nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Construction starts of Belgian disposal facility

 Belgium’s Prime Minister Bart De Wever has laid a foundation stone,
marking the start of construction of a surface disposal facility for low-
and intermediate-level, short-lived waste at the Dessel site in Belgium.
The facility will consist of several concrete bunkers that will house large
concrete vaults in which short-lived low- and intermediate-level waste will
have been encapsulated with mortar. Currently, 28,831 vaults are planned,
spread across two zones: 20 bunkers in the first and 14 in the second. The
Dessel facility will house all Belgian low- and intermediate-level,
short-lived radioactive waste including that from nuclear power plants,
hospitals, research institutes and the decommissioning of nuclear
facilities. Currently, this waste is managed by national radioactive waste
management agency ONDRAF/NIRAS’s industrial subsidiary Belgoprocess in
several dedicated buildings on the Dessel site.

 World Nuclear News 19th Sept 2025, https://www.world-nuclear-news.org/articles/construction-starts-of-belgian-disposal-facility

September 21, 2025 - Posted by | EUROPE, wastes

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.