TEPCO starts prep work to take cover off damaged Fukushima reactor
https://www.youtube.com/watch?v=zegUw_-igIU&index=4&list=PLXoGEAuG5VBc1UnIK4JahERTogr53jXU8
The operator of the Fukushima Daiichi nuclear plant began work on Friday morning to dismantle the cover of the No.1 reactor building.
The cover was installed after the March 2011 nuclear accident to prevent radioactive dust from dispersing. The reactor experienced a hydrogen explosion at the time of accident.
Tokyo Electric Power Company plans to remove the cover in order to clear away radioactive debris on the upper part of the building and remove spent nuclear fuel still stored inside. It is part of an effort to decommission the reactor.
For about one week, workers will spray chemicals over the debris inside the cover by using a remote-controlled crane to prevent radioactive dust from spreading.
They will proceed with the work to remove the cover over the period of about one year. Company officials say they will enhance monitoring of radiation levels during the procedure.
TEPCO says a preliminary test last year showed no scattering of radioactive materials when dismantling the cover.
The utility initially planned to start dismantling the cover on the No.1 reactor building in July of last year. But the work was delayed after the removal of debris from the No. 3 reactor in 2013 caused radioactive dust to spread, sparking fear among local residents. The death of workers at the plant also affected the plan.
Source: NHK
http://www3.nhk.or.jp/nhkworld/english/news/20150515_08.html
Tokyo Electric Power Co. began preparations on May 15 to remove the cover around a damaged reactor building at the crippled Fukushima No. 1 nuclear power plant, the first step in a lengthy process to extracting nuclear fuel inside it.
The work is part of a preparatory process that could take several years for the eventual removal of nuclear fuel from the spent fuel pool in the No. 1 reactor building.
On the first day of the work, TEPCO, the plant operator, sprayed a chemical agent in the reactor building to prevent radioactive dust in the building from being released into the air when the cover is removed.
On May 15, a large crane lifted a spraying machine to insert a thin, long nozzle into the building through holes created on the top cover to spray a glue-like chemical to contain dust and other materials generated by a hydrogen explosion triggered by the March 2011 Great East Japan Earthquake and tsunami.
The agent will be sprayed through the nozzle at 48 points. After it completes the spraying, TEPCO plans to begin retracting the roof cover on May 25 at the earliest to remove debris from the upper part of the building.
When the utility was removing debris from the No. 3 reactor building in the summer of 2013, a large amount of radioactive substances was released into the environment, fostering the public’s distrust in the process.
Subsequently, TEPCO has cautiously been proceeding with preparations for removing the cover around the No. 1 reactor building, such as testing anti-scattering agents in advance last October.
Because it is currently rice planting season around the Fukushima plant, TEPCO has pledged to suspend its work and inform surrounding local governments within 30 minutes when amounts of released dust and radiation exceed certain levels.
Source: Asahi Shimbun
http://ajw.asahi.com/article/0311disaster/fukushima/AJ201505150060
1 Comment »
Leave a comment
-
Archives
- December 2025 (313)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS


Reblogged this on Head Space and commented:
Overt, overexposure ?