

June 30, 2012 Posted by | business and costs, Japan, reprocessing | Leave a comment

100,000 Japanese rally against restart of nuclear power

Huge Tokyo Rally Protests Nuclear Restart By MITSURU OBE And ELEANOR WARNOCK, WSJ, June 29, 2012, TOKYO—Tens of thousands of people protested against the nation’s first nuclear reactor restarts at the Japanese prime minister’s residence Friday, in one of the largest demonstrations since the accident at the Fukushima Daiichi plant last year set off wide opposition to nuclear power.

The massive demonstration was called to protest a government decision to restart Sunday two reactors at the Oi plant in western Japan. It was the 14th demonstration organized by a coalition of anti-nuclear groups outside the premier’s residence since March 29. Organizers estimated the number of participants to be more than 100,000. The National Police Agency, which also releases estimates, was unavailable for comment. The looming restart of the two Oi reactors, a decision
made by Prime Minister Yoshihiko Noda’s administration amid power-shortage concerns, seems to have galvanized support for Friday’s demonstration.

The sidewalks in front of the prime minister’s office and near the Parliament were overflowing with protesters. Some participants carried handwritten signs, while others held aloft elaborate placards reading ”No Restarts.” For more than two hours the crowd kept up a rhythmic cheer of “Against the restarts, against the restarts, against the restarts.”….
http://online.wsj.com/article/SB10001424052702303649504577496802810864704.html?mod=googlenews_wsj

June 30, 2012 Posted by | Japan, opposition to nuclear | Leave a comment

Group for Zero Nuclear Power – a new force in Japan’s Parliament

(Group for Zero Nuclear Power), made up of nine politicians from seven political parties

The lawmakers’ group plans to campaign for a phased scrapping of nuclear reactors, similar to the policy adopted by Germany.

Experts warn against restarting nuclear reactors in Japan, Times of India, Subodh Varma, TNN | Jun 28, 2012, NEW DELHI: Japan is in ferment as the date for restarting two of its nuclear reactors draws close after over an year’s shutdown. Hundreds have participated in protests at several places. Local councils are confused and divided. Two seismic experts publicly warned that the government is under-estimating the threat to these reactors which are located very near a seismic fault.

And a group of lawmakers cutting across political parties released a danger ranking of 50 nuclear reactors in Japan calling for their phased decommissioning. …. Continue reading →

June 29, 2012 Posted by | Japan, politics | Leave a comment

To save TEPCO Corporation, Japan’s govt plans a big restart of nuclear energy

Tepco’s Plans Restart of World’s Biggest Nuclear Plant, Bloomberg News By Tsuyoshi Inajima and Yuji Okada June 28, 2012   Tokyo Electric Power Co. (9501), owner of the crippled Fukushima reactors, is committed to restarting another nuclear plant next year that is the world’s largest and itself was damaged in a 2007 earthquake.

Bringing the Kashiwazaki Kariwa power station online, even though it sets up the state-controlled utility for further conflicts with a nuclear-weary public, is part of “Plan A,” President Naomi Hirose, 59, said in an interview. The plan refers to a 10-year business reconstruction that handed control of the power company known as Tepco to Japan’s government. “We have no choice right now but to do our bestto carry out Plan A,” Hirose said on June 18. “We don’t have a Plan B.”

Tepco’s decision runs counter to polls showing the majority of Japanese want less reliance on atomic power after meltdowns at its Fukushima Dai-Ichi reactors last year. The radiation release and cost to the public of as much as $138 billion sparked anti-nuclear sentiment across the world. In Japan, all 50 reactors, including the seven at Kashiwazaki Kariwa, have been required to pass so-called stress tests introduced to improve safety after the Fukushima
disaster. Only two near the western city of Osaka have won permission
to resume operations, leaving 48 offline.

“Tepco’s plan is only wishful thinking” because no more reactors are likely to be approved this year, said Tomoko Murakami, a Tokyo-based nuclear analyst at the Institute of Energy Economics, Japan. “Without the restart, there is not much hope to revive the company.”…… http://www.businessweek.com/news/2012-06-27/tepco-s-new-chief-sees-no-plan-b-to-revive-profitability

June 29, 2012 Posted by | Japan, politics | Leave a comment

Fukushima nuclear reactor No.1 cleanup stalled by lethal levels of radiation

Fukushima radiation at record high RECORD amounts of radiation have been detected at the Fukushima nuclear reactor, further hampering clean-up operations. http://www.heraldsun.com.au/ipad/fukushima-radiation-at-record-high/story-fn6s850w-1226410635366  28 June 12  TEPCO, the operator of Japan’s crippled nuclear plant, took samples from the basement of reactor number 1 after lowering a camera and surveying instruments through a drain hole in the basement ceiling.

Radiation levels above radioactive water in the basement reached up to 10,300 millisievert an hour, a dose that would kill humans within a short time after making them sick within minutes. The annual allowed dose for workers at the stricken site would be reached in only 20 seconds.

“Workers cannot enter the site and we must use robots for the demolition,” said TEPCO.

The Fukushima operator said that radiation levels were 10 times higher than those recorded at the plant’s two other crippled reactors, number two and three. This was due to the poor state of the nuclear fuel in the reactor compared to that in the two others.

The meltdown at the core of three of Fukushima’s six reactors occurred after the March 11, 2011 earthquake and ensuing massive tsunami shut off the power supply and cooling system.

Demolition of the three reactors as well as the plant’s number 4 unit is expected to take 40 years and will need the use of new technologies.

June 28, 2012 Posted by | Fukushima 2012 | Leave a comment

Golden farewell for Fukushima nuclear plant directors and auditors as they leave for other lucrative jobs

VIDEO :  . http://www.radioaustralia.net.au/international/2012-06-27/tepco-directors-quit-with-golden-parachute/968572    TEPCO directors quit with ‘golden parachute’, Radio Australia  28 June 2012, Directors and auditors at the Japanese operator of the Fukushima nuclear plant have used the company’s annual general meeting to resign. In theory, the TEPCO directors and auditors are doing so to take responsibility for last year’s disaster, but the ABC can confirm nearly half of those who have resigned will take up lucrative posts with other TEPCO group companies.

Some of the executives are also facing the biggest lawsuit in Japanese history – a $67 billion compensation claim from shareholders for what they describe as unforgivable negligence. Outside the company’s meeting on Wednesday, activists – most of them middle-aged women – handed out anti-nuclear leaflets to shareholders making their way in.

Among them was Yui Kimura, who bought TEPCO shares so she could attend and vote at meetings. She is one of 42 shareholders suing 27 company directors for failing to heed repeated warnings about the threat of a giant tsunami.
She is fighting for TEPCO to pay compensation for those affected by the Fukushima nuclear meltdowns.
About 100,000 Fukushima residents still cannot return home……

June 28, 2012 Posted by | civil liberties, Fukushima 2012, Japan | Leave a comment

Japanese seafood products banned in South Korea, due to radiation risks

South Korea Bans Imports of 35 Japanese Seafood Products VOA, June 27th, 2012 South Korea has placed a temporary import ban on 35 Japanese seafood products because of fears of lingering radiation contamination from last year’s devastating nuclear disaster.

Seoul’s Ministry of Food, Agriculture, Forestry, and Fisheries says the ban is a temporary measure meant to protect South Korean citizens from products originating from the waters near the Fukushima nuclear power plant…….. The items banned Wednesday by South Korea include several types of flatfish, clams and sea urchins, products that are already prohibited from sale in Japan. With the latest move, Seoul now prohibits a total of 64 Japanese seafood items from entering South Korea. http://blogs.voanews.com/breaking-news/2012/06/27/south-korea-bans-imports-of-35-japanese-seafood-products/

June 28, 2012 Posted by | Japan, oceans, South Korea | 1 Comment