Nuclear Affordability Depends on Massive Subsidies: let’s end them
End Taxpayer Subsidies for Nuclear Power Veterans Today, By Dr Stuart Jeanne Bramhall, 31 Oct 13 One week we learn the stricken Fukushima nuclear plant has contaminated the entire North Pacific with via the daily discharge of 300 tons of radioactive water into the ocean. The following week we learn that Britain has approved the first new, “totally safe” nuclear power plant in 35 years, at Hinkley Point in Somerset. The snow job being perpetrated on the British and American public is that nuclear energy creates electricity without emitting carbon dioxide and that it’s cheaper than renewable energy. Neither is true.
A Little Problem of Nuclear Waste
Nuclear energy only looks cheap and carbon neutral if you take plant construction and nuclear waste disposal out of the equation. The US, British, French, Chinese and other governments driving the current nuclear renaissance don’t want you to think about nuclear waste disposal. This is because the technology required to safely neutralize and store spent plutonium that remains radioactive for 10,000 years has yet to be invented.
Finland has come the closest, with the launch of a $3 billion excavation of an underground depository at Onkalo. Since the US site at Yucca Mountain was defunded in 2010, most countries have been leaving their spent fuel rods lying around in containment pools. At Fukushima, the spent rods were on the roof of the stricken reactors – before they melted down and spewed immeasurable amounts of radiation into the air and groundwater. In Britain, most nuclear “decommissioning” happens at a former nuclear weapons site called Sellafield. Despite a government allocation of more than ₤67 billion to the facility, the spent rods are still lying around in open pools. No one can figure out what to do with them.
Nuclear Affordability Depends on Massive Subsidies
Aside from the unsolvable nuclear waste dilemma, nuclear power plants are also incredibly expensive to build, owing to extensive safety/containment requirements. None have been built anywhere without major government subsidies. Prime Minister David Cameron boasts that Hinkley Point will be the very first to be constructed without government support. Instead of committing taxpayer funds to its construction, Cameron is guaranteeing that British consumers will pay a price for Hinkley Point power that is double what they currently pay.
At present the British public pay an average of ₤0.05 (7 ½ US cents) per kilowatt hour (kwh) for electricity produced by existing coal and gas powered plants. In sealing the deal with the French-Chinese consortium building Hinkley Point, Cameron has locked British consumers into paying twice that – ₤0.092 or 14 cents per kwh – when Hinkley Point comes on line in 2023.
Deceptive Claims About Renewable Energy
Cameron’s claims that the above price will be competitive with renewable energy are also extremely deceptive. Fossil-fuel based electricity continuously increases in price over time. This is due to growing oil and gas scarcity and the prohibitive cost of clean coal technology. In contrast, renewable energy costs keep coming down, as cheaper technologies come to market and increased volume slashes per-unit production costs.
Already the price the British government (and the BBC) cites for solar energy is out of date. They incorrectly list the current cost of British-produced solar electricity at ₤0.125 (19 cents) per kwh. However, thanks to the recent availability of cheap Chinese photovoltaic cells (PVCs), a British solar unit installed in 2013 produces electricity for 11 cents per kwh. This rate is expected to drop as low as 3 cents per kwh in coming years – and even lower as cheaper alternatives to silicon come on board. In Seattle, the cost of solar-based electricity is already down to 7 cents per kwh.
Ignoring the Cheapest Renewable Sources……..
Obama’s Nuclear Obsession
Obama, of course, is even more pro-nuclear than his British counterpart. According to Zero Hedge, his 2013 energy policy includes $14-16 billion dollars in loan guarantees for 8,400 Megawatts of new nuclear power. In other words, six or seven new nuclear plants. This is despite warnings by Congressional Budget office of a 50 percent risk contractors will default on their loans. According to the CBO:
“The key factor accounting for the risk is that we expect that the plant would be uneconomic to operate because of its high construction costs, relative to other electricity generation sources.”
As usual, Obama is less concerned about taxpayers than his friends in the nuclear industry who helped finance his political career. http://www.veteranstoday.com/2013/10/31/end-taxpayer-subsidies-for-nuclear-power/
No comments yet.
-
Archives
- December 2025 (286)
- November 2025 (359)
- October 2025 (377)
- September 2025 (258)
- August 2025 (319)
- July 2025 (230)
- June 2025 (348)
- May 2025 (261)
- April 2025 (305)
- March 2025 (319)
- February 2025 (234)
- January 2025 (250)
-
Categories
- 1
- 1 NUCLEAR ISSUES
- business and costs
- climate change
- culture and arts
- ENERGY
- environment
- health
- history
- indigenous issues
- Legal
- marketing of nuclear
- media
- opposition to nuclear
- PERSONAL STORIES
- politics
- politics international
- Religion and ethics
- safety
- secrets,lies and civil liberties
- spinbuster
- technology
- Uranium
- wastes
- weapons and war
- Women
- 2 WORLD
- ACTION
- AFRICA
- Atrocities
- AUSTRALIA
- Christina's notes
- Christina's themes
- culture and arts
- Events
- Fuk 2022
- Fuk 2023
- Fukushima 2017
- Fukushima 2018
- fukushima 2019
- Fukushima 2020
- Fukushima 2021
- general
- global warming
- Humour (God we need it)
- Nuclear
- RARE EARTHS
- Reference
- resources – print
- Resources -audiovicual
- Weekly Newsletter
- World
- World Nuclear
- YouTube
-
RSS
Entries RSS
Comments RSS



Leave a comment