Cover of Fukushima reactor 1 building to be removed
The operator of the crippled Fukushima Daiichi nuclear plant has decided to resume work to dismantle the cover of the No.1 reactor building later this month.
The work is part of efforts to decommission the facility, which suffered a meltdown after the March 2011 earthquake and tsunami disaster.
A hydrogen explosion damaged the No.1 reactor building. Tokyo Electric Power Company installed the cover to prevent radioactive material from dispersing.
The utility initially planned to start dismantling the cover last year to clear away radioactive rubble and remove spent nuclear fuel stored at a pool inside the building.
The plan was postponed several times after people expressed concern about the dispersal of radioactive substances.
Engineers also found a problem with a device that controls the air flow in the building when dismantling work was set to begin in May.
The engineers say they have addressed the problem. TEPCO decided to resume the dismantling work on July 28th as long as weather conditions permit.
As part of the plan, chemical agents will be sprayed to prevent radioactive dust from being released into the air.
Engineers plan to remove the six roof panels in about 4-months’ time.
Source : NHK
http://www3.nhk.or.jp/nhkworld/english/news/20150716_01.html
No comments yet.
-
Archives
- December 2025 (223)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS



Leave a comment