TEPCO aims to build more Fukushima-type nuclear reactors, vows to ‘excel in safety’ this time

Fukushima Daiichi nuclear power plant
1 Jul, 2018
TEPCO is conducting an independent geological survey to confirm the absence of active faults in Aomori Prefecture, where it wants to resume the construction of a Fukushima-type nuclear plant, frozen following the 2011 disaster.
“It’s necessary to form a consortium for building a nuclear plant that is excellent in safety, technology and economy,” TEPCO President Tomoaki Kobayakawa said in Tokyo, announcing the decision to conduct a survey of the Aomori Prefecture nuclear site.
The Higashidori Nuclear Power Plant hosts two adjoining sites administered by Tohoku Electric Power Company and Tokyo Electric Power Company (TEPCO). While Tohoku Unit 1 began commercial operations in December 2005, TEPCO never got a chance to finish their unit, the construction of which began only in January 2011. All activity at the site has ceased since the March 2011 Fukushima nuclear meltdown.
TEPCO’s survey, scheduled for completion by 2020, will check the fault structure under the site using a two-kilometer-long tunnel, Kobayakawa said on Friday. Previous studies of terrain beneath the area by the Nuclear Regulation Authority (NRA) found the likely presence of multiple active, seismogenic faults. However, both TEPCO and the Tohoku Electric Power Company decided to conduct further ‘independent’ investigations to review the validity of the NRA findings.
The energy company wants to build two reactors at the site and is exploring ways to meet the stricter government regulations introduced following the Fukushima disaster. Higashidori units, however, would still use the same type of boiling-water, light-water reactors that suffered meltdown at the Fukushima plant, Japan Times noted.
“As we restart the (Higashidori) project, I want to make sure that a new plant would excel in safety,” Kobayakawa told a press conference. “The geological survey is a very significant step to move forward on the joint development of Higashidori,” he noted, adding that TEPCO has asked major utility companies in the country to contribute to the construction and operation of the Higashidori plant.
Three of the Fukushima plant’s six reactors were hit by meltdowns in 2011, after a 9.0-magnitude earthquake and subsequent tsunami struck the facility, resulting in the world’s worst nuclear disaster since Chernobyl in 1986.
No comments yet.
-
Archives
- December 2025 (223)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS



Leave a comment