US nuclear plant unfit for quick resurrection, former lead engineer says

By Timothy Gardner, WASHINGTON, Aug 2 2024, (Reuters)
– The first U.S. nuclear plant to ever try reopening after undergoing preparations for permanent closure is not fit to restart anytime soon because it sidestepped important safety work for years before retirement, a former official at the reactor said.
Power company Entergy (ETR.N), opens new tab closed the Palisades reactor in Michigan in 2022, after the plant generated electricity for more than 50 years. Privately-held Holtec International bought Palisades shortly after and has since secured a $1.52 billion conditional U.S. loan guarantee to restart. Holtec seeks to open the plant in about a year.
The fate of Palisades is closely watched by the nuclear industry as at least two other shuttered plants, including a unit at Constellation Energy’s (CEG.O)
, opens new tab Three Mile Island, consider reopening…………
“I’m pro-nuclear, but they selected the wrong horse to ride to town on,” said Alan Blind, who was engineering director at the Palisades plant from 2006 to 2013 under Entergy.
Blind said the plant got exemptions from the U.S. Nuclear Regulatory Commission, the nuclear safety regulator, allowing it to fall short of safety design standards that more modern plants must adhere to because it was nearing retirement.
Those safety standards include prevention of cooling systems being clogged by the breakdown of insulation on pipes, defense against earthquakes, and reduction of risks to fires, Blind said, adding he had been monitoring the plants’ exemption requests since his retirement.
“I’m worried that the NRC will not insist that the generic safety issues be the fixed before they allow Palisades to restart,” Blind told Reuters………………………………………………………..
The Biden administration’s Loan Programs Office at the Department of Energy issued Holtec a conditional $1.52 billion loan guarantee in March to restart Palisades. … https://www.reuters.com/business/energy/us-nuclear-plant-unfit-quick-resurrection-former-lead-engineer-says-2024-08-02/
2 Comments »
Leave a comment
-
Archives
- December 2025 (236)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS


Opening mothballed nuclear plants is like playing Russian Roulette. Nuclear power is inherently unsafe, too expensive and totally unnecessary for our energy needs. Stop this insanity! Shut them down and dismantle them “with all deliberate speed.”
[…] right: ““I’m pro-nuclear, but they selected the wrong horse to ride to town on“. (see https://nuclear-news.net/2024/08/04/2-b1-us-nuclear-plant-unfit-for-quick-resurrection-former-lead-e… 😉 Keep this important fact in mind: in US history, there has never been a re-start of a shut […]
Pingback by Response to Excellent Questions of Georgetown Treasurer DeWitt at Utilities Committee // Gov Whitmer and Rep Huizenga’s emphasis to get the Palisades nuclear reactor up and running in 2025 reflects the fact that they know our grid needs a Campbell repla | January 15, 2025 |