nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

FirstEnergy’s Perry Nuclear Power Plant had an Emergency Shutdown Saturday, Still Not in Operation

FirstEnergy’s Perry Nuclear Power Plant had an Emergency Shutdown Saturday, Still Not in Operation By Sam Allard on Wed, Jul 31, 2019 The nuclear power plant in Perry, Ohio, operated by the FirstEnergy Nuclear Operating Company (FENOC), had an emergency shutdown Saturday evening.

The Nuclear Regulatory Commission’s (NRC) event log shows that at 7:29 p.m. on July 27, the reactor automatically shut down after a “main turbine trip.”

Via the event log’s summary, the trip was “not complex,” but its cause is still unknown and is being investigated by FENOC. ….. https://www.clevescene.com/scene-and-heard/archives/2019/07/31/firstenergys-perry-nuclear-reactor-had-an-emergency-shutdown-saturday-still-not-in-operation

August 1, 2019 - Posted by | general

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.