nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

£485m clean-up operation for UK’s 10 nuclear reactors

A team featuring Keltbray and Costain is one of several firms to win spots
on a £485m framework to carry out demolition and asbestos removal work
across all of the UK’s 10 nuclear reactors. The pair and a second team
called Celadon Alliance, comprising Altrad Support Services, KDC Veolia
Decommissioning Services and NSG Environmental, have been awarded framework
contracts for both Lots 1 and 2.

In addition, Kaefer UK & Ireland has been
awarded a framework contract for Lot 1 and a team featuring Nuvia, Rainham
Industrial Services and Hughes and Salvidge has been awarded a framework
contract for Lot 2. Called the Decommissioning and Asbestos Removal
framework, work includes jobs at all 10 reactor sites, two research sites
and one hydro-electric plant, which are all operated by Magnox on behalf of
the Nuclear Decommissioning Authority.

The framework is initially for four
years with an option to extend up to a further two years. Jobs will include
demolition and deplanting, turbine hall cleaning, removal and treatment of
radioactively contaminated plant, including cooling ponds and water
treatment facilities.

Building 22nd June 2023

https://www.building.co.uk/news/keltbray-team-to-share-485m-of-nuclear-decommissioning-work/5123793.article

June 24, 2023 - Posted by | decommission reactor, UK

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.