nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Japan quietly removing debris from Reactor 3 Spent Fuel Pool at Fukushima I Nuclear Power Plant

spent-fuel-rods Fukushima I NPP Reactor 3: Debris Removal from Spent Fuel Pool Has Started  JANUARY 1, 2014 There were a few news outlets in late November and early December last year that reported TEPCO would start removing the debris from the Reactor 3 Spent Fuel Pool at Fukushima I Nuclear Power Plant in mid December. Hardly anyone paid attention. (No one probably thought it was possible.) Then there was no news of it actually starting.

Well, news or not, the work started on December 17, 2013. That information was shared at the meeting on December 26, 2013 on “Roadmap to Decommissioning”, which was available via live feed on the net. However, unless you are one of the dwindling number of reporters and net citizens who continue to follow the accident by attending/watching such meetings, you wouldn’t know……..(excellent graphics)…

Kyodo also reports that two cranes will be used, and up to 11 monitoring cameras will be used. All the work will be done by remote-controlled vehicles and equipment. No information whether the human workers are to be posted near the work for further safety monitoring.

All of the MOX fuel that TEPCO had at the plant was in the reactor itself at the time of the accident. http://ex-skf.blogspot.com.au/2014/01/fukushima-i-npp-reactor-3-debris.html

January 3, 2014 - Posted by | Fukushima 2014

No comments yet.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.