nuclear-news

The News That Matters about the Nuclear Industry

Not easy, nor cheap, to shut down South Africa’s Koeberg nuclear plant

The Conversation 25th Jan 2018, Why decommissioning South Africa’s Koeberg nuclear plant won’t be easy.
Koeberg has two units, each generating 930 MW, which contribute about 4% of
South Africa’s power capacity. They were built by French developer
Framatome, now called Areva.

Researchers in France, Germany and the UK have
calculated widely different costs for nuclear cleanups (including waste
disposal) in their countries. The potential cost of decommissioning a site
comparable to Koeberg according to the French costing model would be R8.4
billion. Some analysts say this is unrealistically low. The German model
puts the number at around R39 billion and the UK model at R76 billion.
https://theconversation.com/why-decommissioning-south-africas-koeberg-nuclear-plant-wont-be-easy-89888

Advertisements

January 27, 2018 - Posted by | decommission reactor, South Africa

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: