nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

USA to cut social welfare, health, but increase spending on nuclear weapons

Some say Social Security and Medicare are under the gun, yet nobody’s talking about the $185 Billion increase to “modernize” America’s Nuclear arsenal and delivery systems…..

President ‘Nuclear Free World’ Obama and the Tea Party have resurrected policies that led to America’s First Great Depression.

The FY 2012 budget for the National Nuclear Security Administration includes 7.6 billion for nuclear weapons research and production.

66 Years of Nuclear Insanity and Real Change will do US good, Eileen Fleming Salem-News.com (CLERMONT, Fla.) 8 August 11,  – This August 6th and 9th mark the 66th anniversaries of the most brutal acts of terrorism upon innocent people; America’s atomic bombings of Hiroshima and Nagasaki.

It has been spun ad’nauseum those actions “saved thousands of American lives” but the Pentagon and White House knew that Japan was ready to surrender and all they wanted was to “save face” and retain their emperor.

But the Manhattan Project was the steamroller for the Industrial Military Complex Continue reading

August 9, 2011 Posted by | USA, weapons and war | Leave a comment

USA to spend $185 billion on nuclear weapons

How to Save a Quarter of a Trillion Dollars, HUFFINGTON POST, Lawrence Wittner, 8 Aug 11 In the midst of the current stampede to slash federal spending, Congress might want to take a look at two unnecessary (and dangerous) “national security” programs that, if cut, would save the United States over a quarter of a trillion dollars over the next decade.

The first of these is the Obama administration’s plan to spend at least $185 billion in the next ten years to “modernize” the U.S. government’s nuclear weapons arsenal. At present, the U.S. government possesses approximately 8,500 nuclear warheads, and it is hard to imagine that this country would be safer from attack if it built more nuclear weapons or “improved” those it already possesses. Indeed, President Barack Obama has declared — both on the 2008 campaign trail and as President – that he is committed to building a world without nuclear weapons. This seems like a perfectly sensible position — one favored by most nations and, as polls show, most people (including most people in the United States). Therefore, the administration should be working on securing further disarmament agreements — not on upgrading the U.S. nuclear arsenal in preparation for future nuclear confrontations and nuclear wars…….

by scrapping plans for nuclear weapons “modernization” and for national missile defense — programs that are both useless and provocative — the United States would save $271 billion (well over a quarter of a trillion dollars) in the next ten years. Whether used to balance the budget or to fund programs for jobs, healthcare, education, and the environment, this money would go a long way toward resolving some of the nation’s current problems.– …http://www.huffingtonpost.com/lawrence-wittner/budget-cuts-nuclear-missile_b_921157.html

August 9, 2011 Posted by | USA, weapons and war | Leave a comment

UK and Japanese govts collude with nuclear industry to minimise Fukushima news

[the UK government] invited Westinghouse, Areva and EDF Energy, all pillars of nuclear power production, to contribute to government briefs and statements. “We need to all be working from the same material to get the message through to the media and the public,” ….Such spin and manipulation of information is likely to continue in the coming months as the industry struggles to recover. 

(includes video)After Fukushima: the collusive nuclear industry fightback   Independent Australia, 6 August 11, On the 66th anniversary of Hiroshima today, in a week whenrecord levels of radiation have been found at Fukushima, David McNeill looks at the way the nuclear industry has corruptly colluded with regulators in Japan and Britain to quieten valid public safety concerns about nuclear power. Continue reading

August 9, 2011 Posted by | spinbuster, UK | Leave a comment

Solar energy becoming cheaper than coal

 it’s too bad our elected leaders see no value in spurring the next generation of energy technology rather than preserving tax cuts for oil and coal companies that are making record profits

5 breakthroughs that will make solar power cheaper than coal, Mother Nature Network, Karl Burkart, 8 Aug 11 Solar technology charges forward despite Washington’s backward march. Continue reading

August 9, 2011 Posted by | renewable, USA | Leave a comment

15 years later -work still continuing on getting rid of nuclear reactor

Visitors allowed into the decontamination workshop at Lubmin must wear radioactivity detectors and change into special protective clothing.

Working from inside containers, equipped with portholes, employees use high-pressure water, abrasive dust jets and acid baths to decontaminate the rooms one at a time.

“Don’t think radioactivity just disappears. It stays there as ground dust which has to be disposed of,” says Uwe Kopp, in charge of one of the workshops…..

Contaminated material from the plant is held in dozen of containers and barrels, awaiting a final government decision on a site for long-term storage.

Getting rid of a German nuclear plant, one rivet at a time, Google News By Aurelia End (AFP) –8 Aug 11,  LUBMIN, Germany — In Germany, where all nuclear power reactors are to close by 2022, clean-up work at one such plant still continues after 15 years, a sign of how long a real end to the atomic age here will take. Continue reading

August 9, 2011 Posted by | decommission reactor, Germany | Leave a comment

Climate Change Increases Nuclear Danger

In the coming months, you’re going to hear presidential candidates talk about climate change. You probably won’t hear them say much about nuclear safety. But the two are inextricably linked. A warmer climate leads to more severe storms, which increases the chances of a Japan-style nuclear meltdown…..Either we need to get out of the nuclear energy business or reduce our greenhouse gas emissions — or both.-

Climate change, nuclear power risks linked, Sun Sentinel August 05, 2011|By Anthony Orlando 

 It can’t happen here.

The Japanese tsunami was a freak occurrence. Once in a thousand years. It can’t happen to our nuclear power plants.

But freak occurrences are happening more often nowadays. Continue reading

August 9, 2011 Posted by | climate change, USA | Leave a comment

Indigenous peoples cop the uranium pollution by rich corporations

“The biggest problem of uranium mining is slow and constant emission of radiation which leads people to suffer from cancer, kidney problems, and other respiratory diseases.Future generations would be the worst sufferers,” she said. Due to uranium mining, groundwater level goes down, while water, used for agriculture and drinking, is polluted. 

”Rich countries encourage uranium mining in poor nations”, IBN Live,,Aug 07,2011, Kadapa(AP), Aug 7 (PTI) Developed nations are taking up uranium mining in third world countries despite themselves being endowed with rich deposits of the mineral to avoid possible environmental pollution, Continue reading

August 9, 2011 Posted by | 2 WORLD, indigenous issues | Leave a comment

Radioactive leakage causes shutdown of nuclear plant

Nine Mile Point nuclear plant shuts down, WSJ 8 Aug 11, SCRIBA, N.Y. — Officials at Constellation Energy are investigating a leakage in a containment structure that caused the shutdown of the Nine Mile Point Unit 2 reactor on Lake Ontario over the weekend.

The Oswego Palladium-Times reports that the reactor remained shut down Sunday after a “higher-than-normal leakage” was discovered inside the facility’s drywell (http://bit.ly/qVJmf3 ). The incident was classified as an “unusual event,” the lowest level of nuclear power plant emergencies.

Constellation Energy Nuclear Group spokeswoman Jill Lyon said the drywell is the containment structure surrounding the reactor vessel and associated piping. She said the reactor will remain shut down until the necessary repairs and post maintenance testing are finished.

Neil Sheehan of the Nuclear Regulatory Commission said it appears the source of the leakage is a valve on a recirculation pump…http://online.wsj.com/article/AP9933d2a7fcba4ef0b37c9e1384b212de.html

August 9, 2011 Posted by | safety, USA | Leave a comment

$196 million in advance for nukes that might never be built!

FPL to ask customers to pay $196 million to plan nukesSun Sentinel By Julie PatelAugust 8, 2011 Florida Power & Light wants to charge customers $196 million next year for costs to plan nuclear projects that may not be built…. FPL has proposed expanding four existing reactors and building two new ones. The proposed expansions still require approvals from federal and state agencies.

“I think it’s the paying in advance that I resent without something concrete in the making,” said Emily Doucette, a retiree in Pompano Beach…..

Critics plan to raise several key issues:

Cost-overruns. FPL should not have abandoned getting bids “with price-assured contracts” and other traditional construction practices meant to control costs for construction work related to the proposed expansions of four existing reactors, according to the Office of Public Counsel, the state’s advocate for utility customers. FPL implemented this “fast-tracked” approach to meet it goals for completion but the consumer advocate’s office argues that the move is leading to “rapidly increasing estimates of the cost to complete the…the projects” and they may end up costing more than FPL’s alternative plan, not to do them.

Transparency. The consumer advocate’s office also recommends that the PSC fine FPL a penalty for allegedly violating a rule that requires utilities to report estimated nuclear planning costs if they want to charge customers for them.

An investigator hired by FPL found last year that the utility provided “inaccurate and incomplete” information to regulators about the growing costs of its nuclear expansions. The consumer advocate’s office examined the issue itself and found that FPL’s cost estimates increased by $444 million in the months before it testified on costs but it did not report the changes….

Uncertainty. Both FPL and Progress Energy Florida are allegedly violating a rule that requires utilities that want to charge customers for nuclear planning costs to have a clear intent to build them, according to the Southern Alliance for Clean Energy. Last year, both utilities announced “delaying major capital expenditures” to build new reactors last year – and instead, said they would focus on the getting the required licenses – because of the uncertainty involved, SACE wrote to the PSC.

The Florida Industrial Power Users Group, a group that represents consumers that are businesses, said utilities should prove the projects are the most reasonable and cost-effective way to serve customers…..http://weblogs.sun-sentinel.com/business/realestate/housekeys/blog/2011/08/fpl_to_ask_customers_to_pay_19.html

August 9, 2011 Posted by | business and costs, USA | Leave a comment

India’s National Green Tribunal wants study of nuclear radiation’s effects

Green tribunal asks govt to study nuclear radiation, Chetan Chauhan, Hindustan Times, New Delhi, August 07, 2011 In a decision which could have wide environmental ramifications, the National Green Tribunal has asked the environment ministry to consider impact of nuclear radiation emanating from coal based power plants. The NGT order was following a submission regarding public hearing for environment
 clearance for thermal plant in Maharashtra, where study on nuclear radiation from the plant was not conducted.

The occurrence of adioactive substances from the sites of Thermal Power Plants in India have been been reported widely. A recent study by National Geophysical Laboratory found high quantity of nuclear radiation in Chandraapur Thermal power plant in Maharashtra.  …..

The tribunal has also asked the ministry to study the impact of radiaton on local population who live in close vicinit of the thermal plant. “We have been informed that there is large population residing within 2 to 3 KM from the project site,” the bench said….http://www.hindustantimes.com/Green-tribunal-asks-govt-to-study-nuclear-radiation/Article1-730553.aspx

August 9, 2011 Posted by | environment, India | Leave a comment