Court ruling doubts the credibility of nuclear safetysassessments by Japan’s Nuclear Regulation Authority
Ruling calls for review of NRA’s nuclear reactor safety screening, http://www.asahi.com/ajw/articles/13991979, A court ruling cast serious doubt over the credibility of safety assessments by the Nuclear Regulation Authority with regard to the operations of nuclear reactors.
The ruling called into question the safety of reactors restarted with NRA approval after being shut down in the aftermath of the 2011 Fukushima nuclear disaster.
It also underscored an urgent need for a sweeping review of the nuclear regulation system as a whole.
The Osaka District Court on Dec. 3 struck down the NRA’s endorsement of safety measures for the No. 3 and No. 4 reactors at the Oi nuclear power plant in Fukui Prefecture.
It invalidated the green light the nuclear safety watchdog gave in 2017 to Kansai Electric Power Co.’s plan to restart the two reactors.
The court said the NRA’s safety assessment was not fully in accordance with new tougher nuclear safety standards introduced after the catastrophic accident at the Fukushima No. 1 nuclear plant and screening guidelines based on those standards.
The ruling labeled the NRA’s decision as “unreasonable,” asserting there were “errors and deficiencies that cannot be overlooked” in the process of examining and approving anti-earthquake measures the electric utility adopted for the reactors.
In designing measures to protect a reactor against major earthquakes, the operator estimates the maximum possible ground motion generated by an earthquake around the reactor, called “reference ground motion.” It develops steps to ensure the safety of the reactor based on this estimate and requests for NRA approval for restarting the reactor.
The NRA examines the plan and determines whether the estimate is appropriate and the proposed safety measures are sufficient. It grants approval and authorization if it decides the plan meets the new safety standards.
Kansai Electric Power determined the reference ground motion by calculating the magnitude of the maximum credible earthquake based on its own assumptions concerning the length and width of faults around the reactors.
But residents of Fukui and six other prefectures filed a lawsuit to question the utility’s estimate of the reference ground motion. They argued that the utility’s estimate only represents an “average” for the spectrum of possible quakes, meaning that the safety measures are not based on the maximum strength of a possible earthquake in the area.
They cited a newly included provision in the NRA’s screening guidelines that says consideration should be given for the “variability” that arises due to the calculation methods used.
The plaintiffs claimed the NRA’s approval of the anti-quake measures was illegal because it was based on the utility’s questionable reference ground motion figure.
The government countered this argument by saying the utility’s calculation has a sufficient margin of error that makes it unnecessary to consider variability. But the court sided with the plaintiffs.
The ruling puts weight on the reasons for the NRA’s own decision to introduce the “variability” provision into the guidelines and demands that the screening process strictly follow strictly the established procedures.
The NRA should respond to the ruling by first reviewing the process of the safety screening of the two reactors at the Oi plant. It is possible that the screening of other reactors was similarly flawed. The ruling is likely to arouse anxiety among residents living in the vicinity of reactors that have been brought back online. The NRA should make a sincere and convincing response to the court decision.
The No. 3 and No. 4 reactors at the Oi plant are currently offline for regular maintenance. Debate is unnecessary in stating that the utility must not rush to restart the reactors.
Even without the triple meltdown at the Fukushima plant, it is amply obvious that this nation could be hit by unexpectedly severe natural disasters, such as earthquakes, tsunami and volcanic eruptions, at any time.
That makes it all the more important to establish nuclear power standards based on the principle of erring on the side of safety and ensure that safety screening and regulation are strictly based on the standards.
The government, which seems to be bent on restarting reactors, should take this imperative to heart.
Nuclear incident in Belarus: Lithuanian authorities alert citizens
|
LRT 1st Dec 2020, Ecohome, a prominent environmental NGO in Belarus, has reported that Oil Price 3rd Dec 2020, Days after reports emerged that the newly opened Belarus nuclear power
plant suffered an incident, authorities in neighboring Lithuania told the Baltic country’s population on Thursday to stock up on food in case of an incident at the nuclear power facility in Belarus, which is just 30 miles away from Lithuania’s capital city Vilnius.https://oilprice.com/Latest-Energy-News/World-News/Lithuanians-Urged-To-Stockpile-Food-Amid-Reports-Of-Nuclear-Power-Incident.html |
|
Armenia’s ticking time bomb – a decaying Soviet nuclear reactor
Decaying Soviet-era nuclear power plant makes Armenia a ticking time bomb DAILY SABAH, ISTANBUL, DEC 02, 2020 Once Armenia’s defeat against Azerbaijan was put on paper, some Armenians, struggling to face reality, brought up nuclear weapons as a form of potential retaliation. These discussions, however, ignore the fact that Armenia does host nuclear power on its soil but in the form of a decaying Soviet nuclear reactor – a ticking bomb that is not only a threat to Armenia itself but its neighbors as well.
The Metsamor nuclear power plant, located just 16 kilometers (10 miles) from the Turkish border, is one of the oldest nuclear facilities in the world. Built back in 1976, the power plant consists of two VVER-440 Model V270 nuclear reactors, known to be some of the oldest and least reliable reactor models still in use.
Apart from unreliability issues, the power plant also lacks adequate earthquake resistance. While the volcanically-active region is at risk of earthquakes up to magnitude 8, the power plant can only endure a magnitude 7 earthquake, at most. Due to all these issues, Soviet authorities shut down the facility in 1988. However, Armenia reopened it in 1995 due to energy scarcity. Currently, the facility meets nearly 40% of Armenia’s energy needs, thus the security concerns are often ignored. After the collapse of the Soviet Union, the European Union increased its efforts to shut down most Soviet-era nuclear power plants, particularly those in Bulgaria and Slovakia that pose any possible threat. Similar efforts were made for Metsamor, considered to be the most dangerous of them all, but in vain. Armenia rejected the EU’s call to shut down Metsamor in exchange for 200 million euros ($226 million) to help meet the country’s energy needs. Giving up on its hopes of closing the facility, the EU instead provided aid to improve the safety standards at the power plant. Although Armenian officials and the International Atomic Energy Agency (IAEA) claim that there have been major safety upgrades at the facility over the past 20 years, making it no less safe than any other nuclear power plant, given the VVER-440s do not have a containment structure, a characteristic shared with the infamous Chernobyl, its security insurance is still questionable. In fact, many experts still consider it to be one of the world’s most dangerous nuclear facilities. The original closing date of the facility was determined as 2016. However, following an agreement with the Russian state nuclear agency, Rosatom, this date was pushed back to 2026. …… In 2009, the Turkish Atomic Energy Authority (TAEK) warned about the danger of three nuclear power plants, including Metsamor, in neighboring countries. Ankara, which has not had diplomatic relations with Armenia since the 1990s, also urged Yerevan to shut down the plant due to the imminent danger it poses to Turkey. Six years ago, it submitted an official appeal with the IAEA to shut down the plant. https://www.dailysabah.com/world/europe/decaying-soviet-era-nuclear-power-plant-makes-armenia-a-ticking-time-bomb |
|
Incidents at Belarus nuclear station have alarmed neighbouring Lithuania
Lithuania wary of incident at Belarus nuclear plant https://www.euractiv.com/section/politics/short_news/lithuania-weary-of-incident-at-belarus-nuclear-plant/ Benas Gerdžiūnas | 1 Dec 20, LRT.lt/en Lithuania has asked Belarus for clarification after its new nuclear plant located some 50 kilometres from the country’s capital suffered an incident just five days after launch.
Belarus President Alexander Lukashenko took part in the opening of the plant on 6 November, where he said the launch of the Astravyets NPP was as “ordinary” as building a metro.
“Belarus is becoming a nuclear power,” he declared.
Several voltage-measuring transformers outside of the nuclear reactor exploded during an incident on 7 November, according to sources at TUT.by, an independent media outlet in Belarus.
On Monday, the Belarusian Energy Ministry said that “a need to replace the measuring equipment arose” during testing, without providing further details.
Lithuania’s State Nuclear Power Safety Inspectorate (VATESI) said the plant is still undergoing testing. However, “we have also received no information about the [planned] next steps to launch the plant”, VATESI told BNS in a written comment.
Lithuania has been one of the most ardent critics of the nuclear plant built by the Russian state atomic corporation Rosatom and funded by a loan from the Kremlin.
Vilnius says the plant is unsafe and was built in breach of international safety standards. Minsk denies all allegations.
In September, Estonia, Greece, Italy, Latvia, Lithuania and Poland had sent a joint statement to the Director-General of the International Atomic Energy Agency (IAEA) and contracting parties to the Convention on Nuclear Safety (CNS), calling on Belarus to start addressing nuclear safety issues without delay.
At the same time, the Russian company Rosatom is in talks with Belarus about the construction of a second nuclear power plant and a research reactor in the country, Rosatom chief Alexander Likhachev announced on Tuesday in a video statement.
In August, Estonia, Latvia and Lithuania agreed not to purchase electricity from the plant.
The Baltic states are gearing up to switch from the Russian-controlled BRELL electricity grid that also includes Belarus, and synchronise with the continental European system by 2025.
(Benas Gerdžiūnas, LRT.lt/en | Alexandra Brzozowski, EURACTIV.com)
America’s underground radioactive dump – Waste Isolation Pilot Plant facing disruption
Nation’s Only Underground Nuclear Waste Dump Could Face Disruptions, GAO Report Says, https://weather.com/news/news/2020-12-02-underground-nuclear-waste-dump-carlsbad-new-mexico By Jan Wesner ChildsAt a Glance
The only underground nuclear waste dump in the United States is suffering from shortfalls in planning and staffing that could lead to disruptions at the facility, according to a new report from the Government Accountability Office.
The report published last month indicated that the Waste Isolation Pilot Plant near Carlsbad, New Mexico, could become full if the amount of waste shipped to the facility keeps expanding or if a new way of measuring waste is rejected in a pending court challenge, according to the Associated Press. The plant, known as the WIPP, was built in the 1980s for the disposal of defense-related nuclear waste, including clothing, tools, rags, debris, soil and other items contaminated with radioactive elements, according to a fact sheet from the facility. The WIPP’s disposal rooms were carved out of ancient salt beds 2,150 feet below ground. The U.S. Energy Department (DOE) estimates the facility could be full as soon as 2025, and work to expand storage capacity has been delayed. “DOE does not have assurance that WIPP’s planned additional physical space will be constructed before existing space is full, which would result in a potential interruption to disposal operations,” the GAO said in a summary of its report. The facility was shut down after two accidents in 2014 and has been operating at limited capacity since it reopened in 2017. Two ventilation projects need to be completed to return the WIPP to full operations, the GAO said, but those have been met by challenges in oversight and regulatory approval. Construction on a giant utility shaft, which is part of the project, is in danger of being suspended due to missed planning deadlines and the continued spread of COVID-19 at the facility, the Carlsbad Current-Argus reported. The WIPP had recorded 150 cases of COVID-19 as of Nov. 23, according to a news release. The GAO report cited staffing issues dating back to January, when about one-third of positions were vacant in the DOE’s Carlsbad Field Office, responsible for overseeing the project. The DOE has estimated that the WIPP would need to operate for at least 30 years to meet disposal needs, according to the AP. |
|
Why we shouldn’t be talking about nuclear waste “disposal”
All casked up with nowhere to go https://beyondnuclearinternational.org/2020/11/29/all-casked-up-with-nowhere-to-go/ November 29, 2020 by beyondnuclearinternational
Why we shouldn’t be talking about nuclear waste “disposal” By Linda Pentz Gunter, 29 Nov 20
Let’s get one thing clear right off the bat. You don’t “dispose” of nuclear waste.
The ill-suited, now canceled, but never quite dead radioactive waste repository at Yucca Mountain was not a “disposal” site.
The radioactive mud being dredged from the sea bed at the Hinkley C nuclear site in the UK, is not going to get “disposed of” in Cardiff Grounds (a mile off the Welsh coast).
When Germany dumped radioactive waste in drums into the salt mines of Asse, it wasn’t “disposed” of.
Taking nuclear waste to Texas and New Mexico border towns and parking it there indefinitely is not “disposal”.
To talk about radioactive waste “disposal” is simply dishonest. It’s disingenuous at best and deliberately misleading at worst.
In Cardiff Bay, that radioactive waste will get “dispersed.” At Asse, the waste leaked out of the barrels and “dispersed” into water that has flooded the site.
At Yucca Mountain, were it to get a renewed green light, water will eventually carry off those radioactive particles, sending them into groundwater and drinking water downstream of the dump.
“Once you have made radioactive waste, then you are looking at long-term isolation, not disposal,” says Paul Gunter of Beyond Nuclear. “And its cost. And if you are looking to manage the liability of cost, then don’t make it.”
That’s the easiest kind of radioactive waste to “dispose” of. The kind you haven’t made. Because, as Gunter says, “there is no alchemy for radioactive detritus.” Once we’ve made it, it’s with us pretty much forever.
Federal agencies and nuclear corporations continue to wrestle over what to do with the already tens of thousands of tons of high-level radioactive waste (at least 90,000 at last count) generated by America’s commercial nuclear power plants — all casked up with nowhere to go (and a lot of it still in the fuel pools). Because, absent alchemy, that waste is always going to be somewhere, even if we can’t see it.
Once upon a time, the general public understood this. In 1986, when the US Department of Energy was looking for a geological burial site for commercial nuclear waste, it began giving serious consideration to the “granite state” of New Hampshire.
New Hampshire towns — some of which would have been seized and razed by eminent domain to make way for the repository — rose up in opposition. A stunning 100 of them signed a resolution that not only opposed the burial, storage, and transportation of high-level nuclear waste in New Hampshire, but also its production.
A law was eventually passed in New Hampshire that forbade siting a nuclear waste repository in the state, but not banning its generation. The construction of the Seabrook nuclear power plant on the New Hampshire coast progressed, and today the single unit of the two originally planned is duly generating radioactive waste for the state of New Hampshire, with still no place to go.
In fact, the law banning a repository in New Hampshire was quietly, almost covertly, overturned in the New Hampshire state legislature in 2011, a fact uncovered by State Rep. Renny Cushing while writing legislation in 2016. (Cushing is a founder of this country’s first anti-nuclear power group, the Clamshell Alliance, which vigorously opposed the construction of Seabrook.)
https://www.youtube.com/watch?v=BLeYKkA2V7EA German four-part animation piece, humorously demonstrated the impossibility of disposing of radioactive waste. This is the second segment.
In a characteristically stealthy way, the Nuclear Regulatory Commission has ensured there will be no repeat of that New Hampshire defiance. Today, under what was once called the Nuclear Waste Confidence Decision, but is now termed the “Continued Storage of High-Level Waste”, (presumably because no one dare claim any “confidence” about finding a waste solution), an intervention against a reactor license renewal can be disallowed if it is based on contentions challenging the absence of a long-term radioactive waste solution.
This means that our aging fleet of nuclear reactors are free to generate yet more radioactive waste, some of them for another 20 or even 40 years, even though there is still no sign of land when it comes to finding a safe, long-term management plan for what to do with it.
That’s remarkable hubris this far into the nuclear game. Even if one could (very reluctantly) forgive the initial optimistic procrastination — when Fermi achieved the first chain reaction in 1942, but everyone decided the waste problem would be solved later — there is no forgiving it now, 78 years on. That’s more than ample time to have realized that continuing to make more of a lethal substance that you can never dispose of is scientifically and morally reprehensible.
We cannot dispose of radioactive waste. But we can dispose of nuclear power. We should hesitate no longer and do just that.
Linda Pentz Gunter is the international specialist at Beyond Nuclear and writes for and edits Beyond Nuclear International.
Architect of its nuclear programme assassinated – Iran vows retaliation
Mohsen Fakhrizadeh was ambushed with explosives and machine gun fire in the town of Absard, 70km (44 miles) east of Tehran. Efforts to resuscitate him in hospital failed. His bodyguard and family members were also wounded.
There was no immediate claim of responsibility, but the Iranian foreign minister, Mohammad Javad Zarif, said Israel was probably to blame, and an adviser to Iran’s supreme leader, Ayatollah Ali Khamenei, vowed retaliation. “We will strike as thunder at the killers of this oppressed martyr and will make them regret their action,” tweeted Hossein Dehghan.
The killing was seen inside Iran as being as grave as the assassination by US forces of the Islamic Revolutionary Guard Corps commander Qassem Soleimani in January.
Israel will face accusations that it is using the final weeks of the Trump administration to try to provoke Iran in the hope of closing off any chance of reconciliation between Tehran and the incoming US administration led by Joe Biden.
Amos Yadlin, a former head of Israeli Defence Force intelligence, said: “With the window of time left for Trump, such a move could lead Iran to a violent response, which would provide a pretext for a US-led attack on Iranian nuclear facilities.”…….. https://www.theguardian.com/world/2020/nov/27/mohsen-fakhrizadeh-iranian-nuclear-scientist-reportedly-shot-dead-near-tehran
Danger to San Onofre nuclear waste, from ocean’s king tides
Annual High Tide Spurs Concerns About Future Safety of San Onofre Nuclear Waste Stock Near South OC, Voice of OC, By BRANDON PHO November 23, 2020, They’re called king tides:Ocean waves that grow especially tall a few times during the year, rumbling against the California coast and offering a glimpse into future sea level rise and a reshaping shoreline, according to state coastal regulators.
Those tides rolled up to San Onofre last weekend, where a sea wall stands to protect what nearby communities fear is a man-made disaster in waiting: the decommissioned but still radioactive San Onofre Nuclear Generating Station (SONGS). The following week, local officials and activists convened a set of dueling community forums that well capture the ongoing dispute over what exact risk the nuclear waste sitting at SONGS poses to all life within the area joining Orange and San Diego counties. The debate centers on the integrity of SONGS’ nuclear waste storage system, which has been criticized as prone to failure and an ecological and human health hazard. One Nov. 19 forum hosted by nuclear watchdogs saw some of their fears echoed back to them by Dr. Ian Fairlie, a radiation biologist in London who once headed the Secretariat of the UK Government’s CERRIE committee on internal radiation risks……. Members of the public laid out those concerns at an Aug. 20 panel meeting, and the comments can be read here. ……. environmentalists are looking at sea level rise’s impacts on coastlines well into 2100. Edison had previously argued studies into that time frame aren’t necessary……… There’s deep disagreement about what to do with the leftover nuclear waste, all 1,800 metric tons of which are in dry storage and embedded in concrete. The spent fuel contains radioactive isotopes like Cesium-137, the amount of which critics say is comparable to levels released during the Chernobyl disaster of 1986.……… The contention between watchdogs and Edison is the type of dry storage the company chose. Critics say the company has cheaped out through more cost-efficient, but less safe, thin-walled HOLTEC canisters, feared to be more prone to cracking and corrosion from conditions like the plant’s salty seaside locale. Instead, watchdogs have called for the use of thicker casks they say would better stave off the risk of failure and exposure. Fairlie at the Nov. 19 forum, hosted by the Samuel Lawrence Foundation and local nuclear safety groups, said the current canisters in use by Edison are “not very good – they are cheap … 5/8ths of an inch thick, prone to cracking.” They’re “designed to be temporary and they’re not really robust from external attack in my view,” he said, adding “it would be much, much, much better” for the spent fuel to be stored in a thicker cask — “Unlikely to be subject to cracks.” The only problem? “They’re very expensive.” ……… https://voiceofoc.org/2020/11/annual-high-tide-spurs-concerns-about-future-safety-of-san-onofre-nuclear-waste-stock-near-south-oc/ |
|
Waste Isolation Pilot Plant – building of ventilation shaft is halted, due to Covid-19 and planning problems
WIPP: New Mexico regulators halt utility shaft project, cite COVID-19, planning problems, Adrian Hedden, Carlsbad Current-Argus, 25 Nov 20, Construction of a $100 million utility shaft at the Waste Isolation Pilot Plant could be halted after the New Mexico Environment Department denied a request to extend state authorization to build the shaft, citing missed deadlines in the planning of the project and the continued spread in COVID-19 cases at the facility.
The shaft, part of an almost $300 million rebuild of WIPP’s ventilation system, along with a series of fans and filter buildings known as the Safety Significant Confinement Ventilation System (SSCVS), was intended to improve airflow in the WIPP underground and allow for waste emplacement and mining to occur simultaneously along with future expansions of the nuclear waste repository……….
Spike in COVID-19 at WIPP could put workers in danger
NMED also cited a recent rise in COVID-19 cases at WIPP, as the pandemic continued to spread in record-breaking numbers across New Mexico, and the agency’s responsibility to ensure human health is not put at risk by activities under the TA, requesting a plan for COVID-19 mitigation at the facility. https://www.currentargus.com/story/news/local/2020/11/24/wipp-utility-shaft-halted-new-mexico-cites-covid-planning-problems/6397790002/
Security concerns delay Czech nuclear expansion
Czech nuclear expansion faces delay amid concerns of opposition, secret services, EURACTIV.com with Reuters 25 Nov 20, A tender to decide who builds a new unit at a Czech nuclear power plant may face delays after security services and opposition parties raised concerns about the possible participation of bidders from China and Russia, officials said.
According to a document seen by Reuters, a working group of intelligence and foreign policy officials under the Interior Ministry wants conditions imposed to ensure bidders from countries that pose a security risk are disqualified.
The main Czech power utility ČEZ, which is 70% state-owned, has been planning to launch a tender before the end of the year for a 1,200 MW unit at its Dukovany power plant and to pick a winner in 2022.
The project is worth at least $7.24 billion at current prices, making it the country’s biggest investment deal so far, and includes a state commitment to buy power from the plant at profitable terms for ČEZ.
President Milos Zeman has sought closer ties with China and Russia. He has favoured their participation, and the government
But Prime Minister Andrej Babiš said on Monday the tender was not yet ready, and suggested it should not be decided just 10 months before an election……… https://www.euractiv.com/section/energy/news/czech-nuclear-expansion-faces-delay-amid-concerns-of-opposition-secret-services/
Concern in France over lack of expert inspection of nuclear sites
Montel News 24th Nov 2020, The lack of inspections at nuclear sites by safety experts, due to the
coronavirus pandemic, raises fears for the safety of the facilities, union
officials in the energy sector told Montel.
The Nuclear Safety Authority
(ASN) canceled all its physical inspections of nuclear power plants, except
the inspections considered essential, during the first containment in the
spring. Since then, some inspections have resumed in the field but many are
still carried out remotely.
This reduction in on-site checks is
exacerbating a situation where the workforce is already limited and
communication with workers is lacking, say some union officials.
30 more years for Wisconson’s old nuclear power station? Is this a good idea?
NextEra Energy has submitted an application to the Nuclear Regulatory Commission seeking to add 20 years to the licenses for the Point Beach Nuclear plant in Two Rivers, according to a document filed with state regulators…….
Hundreds of casks of nuclear waste are being stored at sites across Wisconsin and neighboring states, costing taxpayers millions of dollars as the federal government struggles to open a permanent storage facility.
Under the agreement, the utility is paying $52.66 per megawatt-hour this year, about 1.8 times the average wholesale price for electricity in the Midwest, according to data from the Energy Information Administration. By 2023, the cost rises to $122.45 per megawatt hour……
Point Beach is the only one of Wisconsin’s three nuclear power plants still in operation.
Decommissioning is nearly complete at the La Crosse Boiling Water Reactor, a 50-megawatt demonstrator plant built by the federal government in 1967 and shut down in 1987. The 1,772-megawatt Kewaunee Power Station was shut down in 2013. Decommissioning is scheduled to begin in 2069, according to the NRC.
As of April, there were 50 dry casks of radioactive waste being stored at Point Beach until the federal government can develop a permanent storage plan. https://journaltimes.com/news/state-and-regional/wisconsins-nuclear-power-plant-operator-seeks-30-more-years/article_da04bd52-ca1b-5401-92a7-d860ab058602.html
Lack of safety documents in Los Alamos National Laboratory’s handling of radioactive wastes.
|
Some paperwork has remained unresolved for years. For example, since at least 2016, LANL does not have compliant safety documents for nuclear facilities, such as the Area G dump. These documents, called documented safety analysis, serve to identify and analyze the hazards associated with the work. Nuclear facilities are required to respond to the analyses in ways that will protect workers, the public and the environment. Some elements of safety documents include fire protection calculations, computer modeling for the dispersion of contaminants, and analyses of the efficiency of the operating controls to prevent releases. The Area G safety documents have languished since 2016 – even though LANL continues to handle, treat, and store plutonium-contaminated and hazardous waste there. Roscetti said there are about 3,100 drums containing radioactive and hazardous waste sitting above ground at Area G. These wastes are destined for the Waste Isolation Pilot Plant (WIPP), but need to be treated or repackaged before shipment. In fiscal year 2020, LANL sent 54 shipments to WIPP. Most of these shipments were newly-generated waste from the fabrication of the triggers for nuclear weapons, or plutonium pits. Each shipment to WIPP can hold 42 55-gallon steel drums
Based on the current shipping rate, if all 3,100 above-ground drums were sent to WIPP at a maximum of 42 drums per shipment, it would take about 18 months. But the amount of radioactivity in each drum dictates how many drums make up each shipment. In the meantime, newly generated waste would be shipped into Area G. In recent virtual meetings, LANL officials have been announced its plans to begin retrieving thousands of buried containers at Area G. Those drums would most likely need to be repackaged before shipment to WIPP. But again, the safety documents have not been developed and approved. Safety documents address not only the repackaging and shipping operations, but also the delicate retrieval operations. There is evidence that some drums have corroded.
CCNS asks why LANL is allowed to continue to operate Area G when safety basis documents have not been properly updated – in the case of Area G, nearly five years…….. http://nuclearactive.org/
|
|
Hazardous plan for Peel Ports to take over the decommissioning of Britain’s dead nuclear submarines
|
Ferret 17th Nov 2020. The company that runs the port at Hunterston in North Ayrshire wants to useit to break up the radioactive hulks of defunct nuclear submarines, The Ferret can reveal. A plan by Peel Ports, released under freedom of information law, discloses that the firm sees “opportunities” for military submarine decommissioning at Hunterston.
But the idea has brought condemnation from politicians, environmental and community groups. They warn that the transport and dismantling of submarines would be “potentially hazardous” and could cause “significant environmental damage”. The 50-strong group of nuclear free-local authorities (NFLA) in the UK pointed out that prolonged public consultations had resulted in
agreement that decommissioning should only take place at Rosyth and Devonport. “If Peel Ports is lobbying for a change in that policy to undertake this work at Hunterston port, we would be concerned,” said NFLA Scotland’s convenor, SNP Glasgow councillor, Feargal Dalton. There were “complicated and potentially hazardous transport issues of moving
submarines from the east to the west coast of Scotland, and the required level of expertise to do this,” he argued. “It would also require a new consultation process at a time when the last one took years to deliver. I doubt the Ministry of Defence would like to reopen that process – and if they do, we and others will robustly challenge any significant change that increases the hazards to this operation.” https://theferret.scot/hunterston-peel-ports-nuclear-submarines/ |
Bangladesh draws up a nuclear disaster response plan
The National Nuclear and Radioactive Emergency Preparedness and Response Plan was approved at a virtual cabinet meeting chaired by Prime Minister Sheikh Hasina on Monday.
The guideline was authorised to put safety measures in place for the Rooppur nuclear power plant, Cabinet Secretary Khandker Anwarul Islam said during a press briefing at the Secretariat.
“The International Atomic Energy Commission stipulates the availability of safety guidelines and response plans for such power plants, or else they will not allow us to run it. We have drafted it following the guideline structure from IAEA,” he said.
“The Ministry of Disaster Management and Relief plays the key role in all sorts of disaster management in the country. The National Nuclear and Radioactive Emergency Preparedness and Response Plan was created in keeping with Bangladesh’s disaster management and such other plans.
The cabinet secretary pointed out that authorities actually have little idea about dealing with nuclear power mishaps and emergency responses and the guideline would provide a way forward if such situations occur. …….
https://bdnews24.com/bangladesh/2020/11/16/bangladesh-approves-nuclear-disaster-response-plan
-
Archives
- June 2026 (230)
- May 2026 (306)
- April 2026 (356)
- March 2026 (251)
- February 2026 (268)
- January 2026 (308)
- December 2025 (358)
- November 2025 (359)
- October 2025 (376)
- September 2025 (257)
- August 2025 (319)
- July 2025 (230)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS