nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Proposed storage of spent nuclear fuel sparks resistance in Aomori Pref. City

Recyclable Fuel Storage Co interim storage facility mutsu, Aomori Prefecture.jpg
The Recyclable-Fuel Storage Co. interim storage facility is seen fenced off in Mutsu, Aomori Prefecture, on March 6, 2018
March 22, 2018
The selection of a site to house an interim storage facility for spent fuel from nuclear power plants operated by Kansai Electric Power Co. (KEPCO) has run into rough waters. In January, the Aomori Prefecture city of Mutsu surfaced as a candidate, but resistance quickly emerged from locals.
 
With KEPCO’s nuclear power plants being concentrated in Fukui Prefecture, the prefectural government has set a basic premise of storing spent nuclear fuel outside the prefecture. The utility aims to announce a candidate site this year, but there remains fierce opposition to accepting nuclear fuel from other prefectures, and because of this, its prospects of settling on a site are unclear.
 
After a 20-minute drive along a national route from central Mutsu during a visit by the Mainichi Shimbun in early March, an imposing fence could be seen along a snowy field. Beyond the fence was a square building — an interim storage facility that is being built by Recyclable-Fuel Storage Co. (RFS), a company founded by Tokyo Electric Power Company Holdings, Inc. and Japan Atomic Power Co. The facility’s storage capacity is around 3,000 tons of spent fuel. There are plans to build a second building in the future.
 
In January, this facility gained nationwide attention. As the Nuclear Regulation Authority (NRA) came to the final stage of its screening of the facility, news organizations reported that KEPCO was considering transporting spent nuclear fuel from its plants to the facility.
 
Mutsu Mayor Soichiro Miyashita immediately held a news conference, saying he had heard no such thing from the central government, KEPCO, or RFS. “The feelings of the region are being completely ignored,” he said.
 
In an interview with the Mainichi Shimbun on March 6, Miyashita suggested it was unlikely KEPCO would bring its nuclear fuel into the facility as things stand. “Operations at the site haven’t started yet. Without the facility having cleared the NRA’s screening, it’s unthinkable that they could change the status quo,” he said.
 
The Shimokita Peninsula in northern Aomori Prefecture, where the city of Mutsu is located, not only houses the interim storage building, but has a collection of other nuclear facilities including the Higashidori Nuclear Power Plant in the Aomori Prefecture village of Higashidori, the Oma Nuclear Power Plant in the town of Oma and the reprocessing plant for spent nuclear fuel in the village of Rokkasho. But since the outbreak of the Fukushima nuclear disaster in March 2011, construction of nuclear facilities has been suspended or delayed.
 
“We had expected our nonresident population to increase in line with nuclear power plant construction and inspections. But taxi companies are going out of business, and the economic chill is severe,” Miyashita said.
 
Alongside concerns about the storage of nuclear fuel, there are also deeply rooted aspirations regarding the operation of nuclear power plants in the region. Katsura Sonoda, head of the Mutsu Chamber of Commerce and Industry, commented, “In local economic circles, there is little resistance to reactivating nuclear power plants, and we want the interim storage facility to go into operation quickly. Fixed property taxes and subsidies will also increase.
 
A figure in the energy industry commented, “The mayor is up for election for a second term in June. It’s not the case that he lacks understanding of nuclear power-related projects; I guess it’s just that he had to be sensitive toward antinuclear public sentiment in the wake of the nuclear disaster (in Fukushima).”
 
In late January, KEPCO announced that it would set up an office in Aomori in June to handle payment-related issues, employing about 70 people. A public relations representative for the company maintained that this had nothing to do with the interim storage facility, but this has not swept away the view that the company is entering Aomori Prefecture to warm the region to the idea of hosting the facility.
 

March 22, 2018 Posted by | Japan | , , , , | Leave a comment

Court rejects call to suspend nuclear reactors in southwestern Japan

Genkai NPP.jpg
The No. 3 (right) and 4 reactors at Kyushu Electric Power Co.’s Genkai Nuclear Power Plant are seen in Genkai, Saga Prefecture, on March 13, 2018.
 
SAGA, Japan (Kyodo) — A district court in southwestern Japan on Tuesday rejected local residents’ request to suspend the planned restart of nuclear reactors in Saga Prefecture over safety concerns.
 
Some 70 people sought an injunction to halt the restart of the Nos. 3 and 4 reactors at the Genkai nuclear power plant of Kyushu Electric Power Co., scheduled for Friday and May, respectively, questioning safety standards and citing the risks of a volcanic eruption in the region.
 
But the Saga District Court’s Presiding Judge Takeshi Tachikawa said the utility’s safety measures are “reasonable” and that the court found “no specific risk of (the reactors) causing serious damage.”
 
The decision was in sharp contrast with a Hiroshima High Court ruling in December to halt the planned restart of a reactor of Shikoku Electric Power Co.’s Ikata plant on the grounds of a possible eruption of Mt. Aso.
 
As the 1,592-meter volcano is located some 130 kilometers from the Ikata plant, almost the same distance as from the Genkai plant, attention was on how the Saga court would evaluate the risk.
 
During the trial, the plaintiffs from Saga, Fukuoka, Nagasaki, Kumamoto and Yamaguchi prefectures expressed doubt about the credibility of the new safety standards introduced after the 2011 Fukushima nuclear disaster, saying they were compiled when the Fukushima crisis had yet to be resolved.
 
The plaintiffs also claimed that there is no measure to respond to a catastrophic volcanic eruption which cannot be forecasted.
Kyushu Electric argued it has taken safety steps and that there is no imminent danger of a serious accident.
 
In June last year, Judge Tachikawa dismissed a similar request from a different group of local residents for an injunction to stop the restart of the two Genkai plant reactors.
 
Separate from the lawsuits seeking injunctions, some 10,000 people in Japan and abroad have filed a suit demanding suspension of the Genkai reactors.
 

March 21, 2018 Posted by | Japan | , | Leave a comment

Hakodate court rejects plea for injunction to halt construction of Oma MOX plant in Aomori

Oma nuclear plant.jpg
The Oma nuclear plant (right) is shown under construction Monday in the town of Oma, Aomori Prefecture
 
HAKODATE, HOKKAIDO – A court has dismissed a request from residents of Hakodate, Hokkaido, for an injunction to halt the construction of Electric Power Development Co.’s nuclear power plant in the town of Oma, across the Tsugaru Strait in nearby Aomori Prefecture.
 
Handing down the ruling Monday at the Hakodate District Court, the presiding judge, Chikako Asaoka, said it is “difficult to assess the particular risk of a severe accident right now” because it is uncertain when the Oma plant will enter operation.
 
The ruling also noted that the plant being built by Electric Power Development, also known as J-Power, is undergoing Nuclear Regulation Authority screenings under new standards set after the March 2011 triple core meltdown at Tokyo Electric Power Company Holdings Inc.’s Fukushima No. 1 plant.
 
“It’s not reasonable for a court of law to conduct safety examinations without waiting for the NRA screenings,” the judge said.
 
The plaintiffs plan to appeal the ruling, which was the first on a nuclear plant under construction since the Fukushima disaster.
“It’s a terrible ruling that makes light of us,” said Toshiko Takeda, 69, the leader of the plaintiff group. “How did the court reflect on the Fukushima accident? It’s really mortifying.”
 
Construction on the Oma plant started in May 2008. It is about 23 km south of Hakodate, on the other side of the Tsugaru Strait.
In July 2010, a group of citizens including Hakodate residents sued the state and J-Power over the issue. The number of plaintiffs has since risen to 1,164.
 
The main issue in the lawsuit was the safety of the Oma plant, which will only burn mixed-oxide (MOX) fuel — a blend of uranium and weapons-grade plutonium extracted from spent fuel. The Oma plant will be the world’s first fully MOX-powered plant.
 
The plaintiffs demanded that the project be canceled, arguing that a MOX plant will pose a higher accident risk. They also claimed that the new regulatory standards are inadequate and that there are geographic faults around the plant site.
J-Power insisted that the use of MOX fuel will not necessarily make it difficult to control the reactors.
 
The Hakodate court admitted that an injunction against the Oma project could be issued if the regulatory standards contained irrational points. But it concluded that the standards could not be deemed to have such points.
 
Speaking to reporters in Mutsu, Aomori Prefecture, Oma Mayor Mitsuharu Kanazawa welcomed the ruling.
“We’ve awaited this result, as we hope to proceed steadily” with the nuclear plant project, Kanazawa said.
 
Separately from the citizens’ lawsuit, the Hakodate Municipal Government took similar action at the Tokyo District Court in 2014, unconvinced by the central government’s explanations about the Oma project.
 
A municipal official working on the Tokyo lawsuit said that an accident at the Oma plant could devastate the local fishing and tourism industries.
 
Hakodate Mayor Toshiki Kudo issued a statement saying that the ruling by the Hakodate court is very regrettable. “We will check details of the ruling to draw lessons for the city’s case.”
 

March 21, 2018 Posted by | Japan | , | Leave a comment

  The “forbidden life” of those caring for abandoned animals in Fukushima

Hero rescues pets from Fukushima nuclear wasteland

The 3/11 kitten that wasn’t   The “forbidden life” of those caring for abandoned animals in Fukushima, Beyond Nuclear , By Linda Pentz Gunter, 20 March 18   “………. countless animals were indeed abandoned in Japan due to the natural disasters and the forced exile of those living too close to the stricken nuclear plant. Some international rescue groups did go in to try to help, but early on found conditions and access restrictions challenging if not prohibitive.

However, there were also individuals and groups in Japan who were not willing to sit back and watch animals starve. In addition to the rescue operations, a spay-neuter organization began work to prevent the inevitable proliferation of pets who, if they had survived at all, had now become strays. Shelters were eventually built with funds donated by supporters.

But there were some, chronicled in several remarkable films, who either never left, or who quickly returned to Fukushima Prefecture, with one sole purpose in mind: to look after the animals. Their charges soon multiplied and for some, it has become a full-time vocation.

In a 2013 ITN short news segment, we are introduced to 58-year old Keigo Sakamoto, who had already established an animal sanctuary in Nahara, just over 12 miles from the Fukushima plant. He was one who refused the order to evacuate, then found himself completely trapped within the zone, cut off from supplies. He survives on the generosity of individuals and stores outside the zone where he regularly collects discarded food and other supplies essential to keeping his animals — and himself — alive.

Then there are farmers who returned to save their livestock. One such, 53-year old Naoto Matsumura, is featured in the 18-minute Vice documentary, Alone in the Zone. He lives in what was then the ghost town of Tomioka — whose station reopening story we featured last week. But Matsumura could not accept the idea that dogs, cows, goats, ducks and even ostriches should be cast off without a care.

At first he evacuated with his family, fearing all the reactors were going to blow. But when his family faced rejection by relatives who said they were “contaminated”, and the hassle of evacuation shelters became unendurable, he returned home alone. And stayed. “I couldn’t leave the animals behind,” he said. “I am opposed to killing off the animals in the zone.”

Feeding them, and refusing to sign the “death warrant” requirement from the government, will, he hopes, spare them from slaughter. “So many of their fellow cattle died in pain,” he said, recalling the tragedy of cows left in barnes to starve. “To me, animals and people are equal.” ……https://beyondnuclearinternational.org/2018/03/16/the-3-11-kitten-that-wasnt/

 

March 21, 2018 Posted by | environment, Fukushima continuing, Religion and ethics | Leave a comment

$1 billion case against Tokyo Electric Power Company Holdings Inc by Americans affected by Fukushima nuclar dizaster

https://mainichi.jp/english/articles/20180320/p2g/00m/0dm/023000c (Mainichi Japan)  TOKYO (Kyodo) — Some 200 U.S. residents filed a suit against Tokyo Electric Power Company Holdings Inc. and a U.S. firm seeking at least $1 billion to cover medical expenses related to radiation exposure suffered during the 2011 Fukushima nuclear disaster, the utility said Monday.

 The lawsuit was filed last Wednesday with U.S. federal courts in the Southern District of California and the District of Columbia by participants in the U.S. forces’ Operation Tomodachi relief effort carried out in the wake of the March 11, 2011, earthquake and tsunami that crippled TEPCO’s Fukushima Daiichi nuclear plant.

