New defects detected in AREVA’s European Pressurised Nuclear Reactor (EPR)
Times 14th Dec 2017, A French-designed nuclear reactor ordered by Britain is facing further
scrutiny after the disclosure that defects were detected in one of the same models under construction in China. The revelation adds to the string of setbacks that have hit the European Pressurised Reactor (EPR) designed by Areva, the French nuclear group.
Britain has ordered two of those reactors for Hinkley Point C. They are being built by EDF, the French state energy
giant, and China General Nuclear Power Corporation at a cost of £19.5 billion.
China General Nuclear Power Corporation, which is building two reactors in a joint venture with EDF near Macau in southern China, said it had found “local defects” in the Taishan 1 reactor. It said that welding in the deaerator, which is used to remove oxygen from water circuits, was defective. The parts had been replaced, it said.
Taishan 1 is due to come on stream this month to become the world’s first functioning example of the
European reactor. The second Chinese reactor, Taishan 2, is due to come online next year. The $8.7 billion project was initially due to be completed last year, but was delayed by safety concerns.
The problems in China pale by comparison with those affecting other projects. Work on a similar reactor at Olkiluoto in Finland began in 2005 and was supposed to finish in 2009. It is now expected to be in action from 2019. EDF is also
building a reactor at Flamanville in Normandy which was due to begin operating in 2012, but won’t be working until the end of next year. The reactors at Hinkley Point were originally due to be operational in 2025 but EDF said this summer that they were likely to be 15 months late.
https://www.thetimes.co.uk/edition/business/new-defects-in-hinkley-type-reactor-tjj0cprhz
No comments yet.
-
Archives
- December 2025 (277)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS


Leave a comment