nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Was the Nuclear Control Room Panel Fire at Quad Cities Caused By a Defective GE-Hitachi Switch?

Mining Awareness +

US NRC:  Control Room Panels (Nov. 2007)
US NRC Photo: Control Room Panels (unknown nuclear power station), Nov-2007; black and white photo of Quad Cities Control Rm at Blog Post Bottom

At Quad Cities Nuclear Power Station: “On February 1, 2017, at 1929 hours [CST], a fire was discovered on the Unit 2 Main Control Room panel 902-3 in the 3E ERV/ADS [Electromatic Relief Valve-Automatic Depressurization System ] valve switch… No automatic isolations/actuations occurred. The fire was extinguished at 1932 and the reactor remained at 100% power. “An Alert was declared at 1938 [CST].”The initiation of the event was attempting to change a light bulb. The cause of the event is under investigation. https://www.nrc.gov/reading-rm/doc-collections/event-status/event/2017/20170202en.html The control room is just that – it is to control the nuclear reactors. This is not good. Hitachi centers around the Mizuho group, in trouble a few years ago for lending to the Japanese mob (yakuza): http://www.japantimes.co.jp/news/2013/11/09/business/hitachis-consumer-credit-unit-caught-up-in-mizuho-yakuza-loan-scandal

The fire was…

View original post 2,225 more words

February 9, 2017 - Posted by | Uncategorized

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: