nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Regulator: Venting at Fukushima reactor failed

safe_image.php.jpg
Thursday, Nov. 28
Japan’s nuclear regulator says it believes that the operator of the crippled Fukushima Daiichi nuclear plant failed to properly vent a vessel containing one of the plant’s reactors in the days after the March 2011 accident.
Tokyo Electric Power Company attempted to vent the containment vessel of the No.2 reactor to lower interior pressure and prevent equipment from being damaged.
The Nuclear Regulation Authority said on Thursday that its analysts examined parts of piping used in the venting.
They said no significant contamination was found on the piping, showing that radioactive gas was not released through the pipes.
The regulator says it believes the venting was not conducted as planned due to unknown reasons.
An investigation by TEPCO also showed a similar result.
It is believed that a massive amount of radioactive gas was released from the No.2 reactor into the environment, but the source of the leak has not been determined.
The regulator plans to look into the level of radioactivity inside the No.3 reactor next month.

December 2, 2019 - Posted by | fukushima 2019 | , ,

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: