nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

France’s nuclear corporation, EDF, faces the first of many mammoth nuclear plant burials

L’Express 22nd Feb 2019 , Sooner or later, EDF will have to close power plants. Facing  the corporation is a vast building project  with many unknowns. And in the middle flows the Meuse.

Nestled in one of its loops, a few kilometers from the Belgian border, the two cooling towers of the Chooz nuclear power plant spew their plumes of white smoke. On the other side of the river, under the wooded hillside that has taken the colors of autumn, EDF is leading the dismantling of Chooz A.

Shut down since 1991 this reactor, installed in an\ artificial cavern, saw its installations gradually dismantled and
evacuated. Still to settle the fate of the tank. Perched on a metal bridge over a deep pool where she was dipped, a handful of Swedish engineers from the American company Westinghouse remotely maneuver the articulated arms of a robot that cut it. A long work, which must last until 2022. After which, the cave Chooz A will be filled with sand, for eternity.

https://lexpansion.lexpress.fr/actualite-economique/les-travaux-d-hercule-du-demantelement-nucleaire_2040298.html

February 25, 2019 - Posted by | decommission reactor, France

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.