To secure 2020 Olympics Japan’s PM Abe lied about Fukushima nuclear plant being ‘under control’
Abe’s Fukushima ‘under control’ pledge to secure Olympics was a lie – former PM
http://www.channelnewsasia.com/news/asiapacific/abe-s-fukushima-under-control-pledge-to-secure-olympics-was-a/3108276.html07 Sep 2016 TOKYO: Japanese Prime Minister Shinzo Abe’s promise that the crippled Fukushima nuclear plant was “under control” in his successful pitch three years ago for Tokyo to host the 2020 Olympic Games “was a lie”, former premier Junichiro Koizumi said on Wednesday.
Koizumi, one of Japan’s most popular premiers during his 2001-2006 term, became an outspoken critic of nuclear energy after a March 2011 earthquake and tsunami triggered meltdowns at Tokyo Electric Power Co’s (Tepco) Fukushima Daiichi plant, the worst nuclear disaster since Chernobyl in 1986.
Abe gave the assurances about safety at the Fukushima plant in his September 2013 speech to the International Olympic Committee to allay concerns about awarding the Games to Tokyo. The comment met with considerable criticism at the time.
“Mr. Abe’s ‘under control’ remark, that was a lie,” Koizumi, now 74 and his unruly mane of hair turned white, told a news conference where he repeated his opposition to nuclear power.
“It is not under control,” Koizumi added, citing as an example Tepco’s widely questioned efforts to build the world’s biggest “ice wall” to keep groundwater from flowing into the basements of the damaged reactors and getting contaminated.
“They keep saying they can do it, but they can’t,” Koizumi said. Experts say handling the nearly million tonnes of radioactive water stored in tanks on the Fukushima site is one of the biggest challenges.
Koizumi also said he was “ashamed” that he had believed experts who assured him that nuclear power was cheap, clean and safe and that resource-poor Japan had to rely on nuclear energy.
After the Fukushima crisis, Koizumi said, “I studied the process, reality and history of the introduction of nuclear power and became ashamed of myself for believing such lies.”
All Japan’s nuclear plants – which had supplied about 30 percent of its electricity – were closed after the Fukushima disaster and utilities have struggled to get running again in the face of a sceptical public. Only three are operating now.
Abe’s government has set a target for nuclear power to supply a fifth of energy generation by 2030.
The meltdowns in three Fukushima reactors spewed radiation over a wide area of the countryside, contaminating water, food and air. More than 160,000 people were evacuated from nearby towns.
(Reporting by Linda Sieg and Megumi Lim; Editing by Nick Macfie)
No comments yet.
-
Archives
- May 2026 (72)
- April 2026 (356)
- March 2026 (251)
- February 2026 (268)
- January 2026 (308)
- December 2025 (358)
- November 2025 (359)
- October 2025 (376)
- September 2025 (257)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS
Leave a comment