nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Scepticism on the enthusiastic claims about nuclear fusion

The nuclear fusion community ended 2022 with a bang, when scientists at the
Lawrence Livermore National Laboratory in California reported that they had
created a reaction that produced more energy than it consumed.

This breakthrough, known as a fusion ignition, was hailed as a historic advance,
a critical step on the road to generating limitless clean energy by
replicating the reactions that power the sun. Following the announcement,
commentators immediately began to speculate about how close scientists are
to achieving that long-held dream.

But any claims about the start of the next clean energy revolution must be regarded skeptically. In part, this is
because when the energy-intensive lasers that produced the reaction are
also accounted for, the total energy used in the experiment was much more
than it created.

Additionally, to turn this kind of fusion reaction into an
actual power source, the same effect would have to be replicated at a much
higher frequency—more like several times a second rather than once a day.
The reality is that fusion energy is nowhere near ready for commercial use.
Nor will it be, until a successful innovation strategy for nuclear fusion
is devised.

Foreign Affairs 31st Jan 2023

https://www.foreignaffairs.com/world/long-way-nuclear-fusion

February 2, 2023 Posted by | 2 WORLD, technology | Leave a comment

GE Hitachi group announce contract for grid-scale small nuclear reactor, requiring large taxpayer subsidy .

GE Hitachi and 3 partners announce first commercial contract for grid-scale SMR in North America.Utility Dive 30 Jan 23

Dive Brief:

  • An energy and construction partnership announced Friday an agreement to build what it says will be the first grid-scale small modular reactor in North America. Terms were not disclosed.
  • GE Hitachi Nuclear Energy, Ontario Power Generation, SNC-Lavalin and Aecon Group signed a contract to deploy a BWRX-300 small modular reactor at OPG’s Darlington New Nuclear Project site in Clarington, Ontario.

…………………………………….. Critics say SMRs, which are advanced nuclear reactors with a power capacity of up to 300 MW(e), according to the International Atomic Energy Agency, are financially feasible only because of large taxpayer subsidies. Detractors also say solar and wind power, which do not produce waste, can be deployed more quickly than SMRs.  https://www.utilitydive.com/news/SMRs-reactor-GE-Hitachi-Ontario-Public-Power-Aecon-Group-nuclear/641483/

January 31, 2023 Posted by | Small Modular Nuclear Reactors, USA | Leave a comment

As SMR developer X-energy moves to go public, merger partner Ares cautions investors about risks

Utility Dive Stephen Singer, Editor, Jan. 27, 2023

Dive Brief:

  • The partner in a merger with a small modular nuclear reactor developer going public has cautioned investors that changing markets and a “limited operating history” may ultimately be unfavorable to the business.

  • Ares Acquisition Corp., a special purpose acquisition company, warned in an S-4 filing with the U.S. Securities and Exchange Commission Wednesday of “limited operating experience for reactors of this type, configuration and scale” that could lead to higher than expected construction costs, maintenance requirements, operating expenses or changes in the timing of delivery. X Energy Reactor Co. announced the merger in December.
  • The market for SMRs generating electric power and high-temperature heat is not yet established and “may not achieve the growth potential we expect or may grow more slowly than expected,” Ares said. It’s backed by private equity firm Ares Management Corp.

Dive Insight:

The S-4 filing, which provides a preliminary proxy statement and spells out details of the renamed X-Energy business and market risks, provides boilerplate cautions to investors who require transparency and discussion of as many potential risks as possible. It highlights challenges in a still-emerging industry. The U.S. Nuclear Regulatory Commission on Jan. 19 certified NuScale Power’s SMR design, the first of its type to win federal approval………………………………

Ares said the market for SMRs, and particularly for SMRs using advanced nuclear technologies such as those employed in the Xe-100 — an 80 MWe reactor that can be scaled into a ‘four-pack’ 320 MWe power plant — has not yet been established. SMRs using advanced nuclear technologies have not been proven at scale, it said……………………..

Ares also warned that it may not attract customers for its SMR technology — a “relatively new and unproven technology” — as quickly as it expects, “or at all,” and acquiring customers may be more expensive than it currently anticipates.

In addition, Ares said the time and funding needed to bring X-energy’s nuclear fuel, TRISO-X, to market at scale may “greatly exceed” expectations………………….

Critics of SMRs have raised issues nearly identical to what Ares cited, calling out the reactors over the projected cost and time needed for siting and other approvals.

“Small modular reactors may be viable one day, but they are not today, will not be tomorrow and may never make as much economic sense as renewable sources of electricity,” the Institute for Energy Economics and Financial Analysis says. “We should stick to carbon-free energy sources that make financial and environmental sense.”………. more https://www.utilitydive.com/news/ares-acquisition-x-energy-smr-sec-investor-warning/641337/

January 29, 2023 Posted by | business and costs, Small Modular Nuclear Reactors, USA | Leave a comment

Nuclear-powered rockets to Mars – there are serious safety risks.

No one wants to see nuclear debris raining down on the Florida coast or Disneyland, and that’s not the only possible scenario.

An accident in orbit could potentially drop radioactive material into the atmosphere.

Nuclear powered rockets could take us to Mars, but will the public accept them?

Bob McDonald’s blog: NASA and DARPA are beginning development of a new fission rocket, Bob McDonald · CBC Radio · Jan 27, 2023 

NASA has signed an agreement with the U.S. Defense Advanced Research Projects Agency (DARPA) to develop a nuclear rocket that could shorten travel time to Mars by about one quarter compared to traditional chemical rockets. But before nuclear technology is launched into space, there are risks that need to be addressed to ensure public safety…………………….

While the technology of nuclear propulsion is certainly feasible, it may not be readily embraced by the public. The accidents at Chernobyl, Three Mile Island and Fukushima have left many people skeptical about nuclear safety. And there will be risk.

A nuclear rocket wouldn’t be used to launch a spacecraft from the Earth’s surface — it would be designed to run in space only. It would have to launch into orbit on a large chemical rocket — so the public would have to accept the risk of launching a nuclear reactor on a standard rocket filled with explosive fuel.

And rockets have and will malfunction catastrophically, in what with black humour rocket scientists sometimes call RUD — “rapid unscheduled disassembly.”

No one wants to see nuclear debris raining down on the Florida coast or Disneyland, and that’s not the only possible scenario. An accident in orbit could potentially drop radioactive material into the atmosphere.

Nuclear technology in another form has been used since the very beginning of the space program, just not for propulsion. Radioisotope Thermoelectric Generators (RTGs) have provided power to deep space probes for instruments, radios and cameras on a range of missions…………………….

 The U.S. has seen several accidents, including one in 1968 when a launch failure of a Nimbus-1 weather satellite threw its RTG into the ocean. It was recovered intact and the fuel was reused on a later mission.

But there have been more serious accidents. Canadians may remember an incident from 1978, when a Soviet reconnaissance satellite scattered 50 kg of uranium from its nuclear thermal generator over 124,000 square kilometres of Canada’s North.

But a fission reactor is a much more complicated device involving higher temperatures, coolants and more nuclear fuel.

……………………. the engineers face a challenge to ensure that all checks and balances have been made to reassure the astronauts who will fly these machines — and people on the ground — that they can be operated safely before the technology is adopted. https://www.cbc.ca/radio/quirks/nuclear-powered-rockets-could-take-us-to-mars-but-will-the-public-accept-them-1.6727217

January 28, 2023 Posted by | 2 WORLD, space travel, wastes | Leave a comment

Rolls Royce wants to make sure that the tax-payer cops the cost of their small nuclear reactor folly

Rolls-Royce calls on government for more clarity on nuclear.  https://www.energylivenews.com/2023/01/26/rolls-royce-calls-on-government-for-more-clarity-on-nuclear/

Executives of the engineering giant have cited Britishvolt as an example of a company which committed to a factory without having orders.

Dimitris Mavrokefalidis

Rolls-Royce has urged the government to provide more clear vision of its target to roll out 24GW of nuclear power generation by 2050.

During a session at the House of Commons Welsh Affairs Committee, asked when Rolls-Royce will start the process of building its first Small Modular Reactor factory, Alastair Evans, Director of Corporate and Government Affairs at Rolls-Royce SMR, said: “If you look at the Britishvolt example, that is an example of a company that committed to a factory without orders. We don’t have clarity on orders in the UK.

“So, as soon as we have that clarity that the UK Government wants to deploy Rolls-Royce SMRs, we will be able to get the first factory moving, but our shareholders need that clarity. Britishvolt is a very good example of where you try and run a business and build a factory and get things moving without that certainty, orders and customers.”

A few days ago, company representatives visited the first four sites which have the potential to host 15GW of new nuclear power capacity.

Mr Evans confirmed that once Rolls-Royce receives the green light from the government, then the whole process around the development of its first SMR facility will accelerate.

He said: “That was the purpose of doing our planning processes, getting the selection of our heavy pressure vessel sites – we’ve got 600 people in the Rolls-Royce SMR business today. So we are set up to deliver at pace. We are 600 UK-based workers looking at manufacturing, assembly, lead skills, and module concept. We are ready to go.” 

January 28, 2023 Posted by | business and costs, politics, Small Modular Nuclear Reactors, UK | Leave a comment

NASA partners with the military to test nuclear fission-powered spacecraft engine by 2027

The technological advancement has long been seen as critical to long-haul missions, including a manned trip to Mars.

Aljazeera 24 Jan 2023

The top official at the United States space agency NASA has said the country plans to test a spacecraft engine powered with nuclear fission by 2027, an advancement seen as key to long-haul missions including a manned journey to Mars.

NASA will partner with the US military’s Defense Advanced Research Projects Agency (DARPA) to develop the nuclear thermal propulsion engine and launch it into space, NASA administrator Bill Nelson said on Tuesday. The project has been named the Demonstration Rocket for Agile Cislunar Operations or DRACO……………………..

Under the NASA-DARPA agreement, NASA’s Space Technology Mission Directorate will lead technical development of the nuclear thermal engine, which will eventually be integrated with an experimental spacecraft created by the military.

The agency said the last US nuclear thermal rocket engine tests were discontinued in the 1970s… https://www.aljazeera.com/news/2023/1/24/nasa-to-test-nuclear-fission-powered-spacecraft-engine-by-2027

January 27, 2023 Posted by | space travel, USA, weapons and war | Leave a comment

Former DEA Nuclear Security Official Says Wyoming Reactor Not Safe

the sodium reactor planned for Kemmerer has a high degree of potential for explosive accidents and proliferation of nuclear weapons material.

Sodium reacts with water and air, which Tallen said poses a huge risk for accidents.

Cowboy State Daily, By Kevin Killough, State Energy Reporter
Kevin@CowboyStateDaily.com  January 25, 2023January 25, 2023 

When TerraPower and PacifiCorp announced in November 2021 that they had selected Kemmerer as the location of its Natrium reactor demonstration project, many welcomed the opportunity as a path to a diverse energy economy for Wyoming.  

In the next few months, TerraPower plans to break ground on a sodium testing project for the larger demonstration project. If the reactor design is proven, it would provide lots of carbon-free energy and provide a viable replacement for retiring coal plants in the state, TerraPower said. 

Wapiti resident Bill Tallen had a 20-year career with the Department of Energy that was focused on the threat posed by terrorists who sought ways to create improvised nuclear devices.

Tallen argues that the sodium reactor planned for Kemmerer has a high degree of potential for explosive accidents and proliferation of nuclear weapons material. Henry Sokoloski, executive director of the Nonproliferation Policy Education Center (NPEC), which is based in Washington D.C., has a lot of the same concerns.  

Jeff Navin, director of external affairs with TerraPower, says these concerns have been considered and addressed as much as reasonably possible in the project’s design and development.  

Not Opposed To Nuclear 

Tallen said he’s not ideologically opposed to nuclear power. He said he rubbed elbows with that crowd years ago, but it’s not where he stands today.  

“The distrust of nuclear power is one of the major ideological tenets of left-wing, anti-establishment politics,” Tallen said. “I had to say to them, I can’t agree with you on many of your basic assumptions. I’m just saying that this particular [Natrium] technology pursued the way it is right now – I don’t think it’s a good idea.”  

Reaction Risk  

The Natrium reactor being built in Kemmerer uses sodium instead of water as a heat sink for the reactor core. That heat will then be transferred to water, which will produce steam to turn turbines.  

Sodium reacts with water and air, which Tallen said poses a huge risk for accidents.  

“There’s never been a sodium reactor that has actually met its promises. They’ve all had leaks and fires and explosions and toxic releases,” Tallen said. “Granted, in America we haven’t had big problems, but the past is not always prologue. The risk is still there.”  ……………………

Plutonium And Proliferation 

Sokolski with NPEC said these reactors produce plutonium during the fission process.  

“The plutonium produced in these machines isn’t just weapons usable. It isn’t even weapons grade. It’s super weapons grade,” Sokolski said.  

The Natrium reactors run on high-assay low-enriched uranium, known commonly as HALEU. It’s currently produced only in Russia, and due to the invasion of Ukraine, supplies of the material are scarce. This has led to a delay in the Kemmerer project.   

Tallen said that as these reactors grow and more HALEU is produced, it’s just inviting a nation like Iran to find sources of the material, which can be enriched to weapons-grade with the right facilities.  

“These are parties that do in fact have, or can construct, enrichment capabilities and will not be concerned by U.S. export restrictions,” Tallen said.  ………………………..  https://cowboystatedaily.com/2023/01/25/former-dea-nuclear-security-official-says-wyoming-reactor-not-safe/

January 25, 2023 Posted by | safety, Small Modular Nuclear Reactors, USA | Leave a comment

New NASA Nuclear Rocket Plan Aims to Get to Mars in Just 45 Days

Science Alert23 January 2023, By MATT WILLIAMS, “…………………………. A few years ago, NASA reignited its nuclear program for the purpose of developing bimodal nuclear propulsion – a two-part system consisting of an NTP and NEP element – that could enable transits to Mars in 100 days.

As part of the NASA Innovative Advanced Concepts (NIAC) program for 2023, NASA selected a nuclear concept for Phase I development. This new class of bimodal nuclear propulsion system uses a “wave rotor topping cycle” and could reduce transit times to Mars to just 45 days………………………….

Nuclear-Electric Propulsion (NEP), on the other hand, relies on a nuclear reactor to provide electricity to a Hall-Effect thruster (ion engine), which generates an electromagnetic field that ionizes and accelerates an inert gas (like xenon) to create thrust. Attempts to develop this technology include NASA’s Nuclear Systems Initiative (NSI) Project Prometheus (2003 to 2005)………………………………………..

A transit of 45 days (six and a half weeks) would reduce the overall mission time to months instead of years. This would significantly reduce the major risks associated with missions to Mars, including radiation exposure, the time spent in microgravity, and related health concerns.

In addition to propulsion, there are proposals for new reactor designs that would provide a steady power supply for long-duration surface missions where solar and wind power are not always available………….. more https://www.sciencealert.com/new-nasa-nuclear-rocket-plan-aims-to-get-to-mars-in-just-45-days

January 24, 2023 Posted by | space travel, USA | 1 Comment

Canadian MP Charlie Angus Questions the Claims of SMRs (Small Modular Reactors)

Proponents of SMRs are on a major spin campaign. None of them have been approved for licensing. The Toronto Star calls them a “boutique boondoggle”. The IPCC raises serious questions about the dangers of nuclear proliferation. Chris Keefer is their big proponent. Here is the exchange at the Natural Resources Committee.


  “Proponents of SMRs are on a major spin campaign. None of them have
been approved for licensing. The Toronto Star calls them a “boutique
boondoggle”. The IPCC raises serious questions about the dangers of
nuclear proliferation.”

January 23, 2023 Posted by | Canada, Small Modular Nuclear Reactors | Leave a comment

U.S. approves design for NuScale small modular nuclear reactor, but significant problems remain.

By Timothy Gardner WASHINGTON, Jan 20 (Reuters) – The U.S. nuclear power regulator has certified the design for the NuScale Power Corp’s (SMR.N) small modular reactor, the first such approval in the country for the next generation technology.

The Nuclear Regulatory Commission’s approval, published in the Federal Register late on Thursday, clears a hurdle for NuScale. The company plans to build a demonstration small modular reactor (SMR) power plant at the Idaho National Laboratory. NuScale says the six-reactor, 462 megawatt Carbon Free Power Project will be fully running in 2030.

There are significant questions about rising costs of the demonstration plant, expected to provide electricity to the Utah Associated Municipal Power Systems (UAMPS). NuScale said this month the target price for power from the plant is $89 per megawatt hour, up 53% from the previous estimate of $58 per MWh.

Backers of next generation reactors including President Joe Biden’s administration and many Republican lawmakers, say they are crucial in curbing climate change. NuScale says they will be safer than today’s far larger conventional reactors, but the reactors, like conventional nuclear plants, are expected to produce highly toxic waste, for which no permanent fix has been developed.

The U.S. Department of Energy has provided more than $600 million since 2014 to support the design, licensing and siting of NuScale’s power plant and other small modular reactors. NuScale and other companies that succeed in building next generation reactors could receive for the first time lucrative production tax credits contained in last year’s Inflation Reduction Act signed by Biden……………..

NuScale also hopes to build SMRs in Romania, Kazakhstan and Poland, despite concerns from nuclear safety experts who say Russia’s invasion of Ukraine and occupation of the Zaporizhzhia plant should make the industry think seriously about developing plants in the region.  https://www.reuters.com/business/energy/us-approves-design-nuscale-small-modular-nuclear-reactor-2023-01-20/

January 21, 2023 Posted by | Small Modular Nuclear Reactors, USA | Leave a comment

A bit of panic in the UK small nuclear reactor lobby?

‘No regrets?”

Quite a lot of people have regrets about the introduction of nuclear power.

And that’s even when the reactor types have been tested.

The new gee-whiz nuclear reactors haven’t even been tested.

Pipeline of ‘no-regrets’ new nuclear schemes needs ‘expediting’

New Civil Engineer16 JAN, 2023 BY ROB HORGAN

A pipeline of “no-regrets” new nuclear schemes must be fast-tracked if the UK is to meet its net zero carbon emission targets, according to an independent [how independent?] review set up to assess the UK’s decarbonisation plans.

It is one of 129 recommendations made by former energy minister Chris Skidmore in his government-ordered net zero review titled Mission Zero.

The report calls for the formation of Great British Nuclear (GBN) to be “expedited in early 2023” so that a “clear roadmap” of future schemes can be developed this year to tackle “rising power demand”.

The government first announced its intention to set up GBN to develop a project pipeline in its British Energy Security Strategy published in April last year.

Skidmore concludes that speeding up the formation of GBN will address industry concerns about a “lack of clarity on the pathway” to achieving the UK government’s ambition for nuclear energy to provide a quarter of power consumed within the country. (Nuclear energy currently supplies 15% of the UK’s power needs.)

The review concludes: “Building new nuclear is a no-regrets option, despite high upfront costs and long construction times”……………….

Pipeline of ‘no-regrets’ new nuclear schemes needs ‘expediting’

16 JAN, 2023 BY ROB HORGAN

A pipeline of “no-regrets” new nuclear schemes must be fast-tracked if the UK is to meet its net zero carbon emission targets, according to an independent review set up to assess the UK’s decarbonisation plans.

It is one of 129 recommendations made by former energy minister Chris Skidmore in his government-ordered net zero review titled Mission Zero.

The report calls for the formation of Great British Nuclear (GBN) to be “expedited in early 2023” so that a “clear roadmap” of future schemes can be developed this year to tackle “rising power demand”.

The government first announced its intention to set up GBN to develop a project pipeline in its British Energy Security Strategy published in April last year.

Skidmore concludes that speeding up the formation of GBN will address industry concerns about a “lack of clarity on the pathway” to achieving the UK government’s ambition for nuclear energy to provide a quarter of power consumed within the country. (Nuclear energy currently supplies 15% of the UK’s power needs.)

The review concludes: “Building new nuclear is a no-regrets option, despite high upfront costs and long construction times.

“In view of rising power demand, nuclear energy can provide reliable baseload power which is not weather dependent and can provide other services to power networks.”

It adds: “To achieve affordability and efficiency, the Government needs to commit to funding a fleet of projects. Recognising the start times for new build nuclear, a clear roadmap for nuclear deployment up to 2035 is required.”

The government is currently committed to building Sizewell C, while construction of Hinkley Point C continues to gather pace. Ambitions to develop a fleet of small nuclear reactors has also been widely supported by government in the past few years.

Skidmore’s review concludes that as well as delivering a pipeline of projects, the government must act to remove barriers to its nuclear ambitions.

It identifies “the main barrier for new nuclear projects is the need for stable, long-term policy and funding commitments given the long timeframes involved in the building of nuclear plants”.

It also points out that “rapid expansion of nuclear power could lead to some bottlenecks in supply chains and skills pools”.

However, the report stresses that “understanding the timings of different projects” would allow “any supply chain and skills pinch points [to] be identified early, allowing for coordinated action to prevent bottlenecks”.

The review also concludes that streamlining planning and consenting decisions would “ensure nuclear projects are not unnecessarily delayed”. Likewise, Skidmore’s review calls for the lengthy protocols required for innovations like SMRs to be accelerated.

National Infrastructure Commission chair Sir John Armitt supports Skidmore’s calls for clarity and accelerated action.

He said: “Chris Skidmore’s clarity in his call for accelerated action is as compelling as it is commendable, nailing the argument that inaction now will cost us all in the long run.

“Given the economic opportunities offered by leading the pack internationally, securing policy and funding stability over the coming years is paramount.”

Nuclear energy recommendations made in Skidmore’s net zero review:

  1. Expedite the set-up of Great British Nuclear in early 2023, ensuring required funding and skills are in place.
  2. Government and GBN to set out clear roadmap in 2023, including interim targets to reach 2050 ambition, and government to ensure funding is in place. As part of the roadmap, government should assess the possibility to increase the current ambitions, supporting the development of supply chain to service a fleet of projects.
  3. Roadmap to set out clear pathways for different nuclear technologies (including small modular reactors) and the selection process. This should consider how to use programmatic approach to deliver further cost reductions in a competitive environment.
  4. Government to deliver on siting strategy by 2024

https://www.newcivilengineer.com/latest/pipeline-of-no-regrets-new-nuclear-schemes-needs-expediting-16-01-2023/

January 17, 2023 Posted by | politics, technology, UK | Leave a comment

Huge cost for Japanese tax-payers to clean up the botched nuclear waste storage at Tokai reprocessing plant

Righting shoddy nuclear waste storage site to cost Japan 36 bil. yen

 https://english.kyodonews.net/news/2023/01/a53b75be634e-righting-shoddy-nuclear-waste-storage-site-to-cost-japan-36-bil-yen.html – 16 Jan 23, The Japan Atomic Energy Agency estimates that it will cost taxpayers 36.1 billion yen ($280 million) to rectify the shoddy storage of radioactive waste in a storage pool at the Tokai Reprocessing Plant, the nation’s first facility for reprocessing spent nuclear fuel, an official said Sunday.

Around 800 containers of transuranic radioactive waste, or “TRU waste,” were dropped into the pool from 1977 to 1991 using a wire in the now-disused plant in Tokai, a village in Ibaraki Prefecture northeast of Tokyo. They emit high levels of radiation.

The waste includes pieces of metal cladding tubes that contained spent nuclear fuel, generated during the reprocessing process. The containers are ultimately supposed to be buried more than 300 meters below surface.

The agency has estimated that 19.1 billion yen will be needed to build a new storage facility for the containers, and 17 billion yen for a building that will cover the storage pool and the crane equipment to grab containers.

The 794 containers each are about 80 centimeters in diameter, 90 cm tall and weigh about 1 ton, with many lying on their sides or overturned in the pool. Some have had their shape altered by the impact of being dropped.

The containers were found stored in the improper manner in the 1990s. While the agency said the storage is secure from earthquakes and tsunamis, it has nonetheless decided to improve the situation.

The extractions have been delayed by about 10 years from the original plan and are expected to begin in the mid-2030s.

The Tokai Reprocessing Plant was the nation’s first plant that reprocessed spent fuel from nuclear reactors to recover uranium and plutonium. Between 1977 and 2007, about 1,140 tons of fuel were reprocessed. The plant’s dismantlement was decided in 2014 and is expected to take about 70 years at a cost of 1 trillion yen.

January 15, 2023 Posted by | Japan, space travel, wastes | Leave a comment

Uncertainty over government funding for Rolls Royce’s small nuclear reactors

 Concerns have been raised that the rollout of small modular reactors
(SMRs) in the UK could be delayed due to funding challenges. According to
The Times, a funding deal for the first fleet of mini nuclear reactors is
not expected to materialise for at least another 12 months, with a row
ongoing in government over the cost of Britain’s wider nuclear ambitions.


Going forward, SMRs, alongside large-scale nuclear plants, are seen as a
crucial tool in the country’s battle against the energy crisis and drive
towards net zero.

The government established a new body called Great British Nuclear (GBN) in conjunction with the release of its energy
security strategy with the aim of facilitating the growth of nuclear power on the grid.

However, Whitehall sources have now revealed that there
remains uncertainty over the government’s SMR investment plans. Rolls-Royce
has called for ministers to enter funding talks and start placing orders.
The firm is planning on building SMR power stations and recently announced
three shortlisted locations for its proposed factory and four potential
sites for the SMR plants themselves.

 New Civil Engineer 9th Jan 2023  https://www.newcivilengineer.com/latest/fears-over-potential-delay-to-small-nuclear-reactor-rollout-09-01-2023/

A plan to build a fleet of mini nuclear reactors across the UK could be
delayed by at least another 12 months amid a row in the government over the
cost of Britain’s nuclear power ambitions. The Sunday Times cited sources
stating that there was still a large degree of uncertainty over the scale
of state investment in small modular reactors (SMRs).

 Energy Live News 9th Jan 2023

January 15, 2023 Posted by | business and costs, politics, Small Modular Nuclear Reactors, UK | Leave a comment

Space junk cowboys are ruining our night sky

 https://www.theage.com.au/national/space-junk-cowboys-are-ruining-our-night-sky-20221212-p5c5kw.html

Virginia Kilborn, Swinburne University chief scientist January 15, 2023

Without action, over the next decade the night sky as we know it will change drastically. Where once we saw constellations of stars, we will see moving constellations of satellites – hundreds and maybe thousands of them moving across the sky. The magic of a shooting star will be lost.

The constellations your parents once pointed out will be harder to find, and as Kamilaroi astrophysicist Krystal De Napoli has explained, the vital reference points that our First Nations astronomers have relied on for tens of thousands of years will no longer be visible.

Astronomers are already dismayed that their view of the universe is increasingly masked owing to optical and radio emissions from the thousands of objects overhead that make it more difficult to conduct paradigm-shifting research.

When it comes to access to space, we are undergoing a technological revolution. Once the domain of multinational companies and government agencies, the new space race is dominated by agile and comparatively young companies taking advantage of small satellite technologies, such as CubeSats –  nanosatellites the size and shape of a Rubik’s Cube.

These smaller satellites allow companies to quickly test new technologies in space and take less energy to launch to their lower-altitude orbits. While they offer significant benefits to us on Earth, such as monitoring weather patterns and natural disasters, and providing internet access to remote communities, they are less reliable, have higher failure rates and shorter lifespans than previous satellites.

We’re seeing the advantages of new design and advanced manufacturing technologies reducing the cost of sending satellites into orbit. But we should also be concerned about disposable space hardware going down the same path as other technologies, such as low-cost plastics. Plastics have allowed for the development of low-cost products, but the lack of life-cycle planning means plastic waste pollution is prevalent across the planet. We need to avoid this short-term thinking when it comes to satellites.

Rather than launching satellites designed for decades of use – for example the GPS navigation system, comprised of around 30 satellites – many companies are now planning for the launch of mega-constellations of thousands of small satellites in low Earth orbit. In the US alone, the Federal Communications Commission is approving tens of thousands of satellites for launch.

Astra has applied for 13,000 satellites, SpaceX has more than 3000 satellites already launched and has sought approval for 9000 more (but they’re looking at more than 30,000 in the future). Amazon has plans for over 3000 more satellites, and Telesat plans for about 2000 satellites with just a 10-year life span.

While small low Earth orbit satellites are designed to burn up in the Earth’s atmosphere on the timescale of a decade or so, they deposit a higher concentration of aluminium than meteoroids. Over time, this will change the composition of the atmosphere. While the weight of satellite debris now entering the atmosphere is about 20 times less than that of meteoroids, satellites are mainly composed of aluminium; meteoroids are less than 1 per cent of that element. The long-term effects of this change could include changing the albedo, or reflective nature of the atmosphere.

With so many satellites in finite orbits above us, there is also a growing danger of collisions, which in turn could increase the amount of space debris orbiting Earth. NASA is already tracking more than 27,000 pieces of space junk and estimated there could be half a million pieces larger than 1 centimetre; and over 100 million pieces smaller than a centimetre.

Steps are being taken to tackle some of these issues. Here in Australia, space scientists, lawyers and policy experts from Swinburne University of Technology, EY, CSIRO’s Data61 and SmartCat CRC are working on a regulatory framework for AI-enabled systems that can operate to avoid collisions, while other projects are looking to remove existing debris and defunct technology from orbit.

Further afield, the International Astronomical Union has formed the Centre for the Protection of the Dark and Quiet Sky from Satellite Constellation Interference to work with technology companies and policymakers to ensure we preserve the night sky for research.

There is a new voluntary sustainability rating being promoted by the World Economic Forum and the US Federal Communications Commission has recently changed the regulations regarding low Earth Orbit satellite disposal, requiring a much quicker re-entry into the atmosphere to ensure these items don’t clog up our sky.

These are positive steps, but we need to go further and reconsider whether we need to launch thousands of satellites in the first place.

Finding better ways to do things now means both harnessing space to improve life on Earth and avoiding the destruction of one of our greatest assets – the night sky.

January 15, 2023 Posted by | 2 WORLD, space travel | Leave a comment

Eye-popping new cost estimates released for NuScale small modular reactor

January 11, 2023 David Schlissel  https://ieefa.org/resources/eye-popping-new-cost-estimates-released-nuscale-small-modular-reactor?utm_campaign=Daily%20Newsletter&utm_medium=email&_hsmi=241307067&_hsenc=p2ANqtz-8xQeLZzsje3jM2qVnPAR5aTsMc4VV_OYGkbUu5uSffqnJCwQATb7GgJFJ2J7e2ifDaYlz0bWs4PMSErYrZnHwLcCCWEA&utm_content=241307067&utm_source=hs_email&fbclid=IwAR1f_fFT-7qPBMSb4zGcxf8SAIL4xEL2r1JrKytsP4wyrdz1xj8yn0oPODM

Key Findings

NuScale and the Utah Associated Municipal Power Systems (UAMPS) announced costs of a 462-megawatt small modular reactor (SMR) have risen dramatically

As recently as mid-2021, the target price for power was pegged at $58 per megawatt-hour (MWh); it’s risen to $89/MWh, a 53% increase.

The price would be much higher without $4 billion federal tax subsidies that include a $1.4 billion U.S. Department of Energy contribution and a $30/MWh break from the Inflation Reduction Act

The higher target price is due to a 75% increase in the estimated construction cost for the project, from $5.3 to $9.3 billion dollars

Last week, NuScale and the Utah Associated Municipal Power Systems (UAMPS) announced what many have long expected. The construction cost and target price estimates for the 462-megawatt (MW) small modular reactor (SMR) are going up, way up.

From 2016 to 2020, they said the target power price was $55/megawatt-hour (MWh). Then, the price was raised to $58/MWh when the project was downsized from 12 reactor modules to just six (924MW to 462MW). Now, after preparing a new and much more detailed cost estimate,  the target price for the power from the proposed SMR has soared to $89/MWh.

Remarkably, the new $89/MWh price of power would be much higher if it were not for more than $4 billion in subsidies NuScale and UAMPS expect to get from U.S. taxpayers through a $1.4 billion contribution from the Department of Energy and the estimated $30/MWh subsidy in the Inflation Reduction Act (IRA). 

It also is important to remember that the $89/MWh target price is in 2022 dollars and substantially understates what utilities and their ratepayers actually will pay if the SMR is completed. For example, assuming a modest 2% inflation rate through 2030, utilities and ratepayers would pay $102 for each MWh of power from the SMR—not the $89 NuScale and UAMPS want them to believe they will pay.

The 53% increase in the SMR’s target power price since 2021 has been driven by a dramatic 75% jump in the project’s estimated construction cost, which has risen from $5.3 billion to $9.3 billion. The new estimate makes the NuScale SMR about as expensive on a dollars-per-kilowatt basis ($20,139/kW) as the two-reactor Vogtle nuclear project currently being built in Georgia, undercutting the claim that SMRs will be cheap to build.

NuScale and UAMPS attribute the construction cost increase to inflationary pressure on the energy supply chain, particularly increases in the prices of the commodities that will be used in nuclear power plant construction.

For example, UAMPS says increases in the producer price index in the past two years have raised the cost of:


  • Fabricated steel plate by 54%  
  • Carbon steel piping by 106%  
  • Electrical equipment by 25%  
  • Fabricated structural steel by 70%  
  • Copper wire and cable by 32%

In addition, UAMPS notes that the interest rate used for the project’s cost modeling has increased approximately 200 basis points since July 2020. The higher interest rate increases the cost of financing the project, raising its total construction cost.

Assuming the commodity price increases cited by NuScale and UAMPS are accurate, the prices of building all the SMRs that NuScale is marketing—and, indeed, of all of the SMR designs currently being marketed by any company—will be much higher than has been acknowledged, and the prices of the power produced by those SMRs will be much more expensive.

Finally, as we’ve previously said, no one should fool themselves into believing this will be the last cost increase for the NuScale/UAMPS SMR. The project still needs to go through additional design, licensing by the U.S. Nuclear Regulatory Commission, construction and pre-operational testing. The experience of other reactors has repeatedly shown that further significant cost increases and substantial schedule delays should be anticipated at any stages of project development.

The higher costs announced last week make it even more imperative that UAMPS and the utilities and communities participating in the project issue requests for proposal (RFP) to learn if there are other resources that can provide the same power, energy and reliability as the SMR but at lower cost and lower financial risk. History shows that this won’t be the last cost increase for the SMR project.

David Schlissel (dschlissel@ieefa.org) is IEEFA director of resource planning analysis

   

January 15, 2023 Posted by | Small Modular Nuclear Reactors | 1 Comment