Many of the plaintiffs are suing TEPCO and the U.S. company, whose name was withheld by TEPCO, for the second time after a similar suit was rejected by the federal court in California in January.

They are seeking the establishment of a compensation fund of at least $1 billion to cover medical and other costs, the utility said.

The plaintiffs claim that the nuclear accident occurred due to improper design and management of the plant by TEPCO. They are also seeking compensation for physical and psychological damage suffered as a result of the disaster, said the utility.

In Operation Tomodachi, which began two days after the natural disasters, the aircraft carrier Ronald Reagan and other U.S. military resources and personnel were deployed to deliver supplies and undertake relief efforts at the same time as three reactors at the Fukushima Daiichi complex suffered fuel meltdowns.

March 21, 2018 Posted by | Japan, Legal, USA | Leave a comment

Japanese Court sides with power company over Oma nuclear plant

Court sides with power company over Oma nuclear plant http://www.asahi.com/ajw/articles/AJ201803190056.html, By KAZUKI NUNOTA/ Staff Writer, March 19, 2018   HAKODATE, Hokkaido–A court in northern Japan on March 19 dismissed a lawsuit to halt construction of a nuclear power plant in Aomori Prefecture on grounds there was no realistic possibility of a serious accident occurring.

Electric Power Development Co. (J-Power) is overseeing construction of the Oma nuclear plant in Oma, across the sea from Hakodate.

The facility is undergoing screening by the Nuclear Regulation Authority to ensure it meets new safety standards imposed after the 2011 Fukushima disaster.

Presiding Judge Chikako Asaoka at the Hakodate District Court said in her ruling, “At the moment, it is difficult to readily recognize the tangible danger of a grave accident likely to occur at the plant.”

The lawsuit focused on whether an active seismic fault existed in the seabed near the construction site, the dangers posed by the possibility of volcanic eruptions in the area and concerns about using only mixed-oxide (MOX) fuel, consisting of plutonium and uranium, as nuclear fuel.

The suit was filed in July 2010 by a group of 1,000 or so plaintiffs.

March 21, 2018 Posted by | Japan, legal | Leave a comment

Japan-led Turkish nuclear plant project mired in cost overruns. 

Nikkei Asian Review 18th March 2018   Another
setback looms for Tokyo’s infrastructure export drive. A Japan-led nuclear
power plant project in Turkey looks to cost more than twice as much as
initially projected, highlighting challenges for Tokyo’s push to export
Japanese infrastructure.

The Japanese and Turkish governments agreed on the
public-private project in 2013. The estimated total cost, pegged at around
2 trillion yen ($18.8 billion at current rates) at the time, has since
ballooned to more than 5 trillion yen, according to sources close to the
matter, due largely to the need to meet tougher safety standards
implemented after the March 2011 meltdowns at Tokyo Electric Power Co.
Holdings’ Fukushima Daiichi plant.

The plan is to build four reactors with
a total output of 4,500 megawatts in the Black Sea coastal city of Sinop,
using Atmea1 reactors Japan’s Mitsubishi Heavy Industries is developing
with France’s Areva.

Though the goal is to put the first reactor into
service in 2023, in time for Turkey’s centennial, the cost problem could
cause that date to slip.

Japan views nuclear power as an integral part of
efforts to export infrastructure around the world. As Mitsubishi Heavy and
the others hash out the Turkish project, a group led by Hitachi is putting
the finishing touches on plans to build two nuclear reactors in the U.K.,
on the Welsh coast.

Yet the Fukushima accident still casts long shadows
over the nuclear industry, and hurdles are growing higher. Vietnam has
cancelled orders for Japanese nuclear facilities amid financial concerns
and local opposition. Partly because of the rising cost of safety measures,
the financial risks of building nuclear plants abroad have grown too large
for companies alone to bear.

So Japan’s government has stepped in with
public financing and other aid, eager to support infrastructure exports,
which it considers a key economic growth strategy. Pursuing projects abroad
is in effect the only way for such companies as Mitsubishi Heavy and
Hitachi to maintain and profit from their nuclear technologies.

All nuclear power plants in Japan halted operations in the years after the Fukushima
disaster, and only a few have been approved to restart. Expanding plants or
building new ones is likewise difficult.
https://asia.nikkei.com/Politics-Economy/Economy/Japan-led-Turkish-nuclear-plant-project-mired-in-cost-overruns

March 21, 2018 Posted by | business and costs, Japan, politics | Leave a comment

Northern Japan court rejects lawsuit against construction of Ohma nuclear plant

higashidori, aomori NPP
Japan court rejects lawsuit against construction of nuclear plant
A court in northern Japan on Monday rejected a lawsuit to halt construction of a nuclear plant, said the company building the facility, Electric Power Development Co (J-Power).
 
The ruling by the Hakodate District Court in Hokkaido prefecture on the Ohma plant will be welcomed by many utilities as they push for a return to nuclear power following the 2011 Fukushima disaster, despite strong opposition from chunks of the public.
More than 1,100 residents in Hokkaido, among others, had filed the lawsuit in 2010 to prevent Ohma from starting. The construction of the 1,383-megawatt plant, which will use mixed oxide fuel, a blend of uranium and plutonium recycled from spent nuclear fuel, started in 2008, but work was suspended after Fukushima in 2011.
 
Building resumed in 2012, but has been delayed as the company has to meet new safety requirements imposed after the 2011 disaster, a company spokesman said. The station is about 38-percent complete, he said.
 
J-Power in 2016 pushed back the planned start of operation by two years to 2024/25.
“We are doing all we can for the start of operations in the 2024/25 business year,” the spokesman added.
 
The ruling marks the latest judgement on atomic power in the country, with critics of nuclear energy having more success in some other cases.
 
A high court in western Japan sided with residents last December to prevent the restart of a nuclear plant idled for scheduled maintenance, although lower court decisions have usually been turned down on appeal.
 
 
Court rules against bid to halt Ohma construction
A Japanese court today rejected a lawsuit seeking to stop construction and subsequent operation of Japan Electric Power Development Corp’s (J-Power’s) Ohma nuclear power plant, being built in Aomori prefecture.
 
More than 1100 residents of Hakodate city filed a suit and claims for damages with the Hakodate District Court against J-Power and the government in July 2010. A further eight complaints have since been filed with the court.
 
The lawsuit focused on whether there is an active seismic fault in the seabed near the Ohma plant site and the risk of volcanic eruptions in the area. The plaintiffs also expressed concerns about the plant using purely mixed-oxide (MOX) fuel. Ohma 1 would be the first Japanese reactor built to run solely on MOX fuel incorporating recycled plutonium.
 
“Until now, we have asked the court to dismiss the claims, and we have carefully insisted on and verified that the safety of the Ohma nuclear power plant is secure,” J-Power said.
 
The company announced today that the Hakodate District Court had “recognised” its argument and ruled in its favour. The ruling dismisses both the injunction on the plant’s construction and the claims for damages, it noted.
 
Presiding Judge Chikako Asaoka was quoted by the Asahi Shimbun as saying: “At the moment, it is difficult to readily recognise the tangible danger of a grave accident likely to occur at the plant.”
 
“We will continue to respond appropriately to the conformity assessment by the Nuclear Regulation Authority (NRA) to the new regulatory standards and we will work throughout the entire company to create a safe power plant,” J-Power said. “In addition, we will strive to provide information about the plan of the Ohma nuclear power plant to the people concerned.”
The start of construction of the Ohma plant was originally due in August 2007, with commercial operation planned for March 2012. However, the imposition of more stringent seismic regulations put back the start of construction to May 2008 and commercial operation to November 2014.
 
Work to build the first unit at Ohma – a 1383 MWe Advanced Boiling Water Reactor – was about 40% complete in March 2011 when a tsunami caused the accident at the Fukushima Daiichi plant. Construction of Ohma 1 was suspended following the accident, but was resumed in October 2012. At that time, J-Power said it would strive to establish a safe power plant by, among other things, ensuring reinforced safety measures are implemented that take into account the lessons learned from the Fukushima accident.
 
In December 2014, J-Power submitted an application to the NRA to make changes to Ohma 1’s reactor installation to strengthen the unit’s protection. These measures – including tsunami countermeasures, ensuring power supplies, ensuring heat removal functions, and severe accident responses – were originally expected to be completed by the end of 2020.
 
However, in September 2015, the company announced a one-year delay in the start of safety equipment construction, pushing back the start of operation to around 2021. This delay was attributed to the prolonged screening process by the NRA after the company was requested to submit additional information about its plans.
 
A year later, J-Power said it expects a further delay of around two years in the completion of the NRA’s review and approval process for Ohma 1. It now expects construction of the safety upgrades to begin this year and to be completed in the second half of fiscal year 2023.
“We are doing all we can for the start of operations in the 2024/25 business year,” a J-Power spokesman told Reuters.
 

March 20, 2018 Posted by | Japan | , | Leave a comment

Informational power to the people: Safecast volunteers monitor Fukushima radiation

 

NGO Safecast co-founder Pieter Franken explains to schoolgirls how to assemble a Geiger counter kit in their classroom in Koriyama City, Fukushima Prefecture. 

Tracking Fukushima’s radiation , https://www.shine.cn/feature/lifestyle/1803181780/  Source: AFP   Editor: Fu Rong     Beneath the elegant curves of the roof on the Seirinji Buddhist temple in Japan’s Fukushima region hangs an unlikely adornment: a Geiger counter collecting real-time radiation readings.

The machine is sending data to Safecast, an NGO born after the March 2011 Fukushima nuclear disaster that says it has now built the world’s largest radiation dataset, thanks to the efforts of citizen scientists like Seirinji’s priest Sadamaru Okano.

Like many, Okano lost faith in the government after the nuclear meltdown seven years ago.

“The government didn’t tell us the truth, they didn’t tell us the true measures,” he said.

Okano was in a better position than most to doubt the government line, having developed an amateur interest in nuclear technology 20 years earlier after the Chernobyl disaster. To the bemusement of friends and family, he started measuring local radiation levels in 2007.

“The readings were so high, 50 times higher than natural radiation,” he said of the post-disaster data. “I was amazed. The news told us there was nothing, the administration was telling us there was nothing to worry about.”

That dearth of trustworthy information was the genesis of Safecast, said co-founder Pieter Franken, who was in Tokyo with his family when disaster hit. Franken and friends had the idea of gathering data by attaching Geiger counters to cars and driving around.

“Like how Google does Street View, we could do something for radiation in the same way,” he said. “The only problem was that the system to do that didn’t exist and the only way to solve that problem was to go and build it ourselves. So that’s what we did.”

Within a week, the group had a prototype and got readings that suggested the 20-kilometer exclusion zone declared around the Fukushima plant had no basis in the data, Franken said.

“Evacuees were sent from areas with lower radiation to areas with higher radiation” in some cases, he said.

The zone was eventually redrawn, but for many local residents it was too late to restore trust in the government.

Okano evacuated his mother, wife and son while he stayed with his flock.

A year later, based on his own readings and after decontamination efforts, he brought them back. He learned about Safecast’s efforts and in 2013 installed one of their static counters on his temple.

“I told them: ‘We are measuring the radiation on a daily basis… so if you access the (Safecast) website you can choose (if you think) it’s safe or not’.”

Norio Watanabe has been a Safecast volunteer since 2011. In the days after the disaster evacuees flocked to Koriyama, which was outside the evacuation zone. He assumed his town was safe.

He sent his children away, but stayed behind to look after his mother, a decision he believes may have contributed to his 2015 diagnosis of thyroid cancer.

“As a scientist, I think the chance that it was caused by the Fukushima accident might be 50-50, but in my heart, I think it was likely the cause,” he said.

His thyroid was removed and is now healthy, but Watanabe worries about his students, who he fears “will carry risk with them for the rest of their lives.”

“If there are no people like me who continue to monitor the levels, it will be forgotten.”

Safecast now has around 3,000 devices worldwide and data from 90 countries. Its counters come as a kit that volunteers can buy through third parties and assemble at home.

March 19, 2018 Posted by | Fukushima continuing, PERSONAL STORIES, politics, radiation | Leave a comment

Tepco and other utilities eye joint nuclear plant project in Aomori Prefecture

higashidori, aomori NPP.jpg
Tokyo Electric Power Company Holdings Inc. and other major utilities will start talks this spring on jointly building and operating a nuclear power plant in northeastern Japan, sources close to the matter said Friday.
The plan involves Tepco’s Higashidori nuclear power plant in Aomori Prefecture, the construction of which was suspended following meltdowns at the firm’s Fukushima No. 1 power plant in March 2011. Tohoku Electric Power Co., Chubu Electric Power Co., and Japan Atomic Power Co. are expected to participate in the project, according to the sources.
Kansai Electric Power Co. is also considering joining a group to discuss the role of each utility and how to shoulder the huge costs related to the Higashidori plant, they said.
The government, which holds the majority of Tepco’s voting rights through a state-backed bailout fund, is expected to support the move.
Tepco, which began constructing the Higashidori plant in January 2011, hopes to compile a joint venture plan around fiscal 2020.
Struggling under the burden of huge compensation payments and plant decommissioning costs from the Fukushima nuclear crisis, Tepco is aiming to rebuild itself through realigning its nuclear business. The utility has been asking other power companies since late last year to join in with construction of the Higashidori plant.
Other utilities may benefit from the joint business as they can share know-how and resources through the initiative at a time when profitability is deteriorating, due to suspensions of nuclear power plants for tighter safety screening introduced after the Fukushima disaster.
Still, many utilities remain wary that teaming up with the crisis-hit Tepco could result in their share of plant decommissioning costs increasing in the future.

March 17, 2018 Posted by | Japan | , | Leave a comment

Sanitising the Fukushima nuclear waste situation: Japanese newspaper succumbs to pressure

The Great Train Photo Robbery https://beyondnuclearinternational.org/2018/03/13/the-great-train-photo-robbery/ 

March 17, 2018 Posted by | Fukushima continuing, Japan, secrets,lies and civil liberties, spinbuster | Leave a comment

In 2019, Japanese govt hopes to extract a small sample of melted nuclear fuel from Fukushima reactor 2

First samples of Fukushima plant nuclear fuel debris to be collected in FY 2019 https://mainichi.jp/english/articles/20180316/p2a/00m/0na/018000c    (Mainichi Japan)  The government and Tokyo Electric Power Co. (TEPCO) are set to extract a small sample of melted nuclear fuel from the bottom of the No. 2 reactor’s containment vessel at the disaster-stricken Fukushima No. 1 nuclear plant as early as fiscal 2019.

March 17, 2018 Posted by | Fukushima continuing, wastes | Leave a comment

‘It feels like we’re in jail’: Japan spent $12 billion on seawalls after the devastating 2011 tsunami — and now locals are feeling like prisoners

Mar 12, 2018
Japan’s Fukushima disaster – a devastating string of events that included a tsunami with 42-foot high waves – left 18,000 dead in 2011.
In response, many towns along Japan’s coast have since built massive seawalls to help protect against future tsunamis.
Many locals aren’t happy with the walls, saying they feel like they’re “in jail.”
 
This month marks the seven-year anniversary of Japan’s Tōhoku earthquake and tsunami, which caused the Fukushima Daiichi nuclear disaster.
 
The catastrophic Fukushima disaster included a magnitude 9.0 earthquake, a resulting tsunami, and a power-plant accident, which left close to 18,000 people dead in total.
 
The tsunami also took 5 million tons of debris with it. While 70% of the debris sank, 1.5 million tons of it was left floating in the Pacific Ocean.
 
Since the devastation, some towns have prohibited building in flatter areas near the coast, while others have raised their land before building new structures.
 
Others are building seawalls. About 245 miles of seawall structure has been built along the coast to protect from future tsunamis. It has cost Japan about $12 billion to build these 41-foot concrete seawalls, according to Reuters, which block the view of the beaches and sea from residents – and some people aren’t happy with it.
 
“It feels like we’re in jail, even though we haven’t done anything bad,” an oyster fisherman, Atsushi Fujita, told Reuters. Others are worried about the walls discouraging tourism.
 
