nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Nuclear waste removal under way at silo.

COMMENT. Doesn’t that tell you everything about the stupidity of the men who design the nuclear industry?

Jonny Manning, Local Democracy Reporting Service, 1 Nov 25, https://www.bbc.com/news/articles/cvgvq930vwpo

Seventy tonnes of radioactive waste have been removed from a nuclear site’s most hazardous building.

Teams at Sellafield in Cumbria have removed the waste from the Magnox Swarf Storage Silos with the company saying it has placed it into safe storage.

The work began in 2022 after two decades of preparation, because when the building was constructed in the 1960s no-one had considered how the waste would be removed.

Sellafield’s head of legacy silos Phil Reeve said so much waste had been removed that a 7m (23ft) crater had been dug in the middle of the pile.

However, the crater presents a risk of the waste around the edges collapsing inwards.

To fix the issue, Sellafield has created its own version of a garden rake – a 1.4 tonne machine which uses its stainless steel arms to pull the nuclear waste into the centre.

“It’s a big moment to see it successfully deployed in an active environment for the first time,” said Mr Reeve.

“It allows us to crack on with confidence.”

This involved assembling huge retrieval machines on top of the building’s 22 waste compartments.

One machine is currently up and running with another two set to start soon.

But while work is well under way, the Sellafield team still has about 10,000 tonnes of waste to remove.

November 3, 2025 - Posted by | UK, wastes

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.