nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Despite President Macron, France’s government report calls new nuclear power uneconomical

Building new nuclear plants in France uneconomical -environment agency https://af.reuters.com/article/commoditiesNews/idAFL8N1YF5HCGeert De Clercq, DECEMBER 11, 2018 

State environment agency contradicts Macron on new nuclear

* New nuclear reactors would be structurally loss-making

* Renewables could account for 85 pct of power mix by 2050.

Building new nuclear reactors in France would not be economical, state environment agency ADEME said in a study on Monday, contradicting the government’s long-term energy strategy as well as state-owned utility EDF’s investment plans.

In a speech last month, President Emmanuel Macron said nuclear energy would remain a promising technology for producing low-cost, low-carbon energy and that EDF’s EPR reactor model should be part of future energy options.

Macron has also asked EDF to draw up a plan for building new reactors with a view to making a decision about nuclear in 2021

Two EPR reactors under construction in France and Finland are years behind schedule and billions of euros over budget.

“The development of an EPR-based nuclear industry would not be competitive,” ADEME said, adding that new nuclear plants would be structurally loss-making. bit.ly/2GlEbcT

Building a single EPR in 2030 would require 4 to 6 billion euros of subsidies, while building a fleet of 15 with a total capacity of 24 gigawatt-hour by 2060 would cost the state 39 billion euros, despite economies of scale that could bring down the EPR costs to 70 euros per megawatt-hour (MWh), ADEME said.

Renewables costs could fall to between 32 and 80 euros/MWh, depending on the technology, by 2060.

But extending the existing fleet too long, while also building new EPRs, would lead to overcapacity, compromising returns on all generation assets, including renewables.

EDF – which generates about 75 percent of French electricity with 58 nuclear reactors – declined to comment.

The ADEME report, which studied energy mix scenarios for 2020-2060, said renewables could account for 85 percent of power generation by 2050 and more than 95 percent by 2060, except if the government pushes through the EPR option anyway.

The gradual increase of renewables capacity could reduce the pre-tax electricity cost for consumers – including generation, grids and storage – to about 90 euros per MWh, compared to nearly 100 euros today, ADEME said.

ADEME director Arnaud Leroy, appointed in February, helped write the energy chapter of Macron’s election programme and was a spokesman for his campaign, but the agency is independent and earlier studies have also contradicted government energy policy.

In 2015, a ADEME study suggesting that France could switch to 100 percent renewable energy by 2050 at a cost similar to sticking with nuclear was barred from publication for months by the government. reut.rs/2RLGKG8 (Reporting by Geert De Clercq; editing by David Evans)

Advertisements

December 11, 2018 - Posted by | business and costs, France, politics

No comments yet.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.

%d bloggers like this: