nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Finland’s nuclear regulator demands safety check for Olkiluoto 3 nuclear reactor’s pressure vessel

Nuclear watchdog seeks re-check of Olkiluoto 3 reactor yle 18 Apr 15 The Finnish Radiation and Nuclear Safety Authority (STUK) is demanding that energy utility TVO carry out new tests of the durability of the pressure vessel planned for the Olkiluoto 3 nuclear reactor. This follows a recent discovery by French officials of inconsistencies in the mechanical toughness of a vessel made for a similar reactor, also being built by the French company Areva.

pressure vessel olkiluoto

The third unit for the Flamanville, France reactor was built by Areva in France, while the one to be used in the Finnish reactor has been assembled in Japan. Both units are of the European Pressurised Reactor (EPR) type.

“There are inconsistencies in the material that the reactor vessel is made of,” Tapani Virolainen, Deputy Director of STUK’s Nuclear Reactor Regulation Department, confirmed to Yle…….Virolainen explains that anomalies were found in both the reactor vessel head and reactor vessel bottom head. He says STUK will ask TVO to re-check the reactor vessel’s manufacturing process…….http://yle.fi/uutiset/nuclear_watchdog_seeks_re-check_of_olkiluoto_3_reactor/7937448

April 20, 2015 - Posted by | Finland, safety, technology

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.