Inside Fukushima: Eerie drone footage reveals first ever look at melted nuclear reactor with 880 tonnes of radioactive fuel still inside – 13 years after disaster
Daily Mail, By PERKIN AMALARAJ, 20 Mar 24
Eerie new drone footage has for the first time revealed the extent of the damage to the Fukushima nuclear power plant 13 years on from its meltdown.
The plant’s operators, Tokyo Electric Power Company Holdings, or TEPCO, released 12 photos from inside the site, which are the first ever images from inside the main structural support called the pedestal in the hardest-hit reactor’s primary containment vessel, an area directly under the reactor’s core.
Officials had long hoped to reach the area to examine the core and melted nuclear fuel which dripped there when the plant’s cooling systems were damaged by a massive earthquake and tsunami in 2011.
The high-definition color images captured by the drones show brown objects with various shapes and sizes dangling from various locations in the pedestal.
Parts of the control-rod drive mechanism, which controls the nuclear chain reaction, and other equipment attached to the core were dislodged by the drones.
TEPCO officials said they were unable to tell from the images whether the dangling lumps were melted fuel or melted equipment without obtaining other data such as radiation levels.
The drones did not carry dosimeters to measure radiation because they had to be lightweight and maneuverable.
About 880 tons of highly radioactive melted nuclear fuel remain inside the three damaged reactors.
TEPCO is attempting to learn more about its location and condition to facilitate its removal so the plant can be decommissioned.
The drone cameras could not see the bottom of the reactor core, in part because of the darkness of the containment vessel, officials said.
But the large amount that remains unknown about the interior of the reactors suggests how difficult it will be. Critics say the 30-40 year target for the plant’s cleanup set by the government and TEPCO is overly optimistic.
The daunting decommissioning process has already been delayed for years by technical hurdles and the lack of data……………………………….. https://www.dailymail.co.uk/news/article-13214131/Inside-Fukushima-Eerie-drone-footage-reveals-look-melted-nuclear-reactor-880-tonnes-radioactive-fuel-inside-13-years-disaster.html
—
No comments yet.
-
Archives
- December 2025 (236)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS


Leave a comment