Ahead, a look at the resulting seawalls along Japan’s coast.
The new seawalls are 41 feet high and made of concrete.
2.jpg
These newer walls replaced the old 13-foot breakwaters, which were destroyed during the Fukushima disaster on March 11, 2011.
3
“It feels like we’re in jail, even though we haven’t done anything bad,” Atsushi Fujita, a 52-year-old oyster fisherman, told Reuters.
4
Around 245 miles of seawalls have been built at a cost of about $12.74 billion.
5
“The seawalls will halt tsunamis and prevent them from inundating the land,” Hiroyasu Kawai, a researcher at the Port and Airport Research Institute in Yokosuka, told Reuters.
6.jpg
“Even if the tsunami is bigger than the wall, the wall will delay flooding and guarantee more time for evacuation,” said Kawai.
7
Some locals are worried the tourism industry will be negatively effected by the seawalls.
8
“About 50 years ago, we came up here with the kids and enjoyed drives along the beautiful ocean and bays. Now, there’s not even a trace of that,” Reiko Iijima, a tourist from central Japan, told Reuters.
9
Others find it to be more than just an eyesore. “Everyone here has lived with the sea, through generations,” Sotaro Usui, head of a tuna supply company, told Reuters. “The wall keeps us apart — and that’s unbearable.”
10.jpg
Part of the seawalls in the city of Kesennuma have window cut-outs.
11
“They’re a parody,” Yuichiro Ito said of the windows. Ito lost his home and younger brother in the tsunami. “It’s just to keep us happy with something we never wanted in the first place.”
12
A man looks through a window of a seawall at a port in Kesennuma, Miyagi Prefecture, Japan.
 
Initially, many welcomed the building of the seawalls, but have become more critical of them over time.
13
Some locals told Reuters that they were not consulted enough in the planning stages, and money spent on rebuilding elsewhere, such as housing, has fallen behind.
14.jpg
 
Fishermen are also worried. Some told Reuters that the sea walls could block natural water flows from the land and impact future production.
15
Here, the “Miracle Pine,” a tree which is said to symbolize hope and recovery after it survived the 2011 tsunami, stands next to a damaged building in front of the newly built seawall in Rikuzentakata, Iwate Prefecture, Japan.
16
Still, some locals are glad to have a wall. “I can’t say things like ‘the wall should be lower’ or ‘we don’t need it,'” Katsuhiro Hatakeyama, who has rebuilt his bed and breakfast business in the same location as before, told Reuters. “It’s thanks to the wall that I could rebuild, and now have a job.”
17
 

March 15, 2018 Posted by | Japan | , | Leave a comment

Olympic Games Spin – Based on Olympic Sized Lies – theme for March 2018

Fukushima today is the focus of the nuclear lobby’s most egregious lies. It’s hard to know where to start in examining them.

 

Let’s start with ionising radiation. This year’s March 11 report, by Shin-ichi Hayama, on the macaque monkeys of Fukushima reveals that they have radioactive cesium in their muscles, and significantly low white and red blood cell counts.  They have reduced growth rate and smaller head sizes.  These “snow monkeys” are close relatives to humans. Hayama’s 10 year study of the macaque provides a unique examination of the effects of  chronic low level radiation  affecting generations of monkeys.

New nuclear power for Japan, and nuclear technology as a profitable export?   A visitor from another planet might well marvel at these fantasies – noting  Fukushima’s  radioactive shattered reactors, and ever growing masses of radioactive water – with Japan’s vulnerability to earthquakes.

The social costs continue – the rise in childhood and adolescent thyroid cancer, the worried evacuees, the stigma to Fukushim survivors.   The financial costs of it all are unimaginable – and will be exacerbated by many legal cases won against the nuclear industry.

So – how does the global nuclear industry, backed by banks and governments respond?

Why – by deciding to hold the 2020 Olympic Games in Tokyo, and pretending that everything is safe, clean green under control in North Eastern Japan!

LET THE OLYMPIC  SPIN BEGIN –   the survival of the nuclear industry depends on it!!

 

March 14, 2018 Posted by | Fukushima continuing, secrets,lies and civil liberties | 1 Comment

Harmful effects of radiation on Fukushima’s macaque monkeys

Stark health findings for Fukushima monkeys https://beyondnuclearinternational.org/2018/03/11/stark-health-findings-for-fukushima-monkeys-of-concern-for-humans/ By Cindy Folkers

March 14, 2018 Posted by | environment, Fukushima continuing, radiation, Reference | Leave a comment