nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

AREVA – now called “Fromatome” – working on faults in nuclear reactor components

Romandie 18th July 2018 Framatome (formerly Areva NP) has completed the analysis of the anomalies
detected on the manufacturing files of components manufactured on its site
of Le Creusot (Saône-et-Loire) for the French reactors of EDF, and the
factory is now “fully operational,” said Wednesday a company executive. The
audit launched in 2015 after detecting the existence of anomalies involved
three phases: an inspection step, or a review of “nearly 4,000 files”, then
a technical analysis phase of any discrepancies raised. which is “totally
finished for all the parts of the French park”, said David Emond, director
of the division Components of Framatome, during a press point in Le
Creusot. “We still have to finish a number of foreign customers, and it
will be done at the end of the year,” he added. The Nuclear Safety
Authority (ASN) must now complete the study, reactor by reactor as
scheduled maintenance stops by EDF, the results transmitted by Framatome.
https://www.romandie.com/news/937602.rom

Advertisements

July 20, 2018 - Posted by | France, safety

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: