nuclear-news

The News That Matters about the Nuclear Industry Fukushima Chernobyl Mayak Three Mile Island Atomic Testing Radiation Isotope

Japan’s nuclear regulator OKs removal of fuel rods from Unit 4 Fukushima

DangerJapan OKs fuel removal from pool at nuclear plant Mail.com, TOKYO (AP) October 30, 2013 — Japanese regulators on Wednesday formally approved the removal of fuel rods from an uncontained cooling pool at a damaged reactor building considered the highest risk at a crippled nuclear plant.

Removing the fuel rods from the Unit 4 cooling pool is the first major step in a decommissioning process that is expected to last decades at the Fukushima Dai-ichi plant, where three reactors melted down after the March 2011 earthquake and tsunami. The Nuclear Regulation Authority said at its weekly meeting that the proposal by the plant’s operator, Tokyo Electric Power Co., is appropriate and that the removal can start in November as planned, following an on-site inspection by regulators. Japanese public broadcaster NHK said the removal would start as early as Nov. 8, but TEPCO said it may not announce the date in advance, citing security reasons…… TEPCO has reinforced the structure around the pool and says the Unit 4 building can survive a major earthquake, but the unenclosed pool on the unit’s top floor, which contains 1,533 fuel rods, has caused international concern. About 200 of the rods that are unused and safer are expected to be the first to be removed……. it would be a disaster if fuel rods are pulled forcibly and are damaged or break open when dropped from the pool, located about 30 meters (100 feet) above ground, releasing highly radioactive material. “I’m much more worried about this than contaminated water,” Tanaka said.

TEPCO has prepared a massive steel structure that comes with a remote-controlled crane to remove the fuel rods, which will be placed into a protective cask and transferred to a joint cooling pool inside a nearby building. To make room for the Unit 4 fuel rods, the company has been moving those already in the joint pool to safer storage in dry casks at a separate plant location.

The utility plans to empty the Unit 4 pool by end of 2014, and remove fuel rods from other pools at three other wrecked reactors over several years before digging into their melted cores around 2020. The Fukushima plant has had a series of mishaps in recent months, including radioactive contaminated water leaks from storage tanks, adding to concerns about TEPCO’s ability to safely close down the plant. http://www.mail.com/news/world/2427376-japan-oks-fuel-removal-pool-nuclear-plant.html

October 31, 2013 - Posted by | Fukushima 2013

2 Comments »

  1. Reblogged this on News-Press.

    Farshid's avatar Comment by press inside | October 31, 2013 | Reply

  2. Reblogged this on Dogma and Geopolitics.

    carinaragno's avatar Comment by carinaragno | October 31, 2013 | Reply


Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.